| Owner | Filings | Most Recent |
|---|---|---|
| BROWN HARRIS STEVENS | 22 | 08/21/2026 |
| CERINA GENERAL CONTRACTING INC | 5 | 03/22/2026 |
| 239 CCENTRAL PARK WEST | 155 | 03/22/2026 |
| GENERAL CONTR INC CERINA | 1 | 03/22/2026 |
| INSIGNA RESIDENTIAL GR | 1 | 03/22/2026 |
| C.P.W CORP KREISEL CO | 1 | 03/22/2026 |
| CEPRINE CONSTRUCTION | 2 | 03/22/2026 |
| CERINA CONSTRUCTION | 6 | 03/21/2026 |
| NBX ACQUISITION | 3 | 03/21/2026 |
| A A F 239 CENTRAL PARK WEST | 4 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| KZ ENGINEERING, P.C | 13 | 07/30/2026 |
| CES ENGINEERING LLC | 6 | 06/18/2026 |
| ABS ENGINEERING, PLLC | 2 | 06/16/2026 |
| RODMAN PAUL ARCHITECTS PLLC | 1 | 06/07/2026 |
| SPAR UNLIMITED LLC | 5 | 02/23/2026 |
| LICHTEN ARCHITECTS | 3 | 02/17/2026 |
| ANDREW KATZ ENGINEERS | 5 | 02/11/2026 |
| ETNA CONSULTING STRUCTURAL ENGINEER | 1 | 12/03/2025 |
| HABITAT WORKSHOP ARCHITECTURE URBAN | 2 | 10/23/2025 |
| KTISMA ARCHITECTURE STUDIO PLLC | 1 | 08/19/2025 |
| AZA ENGINEERING LLC | 4 | 04/16/2025 |
| NICHOLAS A. CICHANOWSKI ARCHITECT, | 2 | 12/11/2024 |
| SP WONG ARCHITECT PLLC | 1 | 12/28/2023 |
| JOSHUA BRANDFONBRENER ARCHITECT | 1 | 08/25/2023 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 2 | 08/24/2023 |
| JACK GREEN ASSOCIATES | 9 | 02/02/2023 |
| IKMUELLER ARCHITECTURE PLLC | 1 | 01/13/2023 |
| GORDON KAHN PROFESSIONAL ARCHITECT | 2 | 08/23/2022 |
| MICHAEL ZENREICH ARCHITECT PC | 1 | 02/22/2022 |
| LANDOW AND LANDOW ARCHITECTS | 1 | 02/17/2021 |
| BAALBAKI&ASSOCIATES ENGINEERING, PC | 1 | 07/21/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 13 | 03/21/2026 |
| MICHAEL ZENREICH ARCHITECT | 6 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 3 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| BROWN HARRIS STEVENS | 2 | 03/21/2026 |
| JAMES D FERRANTE ARCHITECT | 16 | 03/21/2026 |
| CSR EXPEDITERS | 2 | 03/21/2026 |
| BOYD CONSULTING | 4 | 03/21/2026 |
| KATZ ARCHITECTURE & PROJECT MANAGEM | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CEPRINE CONSTRUCTION INC | General Contractor | 17 | 07/31/2026 |
| TOKA HOME, LLC | General Contractor | 9 | 03/21/2026 |
| ZEN RESTORATION INC | General Contractor | 7 | 07/08/2026 |
| CERINA GENERAL CONTR INC | General Contractor | 5 | 08/21/2026 |
| E. TUNNEY INTERIOR CONTRA | General Contractor | 5 | 09/23/2026 |
| TONY DE FALCO | Electrical | 4 | 03/21/2026 |
| MOREAIR MECHANICAL SERVIC | General Contractor | 3 | 07/08/2026 |
| PANDA HVAC INC | General Contractor | 3 | 03/21/2026 |
| UBS BUILDERS, LLC | General Contractor | 3 | 09/17/2026 |
| M&M CONSTRUCTION SPEC | General Contractor | 3 | 04/09/2026 |
| DONATO PLUMBING, INC | Plumbing | 2 | 07/08/2026 |
| MACREDDIN PLBG & HTG INC | Plumbing | 2 | 09/15/2026 |
| ALPHACRAFT CONSTRUCTION* | General Contractor | 2 | 07/08/2026 |
| AMC PLBG, HTG & CLNG, INC | Plumbing | 2 | 07/08/2026 |
| A.L.L. CONSTRUCTION AND D | General Contractor | 2 | 07/08/2026 |
| INTERBORO PROPERTY MGMT | General Contractor | 2 | 07/08/2026 |
| SMART PLBG & HTG CORP | Plumbing | 2 | 07/08/2026 |
| DP FLYNN PLBG & HTG INC | Plumbing | 2 | 06/28/2026 |
| METROTECH MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| M&G PLUMBING AND HEATING | Plumbing | 1 | 07/08/2026 |
| PROCORE MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| ALBERT STIEFEL | Electrical | 1 | 03/21/2026 |
| VELOCITY PLUMBING & HEAT | Plumbing | 1 | 07/08/2026 |
| BISHUNDAT, CHRISTOPHER | Electrical | 1 | 03/21/2026 |
| CREGGAN ELECTRIAL CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| INTEGRITY CONSULTING SERV | 666 | 3 | 06/18/2026 |
| ABS ENGINEERING, PLLC | 4835 | 1 | 06/16/2026 |
| RODMAN PAUL ARCHITECTS PL | 7162 | 1 | 06/07/2026 |
| AK ENGINEERING PC | 678 | 1 | 06/07/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 2 | 02/17/2026 |
| KATZ ARCHITECTURE | 1371 | 4 | 02/11/2026 |
| SPAR UNLIMITED LLC | 5967 | 3 | 02/05/2026 |
