| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01321641 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration CO | Permit Issued | 01/12/2026 | 09/14/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | APPLICATION FOR CHANGE OF USE AND OCCUPANCY TO RETAIL ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. WORK INCLUDES THE INSTALLATION OF GUARD… |
| B01449750 ↗ | 161 COURT STREET BROOKLYN | Alteration | Permit Issued | 08/24/2026 | 09/10/2026 | Owner prospect management Contractor ALCHEMY DEVELOPMENT | Interior renovation of existing tenant suite |
| M01433698 ↗ | 100 CHURCH STREET MANHATTAN | Alteration | Permit Issued | 08/08/2026 | 09/03/2026 | Owner SL GREEN REALTY CORP Contractor R.W. DAKE & CO.,INC Filer RIZZO GROUP | Interior renovation with minor demolition and installation of new partitions, doors, suspended ceilings and finishes on the 1st Floor retail… |
| B01291502 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 08/20/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01317288 ↗ | 456 AVENUE P BROOKLYN | Alteration | Permit Issued | 11/18/2025 | 05/12/2026 | Contractor TRUEBLUE CONSTRUCTION LLC Filer JAM CONSULTANTS, INC. | RETAIL STORE # 1 - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01359931 ↗ | AVE K BROOKLYN | Alteration | Permit Issued | 03/02/2026 | 05/05/2026 | Contractor CMC1 CORP Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, AND FIXTURES. NO CHANGEIN USE, EGRESS, OR OCCUPANCY. |
| Person | Filings | Most recent |
|---|---|---|
| Lino Picinic | 18 | 07/20/2026 |
| Joel Torielli | 9 | 11/19/2025 |
| WILLIAM COMMER | 1 | 04/26/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| Domus Company LLC | 3 | 08/27/2026 |
| CORE STATES GROUP | 2 | 07/03/2025 |
| CUSTOM DESIGNING & ENGINEERING | 1 | 03/05/2026 |
| M-ENGINEERING NEW YORK, LLC | 1 | 08/27/2026 |
| MSGFIRE INC. | 1 | 03/05/2024 |
| TWIG CONSULTING ENGINEERS PC | 1 | 03/03/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| COW BAY SPRINKLER CORP | 4 | 03/03/2026 |
| STRUCTURECRAFT CONTRACTIN | 4 | 12/22/2023 |
| HORIZON RETAIL CONSTRUCTI | 3 | 06/30/2023 |
| A. BONADUCE, INC | 2 | 08/02/2024 |
| ELDER-JONES INC | 2 | 03/05/2024 |
| M. FRIED STORE FIXTURES, | 2 | 04/18/2024 |
| POLANCO BROTHERS CORP | 2 | 07/08/2024 |
| REIDY CONTRACTING GROUP | 2 | 06/05/2024 |
| 20/20 GENERAL CONTRACTING | 1 | 08/02/2023 |
| AARON PLBG & MECH SYS, IN | 1 | 03/05/2024 |
| AARON PLBG AND MECH SYST | 1 | 03/05/2024 |
| ALCHEMY DEVELOPMENT | 1 | 08/27/2026 |
| BLUEBERRY BUILDERS LLC | 1 | 02/03/2023 |
| CMC1 CORP | 1 | 03/05/2026 |
| CS HUDSON INC | 1 | 10/13/2022 |
| HAMA INTERIOR WORKS INC | 1 | 08/25/2023 |
| JKT CONSTRUCTION INC | 1 | 07/03/2025 |
| M. CARY INC | 1 | 08/08/2018 |
| MHM CONSTRUCTION NYC INC | 1 | 11/18/2022 |
| NEW TECH MECHAN SYSTEMS I | 1 | 03/05/2024 |
| PRECISION CONSTRUCTION & | 1 | 04/09/2025 |
| R.W. DAKE & CO.,INC | 1 | 08/08/2026 |
| RICHMOND P & H CO, INC | 1 | 03/03/2026 |
| RICHMOND PLBG & HEATING | 1 | 03/03/2026 |
| RIDGE CONSTRUCTION CORP | 1 | 12/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ELINORE STERN TRUST | 4 | 03/03/2026 |
| SL GREEN REALTY CORP | 2 | 08/08/2026 |
