| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01362040 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 09/14/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | TBD |
| M01391620 ↗ | 50 BROAD STREET MANHATTAN | Alteration | Permit Issued | 05/28/2026 | 08/28/2026 | Design TSF ENGINEERING, PC Owner CUSHMAN & WAKEFIELD Filer MUNICIPAL EXPEDITING INC | Remove existing and install new interior partitions and finishes on partial 7th floor in the existing offices as per plans filed herewith on… |
| M01387259 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 04/25/2026 | 07/15/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Install new partitions and finishes on partial 21st floor to accommodate office alterations as per plans filed herewith only. |
| M01400992 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 06/02/2026 | 06/10/2026 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Install new partitions and finishes on partial 4th floor to accommodate office alterations as per plans filed herewith only. |
| M01401004 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 06/10/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Modify ductwork on partial 4th floor to accommodate office renovations as per plans filed herewith only. |
| M01361990 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 03/02/2026 | 04/07/2026 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new… |
| Name | Projects together | Most recent |
|---|---|---|
| TSF ENGINEERING, PC | 25 | 07/29/2026 |
| ERIK OHRMAN ARCHITECT | 13 | 07/29/2026 |
| ARRA ARCHITECTURE | 10 | 08/25/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| DEPENDABLE MECHANICAL COR | 9 | 07/29/2026 |
| PLBG P & H INC | 9 | 07/29/2026 |
| A + SPRINKLER CORP | 3 | 02/14/2025 |
| DEPENDABLE MECH CORP | 3 | 03/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ORIENT OVERSEAS ASSOCIATES | 24 | 06/03/2026 |
| CUSHMAN & WAKEFIELD | 1 | 07/29/2026 |
| SERVICE & MAINTENANCE CORP. | 1 | 05/11/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL EXPEDITING INC | 15 | 07/29/2026 |
| METROPOLIS GROUP INC | 10 | 12/04/2023 |
| SHALAT ARCHITECTS P.C. | 2 | 06/07/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01362040 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 09/14/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | TBD |
| M01391620 ↗ | 50 BROAD STREET MANHATTAN | Alteration | Permit Issued | 05/28/2026 | 08/28/2026 | Design TSF ENGINEERING, PC Owner CUSHMAN & WAKEFIELD Filer MUNICIPAL EXPEDITING INC | Remove existing and install new interior partitions and finishes on partial 7th floor in the existing offices as per plans filed herewith on… |
| M01387259 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 04/25/2026 | 07/15/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Install new partitions and finishes on partial 21st floor to accommodate office alterations as per plans filed herewith only. |
| M01400992 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 06/02/2026 | 06/10/2026 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Install new partitions and finishes on partial 4th floor to accommodate office alterations as per plans filed herewith only. |
| M01401004 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 06/10/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Modify ductwork on partial 4th floor to accommodate office renovations as per plans filed herewith only. |
| M01361990 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 03/02/2026 | 04/07/2026 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new… |
| M01345329 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 03/12/2026 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Remove existing partitions and install new partitions and finishes on partial 14th floor in the existing office suite as per plans filed her… |
| M01314868 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 12/01/2025 | 02/04/2026 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the exi… |
| M01277273 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 09/18/2025 | 10/09/2025 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein. No change to use, egress or occupancy |
| M01178194 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 03/11/2025 | 10/03/2025 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Remove and install new partitions and finishes on the partial 16th floor. as per plans flied herewith No change to use in egress or occupan… |
| M01200255 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 04/25/2025 | 10/03/2025 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Renovation to the existing Sprinkler system and related Plumbing fixtures on partial 20th floors as shown on plans. No change to egress or o… |
| M01200237 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 04/16/2025 | 04/23/2025 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | Remove and install new walls, doors, floor, finishes, and ceilings on the partial 20th floor. No change to use in egress or occupancy. |
| M01107195 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 09/30/2024 | 02/21/2025 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Sprinkler modifications on partial 28th floor to accommodate partition changes as per plans filed herewith only. |
