| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01122350 ↗ | PORTER AVENUE BROOKLYN | Alteration | Permit Issued | 11/27/2024 | 08/03/2026 | Design BL COMPANIES Owner NATIONAL GRID Filer RPO INC. | UNDERPINNING OF 2 EXISTING PIPE RACK FOUNDATIONS TO ALLOW ADJACENT EXCAVATION AS PER PLANS FILED.WORK IS IN CONJUNCTION WITH A PROJECT TO IN… |
| B08050740 ↗ | PORTER AVENUE BROOKLYN | New Building | Permit Issued | 02/02/2023 | 07/31/2026 | Owner NATIONAL GRID Filer RPO INC. | Propose a New 2-Story Building (National Grid) |
| Q08032269 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 02/08/2023 | 07/20/2026 | Design BROWN AND CALDWELL Filer BROWN & CALDWELL | 'PS-DES LINDEN PLACE PUMP STATION UPGRADES INCLUDES THE CONSTRUCTION AND CONCRETE WORK FOR A NEW BELOW GRADE PUMP STATION. |
| S01178400 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/12/2025 | 07/02/2026 | Design PS&S Owner NATIONAL GRID Filer NYCD GROUP, INC. | STRUCTURAL WORK ASSOCIATED WITH INTERIOR/EXTERIOR ALTERATIONS TO EXIST. PRIMARY PRESSURE REGULATION BLDG FOR NATIONAL GRID. ASBESTOS ABATED … |
| B01368057 ↗ | PORTER AVENUE BROOKLYN | Alteration | Permit Issued | 03/31/2026 | 05/08/2026 | Design PS&S Owner NATIONAL GRID Filer NYCD GROUP, INC. | EXTERIOR REPAIRS TO EXIST THREE WALLED STEEL STRUCTURE FOR NATIONAL GRID. USE PER SECT. 28-105-4.3 OF NYC AC, PUBLIC UTILITY GAS WORK SHALL… |
| Q00743291 ↗ | 40 AVENUE QUEENS | New Building | Permit Issued | 09/02/2022 | 04/24/2026 | Design BROWN AND CALDWELL Filer BROWN & CALDWELL | PS-DES LITTLE NECK PUMP STATION UPGRADES INCLUDES CONSTRUCTION OF A NEW BUILDING ENVELOPE TO HOUSE NEW ELECTRICAL AND MECHANICAL EQUIPMENT A… |
| Name | Projects together | Most recent |
|---|---|---|
| BL COMPANIES | 5 | 05/08/2026 |
| BROWN AND CALDWELL | 5 | 08/15/2025 |
| ROHAN ENGINEERING, PC | 4 | 05/22/2025 |
| NATIONAL GRID | 3 | 07/07/2025 |
| PS&S | 3 | 06/26/2026 |
| JACOBS | 2 | 10/23/2025 |
| URBAN FOUNDATION/ENGINEERING | 2 | 01/19/2026 |
| URBANTECH CONSULTING ENGINEERING PC | 2 | 08/15/2025 |
| CON EDISON | 1 | 07/21/2022 |
| CORNERSTONE ENERGY SERVICES | 1 | 01/13/2021 |
| HDR ARCHITECTURE & ENGINEERING | 1 | 09/16/2025 |
| MRCE | 1 | 01/30/2023 |
| SPARC FIRE PROTECTION ENGINEERING | 1 | 10/23/2025 |
| WILLIAM F. COLLINS ARCHITECTS | 1 | 05/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| FORSYTHE PLBG & HTG CORP | 1 | 06/26/2026 |
| FRESH MEADOW MECH PLBG LL | 1 | 05/08/2026 |
| GRINNELL LLC | 1 | 10/23/2025 |
| PAR PLUMBING CO., INC | 1 | 05/08/2026 |
| UPRIGHT FIRE PROTCTN LLC | 1 | 05/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NATIONAL GRID | 14 | 06/26/2026 |
| NEW YORK CITY DEPT. OF ENVIRONMENTA | 5 | 08/15/2025 |
| NYCDEP | 4 | 01/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RPO INC. | 10 | 05/08/2026 |
