980 5TH AVENUE
MANHATTAN · BIN 1046426
💬 Discuss this project
1968Year Built
25Stories
D4Building Class
R10Zoning
202,777 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized3 Active Violations 1 unresolved · 2 paperwork only 5 likely answered 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 980 Fifth Avenue · 12,243 sf lot · 16.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCentury ManagementUnder Construction2p · 2 filings · 11 docs
Floor 25Residence Renovation11p · 2 filings · 20 docs
Floor 24Unit 24B13p · 2 filings · 10 docs
Floor 23Plumbing for duplex apartment interior renovationUnder Construction18p · 1 filing · 20 docs
Floor 22Plumbing for duplex apartment interior renovationUnder Construction18p · 1 filing · 20 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17Unit 17A28p · 4 filings · 20 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Unit 11B3p · 1 filing · 12 docs
Floor 10Unit 10A22p · 6 filings · 20 docs
Floor 9Unit 9A42p · 4 filings · 20 docs
Floor 8
Floor 7
Floor 6Unit 6A10p · 1 filing · 11 docs
Floor 5
Floor 4Unit 4B1 filing · 6 docs
Floor 3
Floor 2
Floor 1Century Management1p · 2 filings · 18 docs
CellarCentury ManagementUnder Construction7p · 4 filings · 20 docs
Sub-Cellar3p · 1 filing · 6 docs
Site & exteriorCentury ManagementUnder Construction43p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
980 Fifth Avenue5303/22/2026
980 5th Ave2203/21/2026
Eight Twelve303/21/2026
980 Third Avenue303/21/2026
283 Greene103/22/2026
George103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York503/21/2026
Jonathan B. Held A.I.A203/21/2026
Enkay Design Consulting603/21/2026
William Vitacco Associates603/21/2026
Build Nexus103/21/2026
JM Zoning1203/21/2026
Costa1403/21/2026
Domani Consulting103/21/2026
Green Light Expediting1203/21/2026
PCS Engineering103/21/2026
Bay Restoration203/21/2026
Agouti Construction Consulting203/21/2026
K & M Associates503/21/2026
Jonathan B Held AIA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Classic Restorationspecialty_contractor1307/08/2026
Riverside BuildersGeneral Contractor907/08/2026
Silverlining InteriorsGeneral Contractor803/21/2026
New Amsterdam RestorationScaffold510/09/2026
WF Plumbing and HeatingPlumbing407/08/2026
Ambassador ConstructionGeneral Contractor403/21/2026
V. Disalvo Contracting CoGeneral Contractor307/08/2026
Henry Myers P & HPlumbing307/08/2026
Sea-Dar EnterprisesGeneral Contractor303/21/2026
S. DonadicGeneral Contractor210/07/2026
Allboro Building MaintenanceScaffold203/21/2026
Donato PlumbingPlumbing210/09/2026
P.S.I. MechanicalPlumbing207/08/2026
New Amsterdam Restorationspecialty_contractor108/20/2026
Norlin Electrical ContractorsElectrical103/21/2026
Donald McGeachyElectrical103/21/2026
Malmar Electric CoElectrical103/21/2026
Structural Preserv SystemGeneral Contractor104/09/2026
Bay RestorationScaffold107/08/2026
Lenlite Electrical ContractorsElectrical103/21/2026
New Millennium P & HPlumbing107/08/2026
Premier Flow Plumbing and HeatingPlumbing107/08/2026
S.B.A. PlumbingPlumbing107/08/2026
P & Z ElectricElectrical103/22/2026
Palace SamuelElectrical103/21/2026
Dynamic Electrical ContractorsElectrical103/21/2026
Coachmen ElectricElectrical103/21/2026
Vertex ElectricElectrical103/22/2026
V. Vass ElectricElectrical103/22/2026
Warren Ostroff ElectricElectrical103/21/2026
Alef Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666408/31/2026
Urban Integrations7993107/30/2026
Crosscheck Inspection Services544101/21/2026
AG Engineering8899109/26/2025
Macia Inspection & Testin402606/02/2025
Atlas ATC Engineering8011108/14/2024
Domani Inspection Service843705/05/2023
CES Engineering1277312/17/2021
Guth Deconzo Consulting E1210203/02/2021
Richard Kreshtool Architects2867109/04/2020
Beyond Arch3600111/22/2019
Building Lifecycle
All (300)Filed (48)Permit Issued (48)Signed Off (23)Facade (FISP) (10)Violation (58)Inspection (17)Objection (66)Special Inspection (30)
10/08/2026
Permit issued — Sidewalk Shed
M01379663-I1-SH
10/07/2026
Permit issued — Plumbing
M01424685-S2-PL
10/06/2026
Permit issued — Mechanical Systems