| ETNA CONSULTING STRUCTURA | 8263 | 1 | 12/03/2025 |
| PROJECT TACTICAL SOLUTION | 5859 | 2 | 08/19/2025 |
| AZA ENGINEERING LLC | 7235 | 5 | 04/16/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | E. TUNNEY INTERIOR CONTRA | 09/22/2026 |
| DOB NOW | General Construction | Permit Issued | UBS BUILDERS, LLC | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | MACREDDIN PLBG & HTG INC | 09/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | E. TUNNEY INTERIOR CONTRA | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | CERINA GENERAL CONTR INC | 08/20/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 07/30/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CERINA GENERAL CONTR. INC | 07/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ALPHACRAFT CONSTRUCTION* | 07/01/2026 |
| DOB NOW | Plumbing | Permit Issued | VELOCITY PLUMBING & HEAT | 06/15/2026 |
| DOB NOW | General Construction | Permit Issued | ALPHACRAFT CONSTRUCTION* | 06/11/2026 |
| DOB NOW | Plumbing | Signed-off | DP FLYNN PLBG & HTG INC | 06/01/2026 |
| DOB NOW | Plumbing | Permit Issued | ASPECT PLBNG&HTNG CO LLC | 04/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UBS BUILDERS, LLC | 04/17/2026 |
| DOB NOW | General Construction | Permit Issued | UBS BUILDERS, LLC | 04/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CERINA GENERAL CONTR. INC | 03/10/2026 |
| DOB NOW | Structural | Signed-off | M&M CONSTRUCTION SPEC | 02/23/2026 |
| DOB NOW | Plumbing | Permit Issued | MARATHON MECHANICAL LLC | 12/17/2025 |
| DOB NOW | General Construction | Permit Issued | TATRAS CONSTRUCTION CORP | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | DP FLYNN PLBG & HTG INC | 04/24/2025 |
| DOB NOW | General Construction | Permit Issued | M&M CONSTRUCTION SPEC | 04/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | M&M CONSTRUCTION SPEC | 04/22/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TOKA HOME, LLC | 03/14/2025 |
| DOB NOW | General Construction | Signed-off | TOKA HOME, LLC | 03/01/2025 |
| DOB NOW | Plumbing | Signed-off | M&G PLUMBING AND HEATING | 02/03/2025 |
| DOB NOW | General Construction | Signed-off | TOKA HOME, LLC | 01/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ARCHWEY ARCHITECT | 12/20/2024 |
| DOB NOW | General Construction | Signed-off | ARCHWEY ARCHITECT | 12/20/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | CERINA GENERAL CONTR. INC | 05/30/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | CEPRINE CONSTRUCTION INC | 04/22/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | CERINA GENERAL CONTR. INC | 04/19/2024 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 02/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ARCHWEY ARCHITECT | 02/26/2024 |
| DOB NOW | General Construction | Signed-off | ARCHWEY ARCHITECT | 02/23/2024 |
| DOB NOW | Plumbing | Signed-off | AMC PLBG, HTG & CLNG, INC | 11/30/2023 |
| DOB NOW | Plumbing | Signed-off | AMC PLBG, HTG & CLNG, INC | 09/21/2023 |
| DOB NOW | Mechanical Systems | Signed-off | INTERBORO PROPERTY MGMT | 09/21/2023 |
| DOB NOW | General Construction | Signed-off | INTERBORO PROPERTY MGMT | 09/20/2023 |
| DOB NOW | General Construction | Signed-off | E TUNNEY INTERIOR CONTRA | 05/01/2023 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 04/27/2023 |
| DOB NOW | Supported Scaffold | Signed-off | CEPRINE CONSTRUCTION INC | 02/14/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/16/2026 | Permit Issued | E. TUNNEY INTERIOR CONTRA | Air Conditioning Systems | Cooling Carrier FE5BNXB24L00 600 CFM · Ahu ×1 FJ5ANXA18L00 600 CFM · Ahu ×1 TYC021TW-19K-3419 19,500 BTU · Condensing Unit ×1 TYC021TW-25K-3916S 25,400 BTU · Condensing Unit ×1 |
| 02/17/2026 | Permit Issued | ALPHACRAFT CONSTRUCTION* | Air Conditioning Systems | Cooling Task TYC0211TWEC 24,000 tons · Rooftop Unit ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | Permit Issued | ASPECT PLBNG&HTNG CO LLC | Gas, Water/Sanitary |
