← Back
Elevator apt, fireproof with stores
FREDERICK DOUGLASS BOULEVARD
MANHATTAN · BIN 1091747
💬 Discuss this project
2024Year Built
8Stories
D6Building Class
R7-2Zoning
58,196 sfGross Floor Area
96Units
Rent Stabilized4 Open Violations ▸
Elevator apt, fireproof with stores · Owner of record: 2460 FDB LP · 7,765 sf lot · 7.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 861p · 1 filing · 20 docs
Floor 760p · 1 filing · 20 docs
Floor 660p · 1 filing · 20 docs
Floor 560p · 1 filing · 20 docs
Floor 462p · 1 filing · 20 docs
Floor 361p · 1 filing · 20 docs
Floor 261p · 1 filing · 20 docs
Floor 1Under Construction60p · 3 filings · 20 docs
Cellar63p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1204/09/2026
NY DEVELOPERS & MANAGEMEN1403/22/2026
MANAGEMEN NY DEVELOPERS &103/22/2026
TIMBER EQUITIES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2022$2.4M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF ENGINEERING, PC1309/11/2026
FISCHER MAKOOI ARCHITECTS PLLC1706/18/2026
ASHRAF CORP205/08/2025
MJE PROFESSIONAL SERVICES112/20/2024
TOHFAZ UDDIN PE PC109/09/2024
KZ ENGINEERING, P.C304/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group2503/21/2026
JM ZONING, LLC.303/21/2026
KD DESIGNS203/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DEVELOPERS & MANAGEMENTGeneral Contractor2104/09/2026
TRISTATE FIRE SPRINK INCFire Protection607/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor504/09/2026
BEST MECHANICAL SVCS INCPlumbing207/08/2026
JAM ELECTRICAL CORP 003652General Contractor203/22/2026
1 ARBOR LLCGeneral Contractor209/18/2026
ANTHONY LUCIANOElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSF ENGINEERING, PC1274109/11/2026
ATLAS ATC ENGINEERING INC80112006/18/2026
ATLANTIC ENGINEERINGLABOR1381406/09/2025
20/20 INSPECTIONS INC1471303/06/2023
FNA ENGINEERING SERVICES7846102/24/2023
Building Lifecycle
All (204)Filed (34)Permit Issued (30)Signed Off (11)Violation (20)Inspection (15)Objection (61)Special Inspection (30)Tax Incentive (3)
06/15/2031
421-a(16) construction completed
09/17/2026
Permit issued — Mechanical Systems
M01441283-I1-MS
09/11/2026
Filed — Alteration
New Mechanical system heat pump AC unit equipment with related piping and ductwork as shown on drawings.
M01441283-I1
09/10/2026
Permit issued — General Construction
M01445753-I1-GC
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/14/2026
Special inspection requirement — Shutoff dampers
Nicholas Tucci
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
08/14/2026
Special inspection requirement — Maintenance information
Nicholas Tucci
08/05/2026
Special inspection requirement — Mechanical Systems
Nicholas Tucci
08/05/2026
Special inspection requirement — Final
Nicholas Tucci
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
B
07/16/2026
Objection resolved — Addressed
06/30/2026
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S8
06/28/2026
Objection raised — Other
06/18/2026
Filed — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-B4
04/14/2026
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S6
04/14/2026
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S5
03/23/2026
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S4
03/19/2026
Signed off — Alteration
INSTALLATION OF 6000 LB SINGLE PERSONNEL/MATERIAL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01107203-I1
03/18/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01053272-I1
03/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/10/2026
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00730865-I1
02/09/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
01/27/2026
Filed — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-B2
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
01/06/2026
Special inspection requirement — Maintenance information
RONALD GRAPIN
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
01/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
12/23/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/16/2025
Filed — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-B1
12/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
RONALD GRAPIN
12/02/2025
Special inspection requirement — Shutoff dampers
RONALD GRAPIN
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
12/02/2025
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
12/02/2025
Special inspection requirement — Maintenance information
RONALD GRAPIN
12/02/2025
Special inspection requirement — Final
RONALD GRAPIN
11/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Filed — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-A9
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
10/31/2025
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
10/31/2025
Special inspection requirement — Final
RONALD GRAPIN
10/27/2025
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S7
10/27/2025
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S2
10/27/2025
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S9
10/27/2025
Signed off — New Building
Foundation & Earthwork herewith filed for 282 West 13nd St. Zoning approval granted for NB job number M00686955-I1 per Administrative Code 28-104.2.5. Also filed for the installation of a single footing element for 421a vesting as per drawings.