M01424685-S1-MS
10/06/2026
Permit issued — General Construction
M01424685-I1-GC
09/03/2026
Objection resolved — Addressed
09/03/2026
Objection resolved — Addressed
09/03/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Other
09/02/2026
Objection raised — Other
09/02/2026
Objection raised — Other
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Other
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Scope
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Other
08/31/2026
Filed — Alteration
Plumbing scope associated with the interior renovation of an existing duplex apt. 24A/25A located on 22-23FL levels. No Change of use, egress or occupancy.
M01424685-S1
08/31/2026
Filed — Alteration
Plumbing scope associated with the interior renovation of an existing duplex apt. 24A/25A located on 22-23FL levels. No Change of use, egress or occupancy.
M01424685-I1
08/31/2026
Filed — Alteration
Plumbing scope associated with the interior renovation of an existing duplex apt. 24A/25A located on 22-23FL levels. No Change of use, egress or occupancy.
M01424685-S2
08/20/2026
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
08/18/2026
Permit issued — General Construction
M01347183-I1-GC
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/12/2026
Permit issued — Suspended Scaffold
M01403115-I1-SC
08/06/2026
Signed off — Alteration
Apartment alteration, minor partition and demolition work. New suspended ceilings and lighting. Renovation of kitchen and bathrooms. No change in use, egress or occupancy under this application.
M01280445-I1
07/30/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01403115-I1
07/30/2026
Signed off — Alteration
Apartment alteration, minor partition and demolition work. New suspended ceilings and lighting. Renovation of kitchen and bathrooms. No change in use, egress or occupancy under this application.
M01280445-S1
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
John Patino
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
John Patino
07/24/2026
Special inspection requirement — Interior lighting power
John Patino
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/24/2026
Special inspection requirement — Lighting in dwelling units
John Patino
07/24/2026
Special inspection requirement — Lighting controls
John Patino
07/24/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
07/22/2026
Permit issued — Sidewalk Shed
M01379663-I1-SH
07/17/2026
Filed — Alteration CO
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01355975-S1
07/17/2026
Permit issued — Protection and Mechanical Methods
M01423789-I1-PMM
07/17/2026
Permit issued — Supported Scaffold
M01355975-S1-SF
07/16/2026
Filed — Alteration
Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01423789-I1
07/15/2026
Special inspection requirement — Shutoff dampers
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
ALEKSANDR LEVIN
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
06/30/2026
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
06/30/2026
Special inspection requirement — Final
John Patino
06/30/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
06/16/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01379663-P1
05/12/2026
Objection raised — Accessibility
05/12/2026
Objection raised — Structural
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Permit issued — Sidewalk Shed
M01379663-I1-SH
04/21/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01379663-I1
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Scope
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration10/08/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing10/07/2026
DOB NOWMechanical SystemsPermit IssuedS. Donadic10/06/2026
DOB NOWGeneral ConstructionPermit IssuedS. Donadic10/06/2026
DOB NOWGeneral ConstructionPermit IssuedNew Amsterdam Restoration08/18/2026
DOB NOWSuspended ScaffoldPermit IssuedNew Amsterdam Restoration08/12/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration07/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNew Amsterdam Restoration07/17/2026
