| Owner | Filings | Most Recent |
|---|---|---|
| FY & Sons Tic | 97 | 10/04/2026 |
| Marvel Contracting Service | 18 | 07/14/2026 |
| 989 6 Realty | 16 | 03/21/2026 |
| DDG | 16 | 03/21/2026 |
| 989 Sixth Realty | 9 | 03/21/2026 |
| 100 W 37 Street Realty | 7 | 03/21/2026 |
| 989 Sixth Avenue Associates | 6 | 03/21/2026 |
| Gio-Art Productions | 3 | 03/21/2026 |
| 989 6th Ave Associates | 2 | 03/21/2026 |
| The Milano Residences Owner | 1 | 03/22/2026 |
| Sioni Group | 1 | 03/21/2026 |
| AB & Sons | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/02/2015 | $54.3M | — | 100 WEST 37TH STREET REALTY LLC → 993 SIXTH REALTY LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| C3D Architecture | 3 | 09/24/2026 |
| MG Engineering | 12 | 07/13/2026 |
| FL&M Engineering Design & Inspection | 11 | 05/01/2026 |
| Skyline Rigging | 1 | 04/07/2026 |
| Lombardo Professional Engineering | 5 | 09/19/2025 |
| Cpengineering | 1 | 02/24/2025 |
| Doka USA | 2 | 12/19/2024 |
| JZN Engineering | 2 | 12/02/2024 |
| McNamara Salvia | 5 | 11/08/2024 |
| Valjato Engineering | 1 | 08/22/2024 |
| NYC Department of Housing Preservation and Development | 2 | 08/02/2023 |
| Salvator A. Caradonna JR | 1 | 04/22/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| BMB Building Consulting | 44 | 03/21/2026 |
| Rigid Structural Design | 11 | 03/21/2026 |
| Casa Group | 2 | 03/21/2026 |
| Lombardo Building Consultants | 8 | 03/21/2026 |
| Lombardo Professional Engineering | 2 | 03/21/2026 |
| Valjato Engineering P | 2 | 03/21/2026 |
| R Manetta | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Vertcon Builders | General Contractor | 19 | 09/30/2026 |
| Marvel Contracting Servi* | Scaffold | 11 | 07/14/2026 |
| KG Sprinkler | Fire Protection | 9 | 09/03/2026 |
| Omnibuild Construction | General Contractor | 7 | 04/09/2026 |
| DHS Fraco | Scaffold | 5 | 09/16/2026 |
| Omnibuild Construction | Scaffold | 3 | 07/08/2026 |
| Donato Plumbing Group | Plumbing | 3 | 07/08/2026 |
| Armon Mechanical | Plumbing | 2 | 08/30/2026 |
| Agir Electrical Ltd D/B/A | Electrical | 2 | 03/22/2026 |
| Dynamic Hoisting Scaff | Scaffold | 2 | 04/09/2026 |
| Precise Construction Conr | Scaffold | 2 | 03/21/2026 |
| Northeast Specialist Group | Scaffold | 2 | 07/08/2026 |
| A.M.A. Holdings | Sign hanger | 1 | 07/08/2026 |
| Doria Scaffolding | Scaffold | 1 | 04/09/2026 |
| Northeast Specialist Group | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Socotec | 301 | 2 | 09/24/2026 |
| Trolydia Testing & Inspec | 4422 | 16 | 09/24/2026 |
| Skyline Rigging | 7880 | 1 | 04/07/2026 |
| PSI Agency | 254 | 3 | 02/24/2025 |
| JZN Engineering | 363 | 5 | 12/02/2024 |
| McNamara/Salvia of New YO | 4970 | 5 | 11/08/2024 |
| Valjato Engineering | 2486 | 1 | 08/22/2024 |
| CNS Inspection Services | 7566 | 2 | 01/23/2024 |
| H & O Engineering | 5595 | 1 | 08/02/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | Vertcon Builders | 09/29/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | DHS Fraco | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG Sprinkler | 09/02/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | Armon Mechanical | 08/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Vertcon Builders | 08/25/2026 |
| DOB NOW | General Construction | Permit Issued | Vertcon Builders | 07/27/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 07/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 07/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | DHS Fraco | 06/22/2026 |
| DOB NOW | Standpipe | Permit Issued | KG Sprinkler | 06/04/2026 |
| DOB NOW | Standpipe | Permit Issued | KG Sprinkler | 06/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | DHS Fraco | 05/29/2026 |
