← Back
Over six families without stores
Crown Heights
1636 PARK PLACE · BIN 3036637
💬 Discuss this project
1915Year Built
4Stories
C1Building Class
R6Zoning
17,424 sfGross Floor Area
12Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 5,324 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar6p · 3 filings · 20 docs
1 job · most recent 03/04/2024
Sidewalk Shed
FiledStatusContractorScope
03/04/2024Permit IssuedARSENAL SCAFFOLD INCSidewalk Shed
Building Lifecycle
All (117)Filed (9)Permit Issued (11)Signed Off (5)Violation (60)Inspection (2)Special Inspection (30)
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918757-I1
03/23/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00979880-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978823-I1
03/17/2026
Permit issued — General Construction
B00918757-I1-GC
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, closed)
C
03/10/2026
Signed off — Alteration
Structural work for repair of corroded steel columns in cellar as needed.
B00911845-I1
03/06/2026
Violation issued (HPD, open)
C
02/13/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931068-I1
01/17/2026
Violation issued (HPD, closed)
C
12/25/2025
Violation issued (HPD, closed)
C
12/25/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, open)
C
08/06/2025
Permit issued — General Construction
B00918757-I1-GC
07/15/2025
Permit issued — Plumbing
B00978823-I1-PL
07/14/2025
Permit issued — General Construction
B00931068-I1-GC
07/09/2025
Permit issued — Structural
B00911845-I1-ST
02/18/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
02/18/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
02/13/2025
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918757-P1
02/03/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Latest 60 of 117 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY304/09/2026
ACE GROUP NY CORP.503/22/2026
NYC PACT PRESERVATION PARTNERS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.202/13/2025
DAGHER ENGINEERING PLLC209/24/2024
VOLUME SPACE CONSULTING INC.109/02/2024
SOCOTEC, INC.204/25/2024
ASHRAF CORP103/04/2024
MADSEN CONSULTING ENGINEERING, PLLC109/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1003/21/2026
RYBAK DEVELOPMENT203/21/2026
KD DESIGNS103/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor507/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor404/09/2026
ACE GROUP NY CORPGeneral Contractor303/21/2026
LIBERTY NY RESTORATION INGeneral Contractor304/09/2026
A & E PLUMBING CORPPlumbing207/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803802/13/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC08/06/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP07/15/2025
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN07/14/2025
DOB NOWStructuralSigned-offPYRAMID ETC COMPANIES, LL07/09/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/02/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL09/30/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC09/18/2024
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP09/03/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN08/15/2024
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC03/07/2024
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
02/18/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
02/18/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
02/18/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
02/18/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
02/18/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
02/18/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/18/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/18/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/18/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
02/18/2025FinalSAMI HAJJAR P.Eprogress
02/18/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
02/18/2025VestibulesSAMI HAJJAR P.Eenergy_progress
02/18/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
02/03/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
02/03/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
02/03/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
02/03/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
02/03/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
02/03/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
02/03/2025VestibulesSAMI HAJJAR P.Eenergy_progress
02/03/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
02/03/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/03/2025FinalSAMI HAJJAR P.Eprogress
02/03/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
02/03/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
Latest 25 of 36.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026B00911845-I1Request digital key ↗
08/25/2026B01012473-I1Request digital key ↗
08/25/2026B00931068-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00911845-I1Open ↗
08/25/2026B00931068-I1Open ↗
08/25/2026B00931068-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00979880-I1Open ↗
09/01/2026B00978823-I1Open ↗
09/01/2026B00931068-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00979880-I1Open ↗
09/01/2026B00978823-I1Open ↗
09/01/2026B00931068-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B00978823-I1Open ↗
08/22/2026B00918757-I1Open ↗
08/13/2026B00979880-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00911845-I1Open ↗
08/25/2026B00931068-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/22/2026B00918757-I1Open ↗
08/13/2026B00931068-I1Open ↗
08/13/2026B00978823-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B01104748-I1Open ↗