M00686955-S1
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit Issued1 ARBOR LLC09/17/2026
DOB NOWGeneral ConstructionPermit Issued1 ARBOR LLC09/10/2026
DOB NOWMechanical SystemsSigned-offNY DEVELOPERS & MANAGEMEN08/05/2025
DOB NOWCurb CutSigned-offNY DEVELOPERS & MANAGEMEN07/22/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC07/21/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/21/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC07/18/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC07/17/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC07/17/2025
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC06/17/2025
DOB NOWStructuralSigned-offNY DEVELOPERS & MANAGEMEN05/30/2025
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN05/29/2025
DOB NOWGeneral ConstructionPermit IssuedNY DEVELOPERS & MANAGEMEN02/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC09/10/2024
DOB NOWMechanical SystemsSigned-offNY DEVELOPERS & MANAGEMEN08/08/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC07/26/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/26/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC07/24/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC07/24/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC07/24/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC06/14/2024
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN05/28/2024
DOB NOWStructuralSigned-offNY DEVELOPERS & MANAGEMEN04/10/2024
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN03/29/2024
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN02/21/2024
DOB NOWGeneral ConstructionPermit IssuedNY DEVELOPERS & MANAGEMEN02/21/2024
DOB NOWSupport of ExcavationSigned-offNY DEVELOPERS & MANAGEMEN02/21/2024
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN11/03/2023
DOB NOWEarth WorkSigned-offNY DEVELOPERS & MANAGEMEN11/02/2022
DOB NOWEarth WorkSigned-offNY DEVELOPERS & MANAGEMEN06/01/2022
2 projects · most recent 09/11/2026
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2026Permit Issued1 ARBOR LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×1
06/18/2026Signed-offNY DEVELOPERS & MANAGEMENAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXTQ36TBVJUB 34,200 BTU · Vrf Outdoor ×24
RXSQ24TAVJU 23,000 BTU · Vrf Outdoor ×49
RXTQ36TAVJU 23,000 BTU · Vrf Outdoor ×25
RXSTQ36TAVJU 34,200 BTU · Vrf Outdoor ×2
RXTQ48TAVJU 48,000 BTU · Vrf Outdoor ×2
RXSQ36TAVJU 34,200 BTU · Vrf Outdoor ×4
Heating
Daikin RXTQ36TBVJUB 37,000 BTU · Vrf Outdoor ×29
RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×58
RXTQ48TAVJU 54,000 BTU · Vrf Outdoor ×2
RXTQ36TAVJU 37,000 BTU · Vrf Outdoor ×25
Ventilation
Greenheck AX-63-160-0434-A30-SPLENG 8,000 CFM · Exhaust Fan ×4
CSP-A510-VG 400 CFM · Exhaust Fan ×8
CSP-A390-VG 200 CFM · Exhaust Fan ×4
SP-110-VG 100 CFM · Exhaust Fan ×4
SQ-15-M2-VG 3,140 CFM · Exhaust Fan ×4
SQ-16-M2-VG 4,500 CFM · Exhaust Fan ×4
Captiveaire CAS-HVAC3-I.300-20-2OT-DOAS 3,400 CFM ×3
CASTRU3-I.300-20-20T 3,400 CFM · Exhaust Fan ×1
Heat / Cool
Daikin RXTQ36TBVJUB 144,000 BTU · Vrf Outdoor ×58
RXTQ48TBVJUB 48,000 BTU · Vrf Outdoor ×2
1 project · most recent 06/18/2026
Sprinkler System
FiledStatusContractorScope
06/18/2026Signed-offTRISTATE FIRE SPRINK INCSprinkler System
1 project · most recent 06/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/18/2026Signed-offBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
5 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026CompleteCONTACT ELECTRIC CORPGeneral Wiring
08/14/2025CompleteJAM ELECTRICAL CORP—
09/07/2024CompleteRICHARD NEU—
07/22/2024CompleteCONTACT ELECTRIC CORP1 meters, 1 new_meters
05/20/2024CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 06/18/2026
Concrete Masonry
FiledStatusContractorScope
06/18/2026Signed-offNY DEVELOPERS & MANAGEMENConcrete, Masonry
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/09/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
12/23/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/04/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/27/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/14/2026HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
08/14/2026Energy Code Compliance InspectionsNicholas Tucciprogress
08/14/2026Shutoff dampersNicholas Tuccienergy_progress
08/14/2026Maintenance informationNicholas Tuccienergy_progress