| M01025118 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 06/05/2024 | 08/30/2024 | Design ERIK OHRMAN ARCHITECT Filer MUNICIPAL EXPEDITING INC | remove and replace sprinkler lines and heads, modify plumbing piping all to accommodate office alterations on partial 16th floor in the exis… |
| M01036408 ↗ | 88 PINE STREET MANHATTAN | Alteration | Signed-off | 06/13/2024 | 08/30/2024 | Design TSF ENGINEERING, PC Filer MUNICIPAL EXPEDITING INC | Install sprinkler lines and heads and plumbing fixtures and piping on 29th floor in the existing office building to accommodate tenant fit o… |
| M00861688 ↗ | 125 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/07/2023 | 01/30/2024 | Design TSF ENGINEERING, PC Filer SHALAT ARCHITECTS P.C. | Replacement of existing rooftop cooling tower and associated piping. No change to egress use or occupancy. |
| M00907464 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 08/25/2023 | 09/12/2023 | Design ARRA ARCHITECTURE Filer METROPOLIS GROUP INC | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO … |
| M00907472 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 08/25/2023 | 09/12/2023 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANCE TO USE, EGRES… |
| M00857862 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 05/31/2023 | 06/05/2023 | Design ARRA ARCHITECTURE | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO … |
| M00857953 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 05/31/2023 | 06/05/2023 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | INSTALLATION OF A/C UNITS, DUCTWORK, DIFFUSERS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00795188 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 10/03/2022 | Design ARRA ARCHITECTURE | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO … |
| M00795201 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 10/03/2022 | Design TSF ENGINEERING, PC | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00795168 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 09/07/2022 | 09/20/2022 | Design ARRA ARCHITECTURE | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00795208 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 09/08/2022 | 09/20/2022 | Design TSF ENGINEERING, PC | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00620183 ↗ | 618 9 AVENUE MANHATTAN | Alteration | Permit Issued | 05/11/2022 | 08/11/2022 | Design TSF ENGINEERING, PC Filer SHALAT ARCHITECTS P.C. | Replacement of existing roof mounted air conditioning units on existing steel dunnage. No change to use, egress or occupancy. |
| M00754572 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 08/02/2022 | 08/11/2022 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING DUCT WORK AND DIFFUSERS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00754522 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 07/27/2022 | 08/01/2022 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF DUCT WORK AND CEILING DIFFUSERS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00754561 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 07/20/2022 | 07/26/2022 | Design ARRA ARCHITECTURE | INSTALL WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00739120 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 07/20/2022 | 07/22/2022 | Design TSF ENGINEERING, PC | MODIFICATION TO EXISTING MECHANICAL SYSTEM. NEW SUPPLEMENTAL AC UNIT AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANG TO USE, EGRESS OR … |
| M00754500 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 07/21/2022 | 07/22/2022 | Design ARRA ARCHITECTURE Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF WALLS, DOORS, AND CEILINGS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00729995 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 07/15/2022 | 07/21/2022 | Design ARRA ARCHITECTURE Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLTION OF INTERIOR PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00691431 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 04/04/2022 | 04/12/2022 | Design TSF ENGINEERING, PC | REMOVAL AND INSTALLATION OF DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OCCUPANCY. |
| M00691252 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 03/29/2022 | 04/04/2022 | Design ARRA ARCHITECTURE | REMOVAL AND INSTALLTION OF INTERIOR PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00661202 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 03/03/2022 | 03/08/2022 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC. |
| M00660109 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 02/28/2022 | 03/01/2022 | Design ARRA ARCHITECTURE | INTERIOR RENOVATION OF PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00614811 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 12/30/2021 | 01/12/2022 | Design TSF ENGINEERING, PC Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC. |
| M00614761 ↗ | 88 PINE STREET MANHATTAN | Alteration | Permit Issued | 12/29/2021 | 01/08/2022 | Design ARRA ARCHITECTURE Filer METROPOLIS GROUP INC | INTERIOR RENOVATION OF PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 50 BROAD STREET ↗ | 2 | 07/08/2026 |
| 88 PINE STREET ↗ | 87 | 07/08/2026 |
| 125 EAST 23 STREET ↗ | 1 | 07/08/2026 |
| 618 9 AVENUE ↗ | 3 | 03/21/2026 |