| DOB NOW | Plumbing | Permit Issued | Donato Plumbing Group | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Vertcon Builders | 04/07/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Doria Scaffolding | 04/07/2026 |
| DOB NOW | Construction Fence | Permit Issued | DHS Fraco | 03/20/2026 |
| DOB NOW | Construction Fence | Permit Issued | DHS Fraco | 03/19/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Dynamic Hoisting Scaff | 03/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Dynamic Hoisting Scaff | 03/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 10/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 10/09/2025 |
| DOB NOW | Structural | Permit Issued | Vertcon Builders | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 09/22/2025 |
| DOB NOW | Support of Excavation | Signed-off | Vertcon Builders | 09/18/2025 |
| DOB NOW | Foundation | Signed-off | Vertcon Builders | 09/18/2025 |
| DOB NOW | General Construction | Permit Issued | Vertcon Builders | 09/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Vertcon Builders | 09/04/2025 |
| DOB NOW | Boiler Equipment | Permit Issued | Armon Mechanical | 08/08/2025 |
| DOB NOW | Standpipe | Permit Issued | H M Sprinkler | 05/30/2025 |
| DOB NOW | Standpipe | Permit Issued | H M Sprinkler | 05/29/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M Sprinkler | 05/29/2025 |
| DOB NOW | Plumbing | Permit Issued | Donato Plumbing Group | 05/20/2025 |
| DOB NOW | General Construction | Permit Issued | Vertcon Builders | 03/04/2025 |
| DOB NOW | Foundation | Signed-off | Vertcon Builders | 02/27/2025 |
| DOB NOW | Structural | Permit Issued | Vertcon Builders | 12/20/2024 |
| DOB NOW | General Construction | Permit Issued | Vertcon Builders | 11/13/2024 |
| DOB NOW | Foundation | Signed-off | Vertcon Builders | 11/13/2024 |
| DOB NOW | Support of Excavation | Signed-off | Vertcon Builders | 11/06/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 11/01/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Marvel Contracting Servi* | 11/01/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/24/2026 | Permit Issued | Vertcon Builders | Air Conditioning Systems, Generators, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Lg ARUN038GSS4 3,885 CFM · Vrf Outdoor ×15 Dectron DS-050-PT-I-G5ET2352NOC3AD0H 3,500 CFM ×3 United Cool Air B2G3ASHA 1,600 CFM · Split System ×3 Heat / Cool Lg ARUM168BTE5 189,000 BTU · Vrf Outdoor ×21 ARUM241BTE5 243,000 BTU · Vrf Outdoor ×15 ARUN24GSS4 27,000 BTU · Vrf Outdoor ×9 ARUM096BTE5 108,000 BTU · Vrf Outdoor ×6 ARUM121BTE5 135,000 BTU · Vrf Outdoor ×3 ARUM144BTE5 162,000 BTU · Vrf Outdoor ×3 ARUM196BTE5 216,000 BTU · Vrf Outdoor ×3 Ventilation Greenheck BSQ-140HP 2,200 CFM · Exhaust Fan ×12 AX-72-275-0915-A50 8,400 CFM ×6 BSQ-180HP 3,000 CFM · Exhaust Fan ×6 AX-41-160-0621 3,700 CFM · Exhaust Fan ×3 BSQ-130 1,200 CFM · Kitchen Exhaust ×3 BSQ-160 3,100 CFM · Exhaust Fan ×3 SQ-120-VG 1,000 CFM · Exhaust Fan ×3 USF-30 11,000 CFM · Exhaust Fan ×3 Renewaire CA3XIN 3,700 CFM · Erv ×12 Enervex BEF 450X 2,000 CFM · Exhaust Fan ×3 Generators Kohler 350rezxd 350 kW · Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | KG Sprinkler | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | Donato Plumbing Group | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/09/2026 | Permit Issued | Agir Electrical Ltd D/B/A | General Wiring |
| 03/26/2026 | Complete | Agir Electrical Ltd D/B/A | General Wiring |
| 03/26/2026 | Complete | Agir Electrical Ltd D/B/A | General Wiring |
| 03/26/2026 | Complete | Agir Electrical Ltd D/B/A | — |
