← Back
Four families
1919 GATES AVENUE
QUEENS · BIN 4083235
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R5BZoning
3,450 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · 2,500 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAO W GUO ARCHITECT, PC312/14/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAO W GUO ARCHITECT P.C.1754312/14/2023
Building Lifecycle
All (27)Filed (3)Permit Issued (1)Signed Off (1)Violation (5)Inspection (5)Objection (4)Special Inspection (8)
04/15/2024
Violation issued (HPD, closed)
A
02/02/2024
Signed off — Alteration
REPLACE EXISTING BOILER PER ECB VOILATION # 39088005L AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
Q00892914-I1
01/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
12/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Yao Guo
12/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Yao Guo
12/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Yao Guo
12/14/2023
Filed — Alteration
REPLACE EXISTING BOILER PER ECB VOILATION # 39088005L AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
Q00892914-P2
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Yao Guo
12/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Yao Guo
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Yao Guo
12/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2023
Filed — Alteration
REPLACE EXISTING BOILER PER ECB VOILATION # 39088005L AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
Q00892914-P1
10/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/23/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/31/2023
Permit issued — Plumbing
Q00892914-I1-PL
07/05/2023
Objection resolved — Addressed
07/05/2023
Objection resolved — Addressed
06/30/2023
Objection raised — Scope
06/30/2023
Objection raised — Energy
06/20/2023
Filed — Alteration
REPLACE EXISTING BOILER PER ECB VOILATION # 39088005L AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
Q00892914-I1
06/07/2023
Violation issued (ECB, closed)
Construction
04/15/2021
Violation issued (HPD, closed)
A
11/21/2016
Violation issued (HPD, closed)
I
06/06/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC07/31/2023
1 project · most recent 09/15/2023
General Wiring
FiledStatusContractorScope
09/15/2023CompleteGOODALL ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/23/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/28/2023Fire-Resistant Penetrations and JointsYao Guospecial
12/28/2023Energy Code Compliance InspectionsYao Guoprogress
12/28/2023HVAC-R and service water piping design and insulationYao Guoenergy_progress
12/28/2023HVAC-R and service water heating equipmentYao Guoenergy_progress
12/14/2023Fire-Resistant Penetrations and JointsYao Guospecial
12/14/2023Energy Code Compliance InspectionsYao Guoprogress
12/14/2023HVAC-R and service water piping design and insulationYao Guoenergy_progress
12/14/2023HVAC-R and service water heating equipmentYao Guoenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026Q00892914-I1Request digital key ↗
08/23/2026Q00892914-P2Request digital key ↗
08/23/2026Q00892914-P1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00892914-P2Open ↗
09/02/2026Q00892914-P2Open ↗
08/28/2026Q00892914-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026Q00892914-P1Open ↗
08/23/2026Q00892914-I1Open ↗
08/13/2026Q00892914-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00892914-P2Open ↗
08/28/2026Q00892914-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00892914-P1Open ↗
08/23/2026Q00892914-I1Open ↗
08/13/2026Q00892914-P2Open ↗