DOB NOWSupported ScaffoldPermit IssuedNew Amsterdam Restoration07/17/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration04/22/2026
DOB NOWGeneral ConstructionSigned-offNew Classic Restoration02/23/2026
DOB NOWPlumbingSigned-offWF Plumbing and Heating11/14/2025
DOB NOWGeneral ConstructionSigned-offNew Classic Restoration11/06/2025
DOB NOWGeneral ConstructionSigned-offNew Classic Restoration02/21/2025
DOB NOWMechanical SystemsSigned-offNew Classic Restoration02/21/2025
DOB NOWGeneral ConstructionSigned-offStructural Preserv System01/16/2025
DOB NOWPlumbingSigned-offWF Plumbing and Heating02/15/2024
DOB NOWGeneral ConstructionSigned-offNew Classic Restoration02/09/2024
DOB NOWPlumbingSigned-offWF Plumbing and Heating02/09/2024
DOB NOWMechanical SystemsSigned-offNew Classic Restoration02/09/2024
DOB NOWMechanical SystemsSigned-offNew Classic Restoration08/10/2023
DOB NOWGeneral ConstructionSigned-offSilverlining Interiors01/19/2023
DOB NOWMechanical SystemsSigned-offSilverlining Interiors01/19/2023
DOB NOWMechanical SystemsSigned-offRiverside Builders09/12/2022
DOB NOWGeneral ConstructionSigned-offRiverside Builders09/12/2022
DOB NOWPlumbingSigned-offHenry Myers P & H07/07/2022
DOB NOWMechanical SystemsSigned-offRiverside Builders06/21/2022
DOB NOWPlumbingSigned-offNew Millennium P & H04/19/2022
DOB NOWGeneral ConstructionSigned-offRiverside Builders04/19/2022
DOB NOWGeneral ConstructionSigned-offRiverside Builders04/07/2022
DOB NOWMechanical SystemsSigned-offSilverlining Interiors03/23/2022
DOB NOWGeneral ConstructionSigned-offSilverlining Interiors03/02/2022
DOB NOWPlumbingSigned-offDonato Plumbing02/17/2022
DOB NOWGeneral ConstructionSigned-offRiverside Builders02/15/2022
DOB NOWPlumbingSigned-offP.S.I. Mechanical01/07/2022
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating10/15/2021
DOB NOWGeneral ConstructionSigned-offV. Disalvo Contracting Co10/08/2021
DOB NOWMechanical SystemsSigned-offV. Disalvo Contracting Co10/07/2021
DOB NOWGeneral ConstructionSigned-offPaul M Maintenance07/26/2021
DOB NOWPlumbingSigned-offHenry Myers P & H07/07/2021
+ 58 more permits on file
2 projects · most recent 08/31/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026Permit IssuedS. DonadicHeating and Air Conditioning Systems
Heat / Cool
08/21/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin FXAQ18PVJU 2 tons · Vrf Indoor ×2
RXQ36TBVJUA 3 tons · Vrf Outdoor ×1
Heating
Greenheck IDHB 300 CFM · Ductwork ×1
Ventilation
Greenheck SQ-90-VG 300 CFM · Exhaust Fan ×1
2 projects · most recent 08/31/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/31/2026Permit IssuedDonato PlumbingGas, Water/Sanitary
09/26/2025Signed-offWF Plumbing and HeatingWater/Sanitary
24 projects · most recent 07/28/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
07/28/2026CompleteLenlite Electrical ContractorsGeneral Wiring
07/09/2026Permit IssuedWarren Ostroff ElectricGeneral Wiring
07/08/2026Permit IssuedWarren Ostroff Electric—
04/21/2026Permit IssuedGlendale Electl Contng—
07/08/2025CompleteLenlite Electrical ContractorsGeneral Wiring
02/21/2024CompleteLenlite Electrical ContractorsGeneral Wiring
05/04/2023Permit IssuedSalvatore Campisi & SonsGeneral Wiring
07/28/2022CompleteUpdate Systems ElectricalGeneral Wiring
03/24/2022CompleteP & Z ElectricGeneral Wiring
03/24/2022CompleteP & Z Electric—
03/03/2022CompleteApollo ElectricGeneral Wiring
09/28/2021Permit IssuedEinstein Electrical—
07/28/2021Permit IssuedVertex ElectricGeneral Wiring
07/27/2021Permit IssuedApollo Electric NYG—
02/27/2021Permit IssuedLenlite Electrical ContractorsGeneral Wiring
1 project · most recent 08/21/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/21/2025——Steel, Concrete, Masonry
2 projects · most recent 07/17/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/17/2026Permit IssuedNew Amsterdam RestorationScaffold
06/16/2026Permit IssuedNew Amsterdam RestorationSidewalk Shed
1 project · most recent 09/26/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/26/2025Signed-offNew Classic RestorationTenant Protection Plan 72 Hour