| BROWN & CALDWELL | 5 | 08/15/2025 |
| NYCD GROUP, INC. | 4 | 06/26/2026 |
| CONSOLIDATED EDISON | 1 | 07/21/2022 |
| SMB CONSULTANT | 1 | 07/30/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01122350 ↗ | PORTER AVENUE BROOKLYN | Alteration | Permit Issued | 11/27/2024 | 08/03/2026 | Design BL COMPANIES Owner NATIONAL GRID Filer RPO INC. | UNDERPINNING OF 2 EXISTING PIPE RACK FOUNDATIONS TO ALLOW ADJACENT EXCAVATION AS PER PLANS FILED.WORK IS IN CONJUNCTION WITH A PROJECT TO IN… |
| B08050740 ↗ | PORTER AVENUE BROOKLYN | New Building | Permit Issued | 02/02/2023 | 07/31/2026 | Owner NATIONAL GRID Filer RPO INC. | Propose a New 2-Story Building (National Grid) |
| Q08032269 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 02/08/2023 | 07/20/2026 | Design BROWN AND CALDWELL Filer BROWN & CALDWELL | 'PS-DES LINDEN PLACE PUMP STATION UPGRADES INCLUDES THE CONSTRUCTION AND CONCRETE WORK FOR A NEW BELOW GRADE PUMP STATION. |
| S01178400 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/12/2025 | 07/02/2026 | Design PS&S Owner NATIONAL GRID Filer NYCD GROUP, INC. | STRUCTURAL WORK ASSOCIATED WITH INTERIOR/EXTERIOR ALTERATIONS TO EXIST. PRIMARY PRESSURE REGULATION BLDG FOR NATIONAL GRID. ASBESTOS ABATED … |
| B01368057 ↗ | PORTER AVENUE BROOKLYN | Alteration | Permit Issued | 03/31/2026 | 05/08/2026 | Design PS&S Owner NATIONAL GRID Filer NYCD GROUP, INC. | EXTERIOR REPAIRS TO EXIST THREE WALLED STEEL STRUCTURE FOR NATIONAL GRID. USE PER SECT. 28-105-4.3 OF NYC AC, PUBLIC UTILITY GAS WORK SHALL… |
| Q00743291 ↗ | 40 AVENUE QUEENS | New Building | Permit Issued | 09/02/2022 | 04/24/2026 | Design BROWN AND CALDWELL Filer BROWN & CALDWELL | PS-DES LITTLE NECK PUMP STATION UPGRADES INCLUDES CONSTRUCTION OF A NEW BUILDING ENVELOPE TO HOUSE NEW ELECTRICAL AND MECHANICAL EQUIPMENT A… |
| Q00758842 ↗ | 40 AVENUE QUEENS | Alteration | Permit Issued | 02/02/2023 | 04/16/2026 | Design URBAN FOUNDATION/ENGINEERING Owner NYCDEP Filer RPO INC. | SOE for new pump station by means of a soil-mix wall perimeter wall with soldier beams, a soil-mix grout plug at the base, and internal conc… |
| Q00744656 ↗ | GRAND CENTRL PARKWAY QUEENS | New Building | Permit Issued | 09/02/2022 | 02/23/2026 | Filer RPO INC. | PS-DES PARK DRIVE EAST PUMP STATION UPGRADES INCLUDES CONSTRUCTION OF A NEW BUILDING ENVELOPE TO HOUSE NEW ELECTRICAL AND MECHANICAL EQUIPME… |
| Q00758850 ↗ | GRAND CENTRL PARKWAY QUEENS | Alteration | Permit Issued | 02/08/2023 | 02/23/2026 | Design BROWN AND CALDWELL Filer BROWN & CALDWELL | 'PS-DES PARK DRIVE EAST PUMP STATION UPGRADES INCLUDES THE PHASED CONSTRUCTION OF A NEW PUMP STATION STRUCTURE INCLUDING CONCRETE WORK BELOW… |
