← Back
Three families
312 BLEECKER STREET
BROOKLYN · BIN 3075731
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
2,700 sfGross Floor Area
3Units
Three families · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/20/2022$1.1M—— → —$416/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAO W GUO ARCHITECT, PC309/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL DESIGN CONCEPT CORGeneral Contractor203/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAO W GUO ARCHITECT P.C.1754107/13/2023
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Signed Off (2)Inspection (3)Special Inspection (11)
03/28/2025
Signed off — Alteration
RENOVATE EXISTING APARTMENT ON FIRST FLOOR. WORK TO BE MINOR PARTITONS MODIFICATION AND INSTALL SPLIT SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00903448-I1
03/21/2025
Signed off — Alteration
MODIFICATION OF EXISTING PLUMBING ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00903455-I1
10/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Permit issued — Plumbing
B00903455-I1-PL
10/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2023
Filed — Alteration
MODIFICATION OF EXISTING PLUMBING ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00903455-P1
08/24/2023
Permit issued — Plumbing
B00903455-I1-PL
07/18/2023
Permit issued — General Construction
B00903448-I1-GC-CX
07/13/2023
Filed — Alteration
RENOVATE EXISTING APARTMENT ON FIRST FLOOR. WORK TO BE MINOR PARTITONS MODIFICATION AND INSTALL SPLIT SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00903448-I1
07/13/2023
Filed — Alteration
MODIFICATION OF EXISTING PLUMBING ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00903455-I1
07/13/2023
Special inspection requirement — Permanent certificate
Yao Guo
07/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Yao Guo
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
07/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Yao Guo
07/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Yao Guo
07/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Yao Guo
07/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Yao Guo
07/13/2023
Special inspection requirement — Lighting in dwelling units
Yao Guo
07/13/2023
Special inspection requirement — Maintenance information
Yao Guo
07/12/2023
Special inspection requirement — Mechanical Systems
Yao Guo
07/12/2023
Special inspection requirement — Final
Yao Guo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC09/10/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC08/24/2023
DOB NOWGeneral ConstructionSigned-offGLOBAL DESIGN CONCEPT COR07/18/2023
BISOTISSUEDBROOKLYN SOLARWORKS LLC01/10/2023
3 projects · most recent 11/15/2023
General Wiring
FiledStatusContractorScope
11/15/2023CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/04/2023CompleteBROOKYLN SOLARWORKS, LLC2 meters
02/16/2023CompleteBROOKYLN SOLARWORKS, LLC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/13/2023Permanent certificateYao Guoenergy_progress
07/13/2023Fenestration and door U-factor and product ratingsYao Guoenergy_progress
07/13/2023Fire-Resistant Penetrations and JointsYao Guospecial
07/13/2023Energy Code Compliance InspectionsYao Guoprogress
07/13/2023HVAC-R and service water heating system controlsYao Guoenergy_progress
07/13/2023HVAC-R and service water heating equipmentYao Guoenergy_progress
07/13/2023HVAC-R and service water piping design and insulationYao Guoenergy_progress
07/13/2023Lighting in dwelling unitsYao Guoenergy_progress
07/13/2023Maintenance informationYao Guoenergy_progress
07/12/2023Mechanical SystemsYao Guospecial
07/12/2023FinalYao Guoprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00903455-P1Request digital key ↗
08/27/2026B00903455-I1Request digital key ↗
08/27/2026B00903448-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/08/2023340875468Open ↗
▸BISWORK PERMIT APPLICATION1
01/10/2023340875468Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00903455-I1Open ↗
08/27/2026B00903455-P1Open ↗
08/27/2026B00903448-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00903448-I1Open ↗
08/28/2026B00903448-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/08/2023340875468Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00903448-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
01/10/2023340875468Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00903455-I1Open ↗
08/27/2026B00903455-P1Open ↗
08/27/2026B00903448-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2023340875468Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/18/2023340875468Open ↗
01/08/2023340875468Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/19/2023340875468Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/08/2023340875468Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/18/2023340875468Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/18/2023340875468Open ↗
01/08/2023340875468Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/19/2023340875468Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/19/2023340875468Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/18/2023340875468Open ↗
01/08/2023340875468Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/08/2023340875468Open ↗