← Back
BuildNYC
Elevator cooperative
98 PARK TERRACE EAST
MANHATTAN · Inwood · BIN 1065025
💬 Discuss this project
1949Year Built
6Stories
D4Building Class
R7AZoning
42,763 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized75 Active Violations 74 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · 9,400 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPride Property Management CORP.1p · 2 filings · 16 docs
Floor 6Pride Property Management CORP.1 filing · 11 docs
Floor 5Pride Property Management CORP.1 filing · 11 docs
Floor 4Pride Property Management CORP.1 filing · 11 docs
Floor 3Pride Property Management CORP.1 filing · 11 docs
Floor 2Pride Property Management CORP.1 filing · 11 docs
Floor 1Pride Property Management CORP.5p · 3 filings · 15 docs
Site & exteriorPride Property Management CORP.14p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Terrace Manor1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rand Engineering & Architecture204/24/2024
Asr Engineering107/07/2023
Mohammad Ahead, PE206/13/2022
Kazi Associates105/03/2022
Asif Jamil, RA109/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch403/21/2026
Expediting303/21/2026
Danico Services203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Inder ConstructionScaffold707/08/2026
AZ Group ContractingGeneral Contractor603/21/2026
Rock Group NYScaffold407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266204/24/2024
HRF Services5616207/07/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/22/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/17/2026
Elevator Category 1 inspection report filed
06/23/2026
Closed: Failed to file FISP cycle 9C technical report by 2/21/2024
DOB violation · closed on the city's record
06/23/2026
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed on the city's record
227 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAZ Group Contracting08/31/2023
DOB NOWSidewalk ShedSigned-offInder Construction07/07/2023
DOB NOWSupported ScaffoldSigned-offInder Construction06/14/2022
DOB NOWSidewalk ShedSigned-offInder Construction06/07/2022
DOB NOWGeneral ConstructionSigned-offAZ Group Contracting05/16/2022
DOB NOWSidewalk ShedSigned-offRock Group NY12/19/2018
DOB NOWSidewalk ShedSigned-offRock Group NY09/21/2018
BISOTISSUEDSM Construction USA08/23/2018
BISOTISSUEDSquan Construction Services03/11/2015
BISPLISSUEDLegacy Plumbing & Heating11/21/2014
BISOTISSUEDJR Construction and Renovation11/18/2014
BISOTISSUEDSquan Construction Services11/14/2014
BISFSISSUEDAll American Heating08/20/2014
BISOTISSUEDTotal NY Construction11/06/2013
BISEQISSUEDPilku Construction Services12/26/2012
BISOTISSUEDImperial General Construction09/10/2012
BISEQISSUEDPilku Construction Services08/02/2012
BISOTISSUEDImperial General Construction07/20/2012
BISPLISSUEDAce-Atlas Plbing & Heating07/12/2012
BISOTISSUEDBci Communications02/05/2009
BISOTISSUEDBci Communcations04/10/2008
BISOTISSUEDDolmen Construction and Restoration01/28/2008
BISOTISSUEDBci Communcations11/14/2007
BISMHISSUEDVertical Solutions08/30/2004
BISOTISSUEDKay Waterproofing05/16/2002
BISEQISSUEDRockledge Scaffold04/08/2002
2 projects · most recent 06/07/2022
FiledStatusContractorScope
06/07/2022Permit IssuedRichard Neu—
08/24/2018CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/02/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
05/02/2024FinalYevgeniy Gurevichprogress
05/02/2024Energy Code Compliance InspectionsYevgeniy Gurevichprogress
05/02/2024Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
05/02/2024Post-installed AnchorsYevgeniy Gurevichspecial
05/02/2024Structural Steel - High Strength BoltingYevgeniy Gurevichspecial
05/02/2024MasonryYevgeniy Gurevichspecial
04/19/2024FinalYevgeniy Gurevichprogress
04/19/2024Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
04/19/2024Structural Steel - High Strength BoltingYevgeniy Gurevichspecial
04/19/2024Tenant Protection Plan Compliance—special
04/19/2024Energy Code Compliance InspectionsYevgeniy Gurevichprogress
04/19/2024MasonryYevgeniy Gurevichspecial
04/19/2024Post-installed AnchorsYevgeniy Gurevichspecial
04/25/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/21/2022FinalFAHAD FATEHprogress
09/20/2018Preliminaryasif jamilprogress
08/25/2018Finalasif jamilprogress
172 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account