| B01270996 ↗ | PORTER AVENUE BROOKLYN | Alteration | Permit Issued | 09/08/2025 | 01/29/2026 | Owner NATIONAL GRID Filer RPO INC. | THE SCOPE OF WORK INCLUDES INSTALLATION OF NEW STRUCTURAL FRAMING WITH FOOTINGS AND FOUNDATIONS FOR NEW NITROGEN TANKS, VAPORIZERS, PIPES, … |
| Q01228369 ↗ | GRAND CENTRL PARKWAY QUEENS | Alteration | Permit Issued | 06/24/2025 | 01/23/2026 | Design URBAN FOUNDATION/ENGINEERING Owner NYCDEP Filer RPO INC. | Filing herewith for SOE work for new pump station as per the plans submitted herewith. |
| Q00798203 ↗ | GRAND CENTRL PARKWAY QUEENS | Alteration | Permit Issued | 01/30/2023 | 01/21/2026 | Design MRCE | THE TEMPORARY SUPPORT OF EXCAVATION SYSTEM CONSITS OF STEEL SHEET PILES, CONCRETE PIERS, SOLDIER PILES AND LAGGING ALONG WITH PARTIAL DEMO, … |
| B00540634 ↗ | 451 MASPETH AVENUE BROOKLYN | New Building | Permit Issued | 08/10/2021 | 11/18/2025 | Design JACOBS Owner NATIONAL GRID Filer JM ZONING, LLC. | Filing herewith for the installation of a deluge system as per plans. |
| S01178402 ↗ | 469 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/12/2025 | 11/06/2025 | Design PS&S Owner NATIONAL GRID Filer NYCD GROUP, INC. | STRUCTURAL WORK ASSOCIATED WITH INTERIOR/EXTERIOR ALTERATIONS TO EXIST. SECONDARY PRESSURE REGULATION BLDG FOR NATIONAL GRID. NO CHANGE TO U… |
| S01189829 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/10/2025 | 11/06/2025 | Design ROHAN ENGINEERING, PC | INSTAL OF A TEMP. CONSTRUCTION FENCE TO ENCLOSE SOE FILED IN CONNECTION TO PUBLIC UTILITY GAS WORK PERFORMED BY NATIONAL GRID PER SECT. 28-1… |
| S01190201 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/10/2025 | 11/06/2025 | Design ROHAN ENGINEERING, PC Owner NATIONAL GRID Filer NYCD GROUP, INC. | SUPPORT OF EXCAVATION FILED IN CONNECTION TO PUBLIC UTILITY GAS WORK PERFORMED BY NATIONAL GRID PER SECT. 28-105-4.3 OF NYC AC, PUBLIC UTILI… |
| S01190242 ↗ | MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/10/2025 | 11/06/2025 | Design ROHAN ENGINEERING, PC | INSTAL OF A TEMP. CONSTRUCTION FENCE TO ENCLOSE SOE FILED IN CONNECTION TO PUBLIC UTILITY GAS WORK PERFORMED BY NATIONAL GRID PER SECT. 28-1… |
| B01122387 ↗ | PORTER AVENUE BROOKLYN | Alteration | Signed-off | 11/27/2024 | 11/05/2025 | Design BL COMPANIES Owner NATIONAL GRID Filer RPO INC. | EXCAVATION AND BACK FILLING OF ONE PIT WITH SHEETING & SHORING TO INSTALL NEW HEATING ELEMENTS BELOW THE EXISTING LNG TANK USING A GUIDED BO… |
| B01151026 ↗ | PORTER AVENUE BROOKLYN | Alteration | Signed-off | 01/30/2025 | 11/05/2025 | Design BL COMPANIES Owner NATIONAL GRID Filer RPO INC. | EXCAVATION AND BACK FILLING OF TWO PITS WITH SHEETING & SHORING TO INSTALL NEW HEATING ELEMENTS BELOW THE EXISTING LNG TANK USING A GUIDED B… |
| S01190216 ↗ | MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/10/2025 | 11/05/2025 | Design ROHAN ENGINEERING, PC Owner NATIONAL GRID Filer NYCD GROUP, INC. | SUPPORT OF EXCAVATION FILED IN CONNECTION TO PUBLIC UTILITY GAS WORK PERFORMED BY NATIONAL GRID PER SECT. 28-105-4.3 OF NYC AC, PUBLIC UTILI… |