1 project · most recent 07/30/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/30/2026Permit IssuedNew Amsterdam RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/15/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/20/2026Maintenance informationALEKSANDR LEVINenergy_progress
08/20/2026HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/24/2026Lighting in dwelling unitsJohn Patinoenergy_progress
07/24/2026Lighting controlsJohn Patinoenergy_progress
07/24/2026Fire-Resistance Rated ConstructionJohn Patinoprogress
07/24/2026Post-installed AnchorsALEKSANDR LEVINspecial
07/24/2026Energy Code Compliance InspectionsJohn Patinoprogress
07/24/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/24/2026Interior lighting powerJohn Patinoenergy_progress
07/15/2026HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
07/15/2026Duct leakage testing, insulation and designALEKSANDR LEVINenergy_progress
07/15/2026Post-installed AnchorsALEKSANDR LEVINspecial
07/15/2026Energy Code Compliance InspectionsALEKSANDR LEVINprogress
07/15/2026HVAC-R and service water heating equipmentALEKSANDR LEVINenergy_progress
07/15/2026HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
07/15/2026Maintenance informationALEKSANDR LEVINenergy_progress
07/15/2026Shutoff dampersALEKSANDR LEVINenergy_progress
06/30/2026FinalJohn Patinoprogress
06/30/2026FinalALEKSANDR LEVINprogress
06/30/2026Mechanical SystemsALEKSANDR LEVINspecial
02/05/2026Energy Code Compliance Inspections—progress
02/05/2026Tenant Protection Plan Compliance—special
02/05/2026Structural Stability – Alterations of existing buildings—special
02/05/2026Masonry—special
Latest 25 of 150.
▾Documents — 977 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch38
10/07/2026M01424685-S2Request digital key ↗
10/07/2026M01424685-S1Request digital key ↗
10/07/2026M01424685-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00206072-I1Request digital key ↗
09/04/2026M00320362-I1Request digital key ↗
09/03/2026M00464061-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00206017-I1Request digital key ↗
09/04/2026M00320366-I1Request digital key ↗
08/15/2026M00320366-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/03/2026M00420696-I1Request digital key ↗
▸Applications & Permits177
▸BISWORK PERMIT APPLICATION69
10/07/2021140949035Open ↗
04/20/2021140912387Open ↗
11/16/2020140929271Open ↗
Showing 3 of 69 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION63
08/02/2023123880167Open ↗
02/23/2023140949035Open ↗
01/20/2023140949035Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWLPC Approval/Permit41
10/07/2026M01424685-S2Open ↗
10/07/2026M01424685-S1Open ↗
10/07/2026M01424685-I1Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
04/05/2023140949035Open ↗
02/28/2023140949035Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
09/23/2021140949035Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/08/2021140929271Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISLOTLINE WINDOW RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications233
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
11/30/2020123880167Open ↗
03/16/2020123797347Open ↗
02/14/2020122536997Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature62
10/08/2026M01424685-S2Open ↗
10/08/2026M01424685-I1Open ↗
10/08/2026M01424685-I1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
10/07/2026M01424685-S2Open ↗
10/07/2026M01424685-I1Open ↗
10/07/2026M01424685-S1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
10/08/2026M01424685-S2Open ↗
10/08/2026M01424685-I1Open ↗
10/08/2026M01424685-S1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/09/2021140999597Open ↗
09/08/2020140949035Open ↗
07/30/2020140929271Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/27/2021140912387Open ↗
09/08/2020140949035Open ↗
07/30/2020140929271Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/09/2021140999597Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/09/2021140999597Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection28
▸BISTenant Protection Plan and Notes18
03/16/2020123797347Open ↗
01/27/2021140912387Open ↗