| 02/11/2025 | Permit Issued | Jam Electrical | — |
| 09/03/2024 | Permit Issued | Nash Electric Services | — |
| 09/03/2024 | Permit Issued | Nash Electric Services | — |
| 06/04/2024 | Permit Issued | Agir Electrical Ltd D/B/A | — |
| 03/21/2024 | Permit Issued | Agir Electrical Ltd D/B/A | — |
| 03/21/2024 | Permit Issued | Agir Electrical Ltd D/B/A | — |
| 03/18/2024 | Permit Issued | Nash Electric Services | — |
| 08/18/2022 | Permit Issued | Top Shelf Electric | — |
| 03/15/2019 | Permit Issued | Jeco Electrical Service | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | Vertcon Builders | Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/01/2026 | Permit Issued | DHS Fraco | Fence, Scaffold, Sidewalk Shed |
| 03/30/2026 | Permit Issued | Dynamic Hoisting Scaff | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/07/2026 | Permit Issued | Doria Scaffolding | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/01/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 06/25/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 06/09/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 10/03/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 10/03/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 07/26/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/31/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/24/2026 | Luminous Exit Path Markings | EDWARD TOROSSIAN | special |
| 09/24/2026 | Fire-Resistant Penetrations and Joints | EDWARD TOROSSIAN | special |
| 09/24/2026 | Wall Panels, Curtain Walls, and Veneers | Jennifer Sze | special |
| 09/24/2026 | Energy Code Compliance Inspections | EDWARD TOROSSIAN | progress |
| 09/24/2026 | Fire-Resistance Rated Construction | EDWARD TOROSSIAN | progress |
| 09/24/2026 | Protection of exposed foundation insulation | Jennifer Sze | energy_progress |
| 09/24/2026 | Maintenance information | EDWARD TOROSSIAN | energy_progress |
| 09/24/2026 | Air barrier - visual inspection | Jennifer Sze | energy_progress |
| 09/24/2026 | Fenestration and door U-factor and product ratings | Jennifer Sze | energy_progress |
| 09/24/2026 | Fenestration air leakage | Jennifer Sze | energy_progress |
| 09/24/2026 | Vestibules | EDWARD TOROSSIAN | energy_progress |
| 09/24/2026 | Fenestration areas | Jennifer Sze | energy_progress |
| 09/24/2026 | Insulation placement and R values | Jennifer Sze | energy_progress |
| 09/24/2026 | Air barrier continuity plan testing | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | HVAC-R and service water heating equipment | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | HVAC-R and service water heating system controls | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | HVAC-R and service water piping design and insulation | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | Heating Systems | EDWARD TOROSSIAN | special |
| 07/10/2026 | HVAC-R and service water piping design and insulation | EDWARD TOROSSIAN | energy_progress |
| 07/10/2026 | Heating Systems | EDWARD TOROSSIAN | special |
| 07/10/2026 | HVAC-R and service water heating system controls | EDWARD TOROSSIAN | energy_progress |
| 07/10/2026 | HVAC-R and service water heating equipment | EDWARD TOROSSIAN | energy_progress |
| 04/06/2026 | Post-installed Anchors | ZELJKO STEVANOVIC | special |
| 12/18/2025 | HVAC-R and service water heating equipment | EDWARD TOROSSIAN | energy_progress |
| 12/18/2025 | HVAC-R and service water heating system controls | EDWARD TOROSSIAN | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Gio-art Productions | Arts / Culture / Entertainment | Floor 1 | Project M00157280 |