| 321905747BIS | 180 BETHEL LOOP BROOKLYN | — | ISSUED | 09/12/2024 | 09/12/2024 | — | — |
| S01068347 ↗ | GOETHALS ROAD NORTH STATEN ISLAND | Alteration | Signed-off | 07/02/2024 | 09/04/2024 | Design NATIONAL GRID | SLOPED EXCAVATION FILED IN CONJUNCTION WITH THE INSTALALTION OF CONCRETE PAD FILED UNDER APPLICATION #S01060636-I1. NO CHANGE IN USE, EGRESS… |
| S01060636 ↗ | 425 WESTERN AVENUE STATEN ISLAND | Alteration | Signed-off | 07/02/2024 | 09/03/2024 | Design NATIONAL GRID Owner NATIONAL GRID Filer SMB CONSULTANT | INSTALLATION OF DEEP FOUNDATIONS INCLUDING PIERS, CONCRETE PAD AND H SECTION PILES AT NATIONAL GRID FACILITY. NO CHANGE TO USE, EGRESS OR OC… |
| B00949061 ↗ | PORTER AVENUE BROOKLYN | Alteration | Signed-off | 11/01/2023 | 08/27/2024 | Design BL COMPANIES Owner NATIONAL GRID Filer RPO INC. | Filing herewith Excavation and backfilling of two pits with sheeting & shoring to install new heating elements below the existing LNG Tank u… |
| 340760439BIS | PORTER AVENUE BROOKLYN | — | ISSUED | 07/14/2022 | 10/31/2022 | — | OT |
| 340760457BIS | PORTER AVENUE BROOKLYN | — | ISSUED | 11/23/2020 | 10/31/2022 | — | OT |
| M00769070 ↗ | 840 JOE DIMAGGIO HIGHWAY MANHATTAN | Alteration | Signed-off | 07/21/2022 | 09/26/2022 | Design CON EDISON Filer CONSOLIDATED EDISON | HVAC modifications: remove exhaust fans from the 59th street annex battery room, install new supply & exhaust fans, install new supply air d… |
| 340778224BIS | PORTER AVENUE BROOKLYN | — | ISSUED | 11/12/2020 | 11/03/2021 | — | OT |
| 340778288BIS | PORTER AVENUE BROOKLYN | — | ISSUED | 11/18/2020 | 11/03/2021 | — | OT |
| 340779973BIS | 252 LOMBARDY STREET BROOKLYN | — | ISSUED | 07/19/2021 | 10/26/2021 | — | — |
| B00418984 ↗ | 252 LOMBARDY STREET BROOKLYN | Alteration | Signed-off | 01/13/2021 | 07/15/2021 | Design CORNERSTONE ENERGY SERVICES Owner NATIONAL GRID Filer RPO INC. | Herewith filing to install a hvac unit in conjunction with the NB APPLICATION. |
| B00444364 ↗ | 252 LOMBARDY STREET BROOKLYN | Alteration | Signed-off | 03/05/2021 | 07/14/2021 | Design JACOBS | install a chain link fence in conjunction with NB application. |
| Building | Filings | Most Recent |
|---|---|---|
| PORTER AVENUE ↗ | 53 | 08/04/2026 |
| 1 DEP PLAZA ↗ | 1 | 07/22/2026 |
| 451 MASPETH AVENUE ↗ | 13 | 07/08/2026 |
| GOETHALS ROAD NORTH ↗ | 1 | 07/08/2026 |
| 469 MOSEL AVENUE ↗ | 12 | 07/08/2026 |
| GRAND CENTRL PARKWAY ↗ | 19 | 07/08/2026 |
| 840 JOE DIMAGGIO HIGHWAY ↗ | 1 | 07/08/2026 |
| 252 LOMBARDY STREET ↗ | 4 | 07/08/2026 |
| 40 AVENUE ↗ | 12 | 07/08/2026 |
| 467 MOSEL AVENUE ↗ | 24 | 07/08/2026 |
| MOSEL AVENUE ↗ | 11 | 04/09/2026 |