09/08/2020140949035Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00206072-I1Open ↗
09/04/2026M00320366-I1Open ↗
Showing 2 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
07/30/2020140929271Open ↗
▸BISSTREET TREE SIGNOFF1
11/22/2021140929271Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/09/2020140929271Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026M01355975-I1Open ↗
▸Environmental & Asbestos66
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
09/06/2026M00002151-I1Open ↗
09/05/2026M00206072-I1Open ↗
09/05/2026M00206017-I1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
09/08/2020140949035Open ↗
07/31/2020140929271Open ↗
07/22/2020140912387Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form13
10/07/2026M01424685-S1Open ↗
10/07/2026M01424685-S2Open ↗
10/07/2026M01424685-I1Open ↗
Showing 3 of 13 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
01/27/2021140912387Open ↗
Showing 1 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
03/16/2020123797347Open ↗
02/14/2020122536997Open ↗
02/14/2020122536997Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
03/08/2022123880470Open ↗
03/08/2022123880470Open ↗
03/07/2022123880470Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
03/07/2022123880470Open ↗
08/16/2021123189450Open ↗
03/01/2021123797347Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/08/2020140949035Open ↗
07/30/2020140929271Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/02/2023140949035Open ↗
11/22/2021140929271Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
01/27/2021140912387Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: RESPONSIBILITY30
10/04/2023140949035Open ↗
10/04/2023140949035Open ↗
05/16/2023140912387Open ↗
Showing 3 of 30 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
10/11/2024123239502Open ↗
06/13/2023123880167Open ↗
05/16/2023140912387Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
03/14/2023140949035Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/02/2023140949035Open ↗
▸BISMASONRY1
10/02/2023140949035Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/02/2023140949035Open ↗
▸Approvals, Objections & Sign-offs96
▸BISLANDMARKS APPROVAL36
03/08/2022123880470Open ↗
03/09/2021140999597Open ↗
01/27/2021140912387Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
10/10/2023140949035Open ↗
08/03/2023123880167Open ↗
05/16/2023140912387Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
02/20/2020122536997Open ↗
02/14/2020122536997Open ↗
02/13/2020122536997Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS SIGNOFF6
10/05/2023140949035Open ↗
07/11/2023123880167Open ↗
09/21/2022140912387Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL3
10/02/2023140949035Open ↗
07/11/2023123880167Open ↗
05/16/2023140912387Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
08/12/2020140929271Open ↗
▸Cost, Insurance & Ownership64
▸BISCOST AFFIDAVIT58
05/15/2023140912387Open ↗
05/15/2023140912387Open ↗
02/28/2023140949035Open ↗
Showing 3 of 58 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
03/01/2021123797347Open ↗
Showing 1 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/02/2023140949035Open ↗
07/11/2023123880167Open ↗
05/16/2023140912387Open ↗
▸Filing & Intake Forms88
▸BISADDITIONAL INFORMATION34
04/05/2023140949035Open ↗
09/08/2021140912387Open ↗
03/03/2021140929271Open ↗
Showing 3 of 34 on file for this type
▸BISEFILING COVER SHEET27
03/16/2020123797347Open ↗
Showing 1 of 27 on file for this type
▸BISBOROUGH INTAKE FORM20
11/16/2020140929271Open ↗
08/21/2020123797347Open ↗
07/08/2020123880167Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/09/2021140999597Open ↗
09/08/2020140949035Open ↗
07/30/2020140929271Open ↗
Showing 3 of 7 on file for this type
▸Other Documents23
▸DOB NOWProof of Historic Building7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISUnknown5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification3
08/15/2026M01355975-I1Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/16/2026M01403115-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01403115-I1Open ↗