08/14/2026HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
08/14/2026HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
08/05/2026Mechanical SystemsNicholas Tuccispecial
08/05/2026FinalNicholas Tucciprogress
01/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
01/06/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
01/06/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
01/06/2026Maintenance informationRONALD GRAPINenergy_progress
01/06/2026Energy Code Compliance InspectionsRONALD GRAPINprogress
01/06/2026HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
01/06/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
12/02/2025HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
12/02/2025Maintenance informationRONALD GRAPINenergy_progress
12/02/2025HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
12/02/2025HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
12/02/2025Duct leakage testing, insulation and designRONALD GRAPINenergy_progress
12/02/2025Shutoff dampersRONALD GRAPINenergy_progress
12/02/2025Energy Code Compliance InspectionsRONALD GRAPINprogress
12/02/2025FinalRONALD GRAPINprogress
12/02/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
12/02/2025Mechanical SystemsRONALD GRAPINspecial
Latest 25 of 150.
▾Documents — 210 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
09/15/2026M01441283-I1Request digital key ↗
09/02/2026M00730865-I1Request digital key ↗
09/02/2026M00730865-P1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
11/24/2025141019626Open ↗
06/17/2025141019626Open ↗
05/02/2024141019626Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
10/24/2025141019626Open ↗
10/03/2025141019626Open ↗
07/12/2022141019626Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZoning Exhibit form (1-5)4
08/14/2026M00686955-B4Open ↗
08/13/2026M00686955-I1Open ↗
08/13/2026M00686955-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/14/2026M00686955-B4Open ↗
08/13/2026M00686955-A6Open ↗
08/13/2026M00686955-P5Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/12/2022141019626Open ↗
▸Seals & Professional Certifications105
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/15/2026M01441283-I1Open ↗
09/02/2026M00730865-P1Open ↗
09/02/2026M00730865-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/23/2026M01441283-I1Open ↗
09/23/2026M01441283-I1Open ↗
09/23/2026M01441283-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026M01441283-I1Open ↗
09/23/2026M00686955-A1Open ↗
09/01/2026M00686955-S7Open ↗
Showing 3 of 32 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/12/2022141019626Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/12/2022141019626Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWStandpipe Alarms Drawings2
08/13/2026M00686955-I1—
08/13/2026M00686955-Z2—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M00686955-Z2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026M00686955-I1Open ↗
08/13/2026M00686955-Z2Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/12/2022141019626Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00686955-Z2Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00686955-S6Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
12/01/2025141019626Open ↗
09/18/2025141019626Open ↗
09/18/2025141019626Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/12/2022141019626Open ↗
▸Other Documents40
▸DOB NOWDHCR Document12
08/13/2026M00686955-S7Open ↗
08/13/2026M00686955-S6Open ↗
08/13/2026M00686955-S8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProperty Ownership Certification10
08/27/2026M00686955-A7Open ↗
08/27/2026M00686955-P4Open ↗
08/27/2026M00686955-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/14/2026M00686955-B4Open ↗
08/13/2026M00686955-A6Open ↗
08/13/2026M00686955-Z2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/14/2026M00686955-B4Open ↗
08/13/2026M00686955-P5Open ↗
08/13/2026M00686955-A6Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
08/01/2023141019626Open ↗
07/12/2022141019626Open ↗
07/12/2022141019626Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00686955-S2Open ↗
08/13/2026M00686955-S1Open ↗
▸BISDHCR DOCUMENT1
07/12/2022141019626Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/01/2023141019626Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00686955-I1Open ↗