← Back
Two family brick
334 LEFFERTS AVENUE
BROOKLYN · BIN 3035394
💬 Discuss this project
1960Year Built
2Stories
B1Building Class
R6Zoning
2,160 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 2,135 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 13 docs
Floor 25p · 3 filings · 20 docs
Floor 19p · 4 filings · 20 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY304/09/2026
NYC HOUSING AUTHORITY203/21/2026
NYC PACT PRESERVATION PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RYBAK DEVELOPMENT403/21/2026
METROPOLIS GROUP INC803/21/2026
BARNWELL CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LET IT GROW, INCORPORATEDGeneral Contractor407/08/2026
FSC D&C LLCGeneral Contractor307/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor204/09/2026
ATLAS-ACON ELEC. SERVICEElectrical103/22/2026
LS GENERAL CORPGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803803/20/2025
Building Lifecycle
All (46)Filed (7)Permit Issued (9)Signed Off (4)Violation (1)Inspection (4)Objection (2)Special Inspection (19)
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of heating, and ventilation systems of existing building.
B00979853-I1
03/17/2026
Permit issued — General Construction
B00918192-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00928990-I1
03/10/2026
Signed off — Alteration
Structural work for repair and reframing existing wood joist at first floor as per drawings.
B00911114-I1
01/13/2026
Permit issued — General Construction
B00918192-I1-GC
09/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2025
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930727-I1
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/26/2025
Permit issued — Structural
B00911114-I1-ST
06/25/2025
Permit issued — General Construction
B01184978-I1-GC-CX
04/07/2025
Permit issued — Earth Work
B01184978-I1-GC-CX
03/20/2025
Filed — Alteration
GENERAL LANDSCAPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01184978-I1
02/28/2025
Permit issued — Plumbing
B00928990-I1-PL
02/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/21/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/20/2025
Permit issued — Mechanical Systems
B00979853-I1-MS
01/30/2025
Permit issued — General Construction
B00918192-I1-GC
01/29/2025
Filed — Alteration
Scope of work includes the repair and/or replacement of heating, and ventilation systems of existing building.
B00979853-I1
01/29/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00928990-I1
01/27/2025
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918192-I1
06/20/2024
Permit issued — General Construction
B00930727-I1-GC
05/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/17/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/17/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
05/13/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930727-P1
05/13/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
05/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
03/08/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930727-I1
12/19/2023
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
09/05/2023
Objection raised — Other
09/05/2023
Objection resolved — Addressed
09/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/30/2023
Filed — Alteration
Structural work for repair and reframing existing wood joist at first floor as per drawings.
B00911114-I1
08/02/2023
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
08/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/28/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
10/31/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC01/13/2026
DOB NOWStructuralSigned-offPYRAMID ETC COMPANIES, LL06/26/2025
DOB NOWGeneral ConstructionSigned-offLET IT GROW, INCORPORATED06/25/2025
DOB NOWEarth WorkSigned-offLET IT GROW, INCORPORATED04/07/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP02/28/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL02/20/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC01/30/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP06/20/2024
BISBLISSUEDTOWN COOLING INC04/16/1996
BISPLISSUEDTOWN COOLING, INC.04/08/1996
1 project · most recent 09/03/2025
General Wiring
FiledStatusContractorScope
09/03/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
1 project · most recent 03/20/2025
FiledStatusContractorScope
03/20/2025Signed-offLET IT GROW, INCORPORATED1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/24/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/21/2025FinalSAMI HAJJAR P.Eprogress
05/17/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/17/2024MasonrySAMI HAJJAR P.Especial
05/17/2024FinalSAMI HAJJAR P.Eprogress
05/13/2024FinalSAMI HAJJAR P.Eprogress
05/13/2024Tenant Protection Plan Compliance—special
05/13/2024MasonrySAMI HAJJAR P.Especial
12/19/2023Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/19/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/19/2023Mechanical SystemsSAMI HAJJAR P.Especial
12/19/2023FinalSAMI HAJJAR P.Eprogress
12/19/2023Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/19/2023Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
09/05/2023HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
09/05/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/02/2023Structural Wood FrameSAMI HAJJAR P.Eprogress
08/02/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/28/2023FinalSAMI HAJJAR P.Eprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00911114-I1Request digital key ↗
08/25/2026B00930727-I1Request digital key ↗
08/25/2026B00930727-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00979853-I1Open ↗
09/02/2026B00979853-I1Open ↗
09/01/2026B00930727-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026B00930727-I1Open ↗
08/25/2026B00930727-P1Open ↗
08/23/2026B00918192-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00979853-I1Open ↗
09/01/2026B00930727-P1Open ↗
08/31/2026B00918192-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026B00979853-I1Open ↗
08/13/2026B00918192-I1Open ↗
08/13/2026B00928990-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B00930727-I1Open ↗
08/25/2026B00930727-P1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01184978-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/25/2026B00930727-P1Open ↗
08/25/2026B00930727-I1Open ↗
08/23/2026B00918192-P1Open ↗
Showing 3 of 8 on file for this type