| 06/16/2026 | Permit Issued | MACREDDIN PLBG & HTG INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | CAVAN ELECTRIC CORP. | General Wiring |
| 06/12/2026 | Permit Issued | BANNER ELECTRIC INC | General Wiring |
| 05/20/2026 | Complete | CAVAN ELECTRIC CORP. | — |
| 04/28/2026 | Permit Issued | APOLLO ELECTRIC INC. | General Wiring |
| 04/16/2026 | Permit Issued | EIS ELECTRIC CORP DBA | General Wiring |
| 02/11/2026 | Complete | JOSEPH WEINSTEIN ELECTRIC | — |
| 01/20/2026 | Complete | BP ELECTRIC & COOLING INC | General Wiring |
| 12/16/2025 | Permit Issued | POWER FULL ELECTRIC, INC | General Wiring |
| 08/05/2025 | Complete | DEFALCO ASSOCIATES, LLC./ | General Wiring |
| 06/16/2025 | Complete | ANGLER ELECTRIC | General Wiring |
| 04/28/2025 | Complete | CREGGAN ELECTRIAL CORP | General Wiring |
| 11/12/2024 | Complete | RIGID ELECTRIC, INC. | General Wiring |
| 09/22/2024 | Complete | TECHNO SYS ELECL CONTG IN | General Wiring |
| 09/19/2024 | Complete | SUPER CHARGED ELEC. INC. | — |
| 04/22/2024 | Permit Issued | HIGH QUALITY ELECTRIC OF | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/11/2026 | Signed-off | DP FLYNN PLBG & HTG INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | CERINA GENERAL CONTR. INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/04/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 05/19/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/25/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/12/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/04/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/26/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/26/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/15/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/14/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/25/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/20/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/15/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/08/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/29/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/01/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/24/2022 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/18/2026 | Post-installed Anchors | Alex Schwartz | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | Alex Schwartz | special |
| 07/21/2026 | Structural Stability – Alterations of existing buildings | Ari Kamo | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | ALEKSANDR LEVIN | special |
| 06/23/2026 | Tenant Protection Plan Compliance | — | special |
| 05/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/29/2026 | Maintenance information | — | energy_progress |
| 05/29/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/29/2026 | Electrical motors and elevators | — | energy_progress |
| 05/29/2026 | Shutoff dampers | — | energy_progress |
| 05/29/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/29/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 05/28/2026 | Energy Code Compliance Inspections | — | progress |
| 05/28/2026 | Post-installed Anchors | — | special |
| 05/28/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/28/2026 | Fire-Resistant Penetrations and Joints | ALEKSANDR LEVIN | special |
| 05/28/2026 | Tenant Protection Plan Compliance | — | special |
| 05/20/2026 | Post-installed Anchors | Michael Fasulo | special |
| 05/20/2026 | Masonry | Michael Fasulo | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | Michael Fasulo | special |
| 05/20/2026 | Fire-Resistance Rated Construction | Michael Fasulo | progress |
| 05/08/2026 | Final | Michael Fasulo | progress |
| 05/08/2026 | Mechanical Systems | — | special |
| 05/08/2026 | Final | — | progress |
| 02/19/2026 | Fire-Resistant Penetrations and Joints | David Katz | special |