← Back
Contractor
M&M CONSTRUCTION SPEC
General Contractor
3 projects with open permitsMANHATTAN · 4
4 buildings
11
Total Filings
4
Projects on File
4
Buildings Worked
3
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month4 projects all-time
0112Apr '24 · 1Dec '24 · 1Mar '25 · 1Jul '26 · 1Apr '24Jul '24Oct '24Jan '25Apr '25Jul '25Oct '25Jan '26Apr '26Jul '26
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit375%
Signed off125%
By project type
Alteration4
Most active buildings
All buildings →
23 5 AVENUEMANHATTAN · 1 open · latest 08/27/2026
1 projects
254 PARK AVENUE SOUTHMANHATTAN · latest 12/20/2024
1 projects
239 CENTRAL PARK WESTMANHATTAN · 1 open · latest 06/01/2026
1 projects
333 CENTRAL PARK WESTMANHATTAN · 1 open · latest 04/01/2025
1 projects
Key relationships
Everyone →
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01431711 ↗23 5 AVENUE
MANHATTAN
AlterationPermit Issued07/20/202608/27/2026Interior work related to the installation of an electric non-venting washer and dryer on the 5th floor in Apt 5G. The work includes General…
M01187782 ↗239 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/03/202506/01/2026STEEL REINFORCEMENT OF A STEEL COLUMN
M01027810 ↗333 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued04/09/202404/01/2025THE SCOPE OF WORK CONSIST OF THE INSTALLATION OF THE NEW NATURAL GAS, SANITARY, SANITARY VENT, AND WATER DISTRIBUTION PIPING FOR THE RENOVAT…
M01111396 ↗254 PARK AVENUE SOUTH
MANHATTAN
AlterationSigned-off12/09/202412/20/2024Removal of sleeping platform and ladder. Replace wood finish floor. No change to use, egress or occupancy.
Counts cover all 4 projects (4 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ANDREW KATZ ENGINEERS102/11/2026
EMTG CONSULTANTS INC104/09/2024
ETNA CONSULTING STRUCTURAL ENGINEER102/11/2026
OI ARCHITECTURE + DESIGN PLLC107/20/2026
STEVEN M. YANG ARCHITECT LLC112/09/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DP FLYNN PLBG & HTG INC307/20/2026
MARTANY TILE CORP104/09/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BROWN HARRIS STEVENS102/11/2026
KYLE ROBERTS INTERIOR DESIGN112/09/2024
THE LOVETT GROUP107/20/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ADAM MAISER104/09/2024
KATZ ARCHITECTURE & PROJECT MANAGEM102/11/2026
4 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 4Open permit 3Signed off 1
4 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01431711 ↗23 5 AVENUE
MANHATTAN
AlterationPermit Issued07/20/202608/27/2026Interior work related to the installation of an electric non-venting washer and dryer on the 5th floor in Apt 5G. The work includes General…
M01187782 ↗239 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/03/202506/01/2026STEEL REINFORCEMENT OF A STEEL COLUMN
M01027810 ↗333 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued04/09/202404/01/2025THE SCOPE OF WORK CONSIST OF THE INSTALLATION OF THE NEW NATURAL GAS, SANITARY, SANITARY VENT, AND WATER DISTRIBUTION PIPING FOR THE RENOVAT…
M01111396 ↗254 PARK AVENUE SOUTH
MANHATTAN
AlterationSigned-off12/09/202412/20/2024Removal of sleeping platform and ladder. Replace wood finish floor. No change to use, egress or occupancy.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
23 5 AVENUE ↗108/16/2026
333 CENTRAL PARK WEST ↗407/08/2026
239 CENTRAL PARK WEST ↗304/09/2026
254 PARK AVENUE SOUTH ↗303/21/2026
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
Showing 3 of 13 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/16/2026M01431711-S1 · 23 5 AVENUEOpen ↗
08/16/2026M01431711-I1 · 23 5 AVENUEOpen ↗
Showing 2 of 11 on file for this type
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature33
09/02/2026M01187782-I1 · 239 CENTRAL PARK WESTOpen ↗
09/02/2026M01187782-I1 · 239 CENTRAL PARK WESTOpen ↗
09/02/2026M01187782-I1 · 239 CENTRAL PARK WESTOpen ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026M01027810-I1 · 333 CENTRAL PARK WESTOpen ↗
08/27/2026M01027810-S1 · 333 CENTRAL PARK WESTOpen ↗
08/27/2026M01027810-S2 · 333 CENTRAL PARK WESTOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01187782-I1 · 239 CENTRAL PARK WESTOpen ↗
09/02/2026M01187782-I1 · 239 CENTRAL PARK WESTOpen ↗
09/01/2026M01027810-S2 · 333 CENTRAL PARK WESTOpen ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026M01111396-I1 · 254 PARK AVENUE SOUTHOpen ↗
08/16/2026M01431711-I1 · 23 5 AVENUEOpen ↗
08/16/2026M01431711-S1 · 23 5 AVENUEOpen ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026M01027810-I1 · 333 CENTRAL PARK WESTOpen ↗
08/27/2026M01027810-S1 · 333 CENTRAL PARK WESTOpen ↗
08/27/2026M01027810-S2 · 333 CENTRAL PARK WESTOpen ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type