| 315 HUDSON LLC | 1 | 12/17/2025 |
| AAC REALTY | 1 | 11/30/2023 |
| ASPEN TRUSS, INC. | 1 | 04/09/2025 |
| DENTREE ASSOCIATES | 1 | 11/27/2023 |
| ESRT | 1 | 07/03/2025 |
| GENERAL LEASING & MANAGEMENT CORP. | 1 | 04/18/2024 |
| GGP STATEN ISLAND MALL LLC | 1 | 03/05/2024 |
| Integrity capital holding llc | 1 | 11/18/2025 |
| KALIMIAN EQUITIES LLC | 1 | 06/13/2024 |
| LAM GROUP | 1 | 08/25/2023 |
| M. SOPHER & CO., LLC | 1 | 12/22/2023 |
| MACY'S INC. | 1 | 06/30/2023 |
| PLATINUM REALTY ASSOCIATES | 1 | 03/05/2026 |
| R. A. COHEN | 1 | 02/03/2023 |
| RENAISSANCE REALTY | 1 | 01/25/2023 |
| THE SHOPS AT COLUMBUS CIRCLE | 1 | 08/02/2023 |
| WHARTON PROPERTIES LLC | 1 | 02/07/2023 |
| prospect management | 1 | 08/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 10 | 03/05/2026 |
| EA DESIGN GROUP, INC. | 4 | 03/03/2026 |
| BURNHAM NATIONWIDE INC | 3 | 08/02/2023 |
| RIZZO GROUP | 3 | 08/08/2026 |
| ADVANCED BUILDERS SERVICES | 1 | 06/13/2024 |
| ANDREW KATZ ENGINEERS | 1 | 03/05/2024 |
| BROOKBRIDGE CONSULTING | 1 | 04/30/2021 |
| KAREN PODLUCKY | 1 | 03/05/2024 |
| OCULUS CONSULTING GROUP | 1 | 08/25/2023 |
| PEROTTO CONSULTING MGT | 1 | 02/07/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01321641 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration CO | Permit Issued | 01/12/2026 | 09/14/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | APPLICATION FOR CHANGE OF USE AND OCCUPANCY TO RETAIL ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. WORK INCLUDES THE INSTALLATION OF GUARD… |
| B01449750 ↗ | 161 COURT STREET BROOKLYN | Alteration | Permit Issued | 08/24/2026 | 09/10/2026 | Owner prospect management Contractor ALCHEMY DEVELOPMENT | Interior renovation of existing tenant suite |
| M01433698 ↗ | 100 CHURCH STREET MANHATTAN | Alteration | Permit Issued | 08/08/2026 | 09/03/2026 | Owner SL GREEN REALTY CORP Contractor R.W. DAKE & CO.,INC Filer RIZZO GROUP | Interior renovation with minor demolition and installation of new partitions, doors, suspended ceilings and finishes on the 1st Floor retail… |
| B01291502 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 08/20/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01317288 ↗ | 456 AVENUE P BROOKLYN | Alteration | Permit Issued | 11/18/2025 | 05/12/2026 | Contractor TRUEBLUE CONSTRUCTION LLC Filer JAM CONSULTANTS, INC. | RETAIL STORE # 1 - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01359931 ↗ | AVE K BROOKLYN | Alteration | Permit Issued | 03/02/2026 | 05/05/2026 | Contractor CMC1 CORP Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, AND FIXTURES. NO CHANGEIN USE, EGRESS, OR OCCUPANCY. |
| B01291504 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 02/09/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR EXTERIOR STRUCTURAL MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP… |
| B01284331 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 09/22/2025 | 01/29/2026 | Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE ON THE 1ST & 2ND FLOOR EXTERIOR AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M01205385 ↗ | 15 CANAL STREET MANHATTAN | Alteration | Signed-off | 04/09/2025 | 11/12/2025 | Owner ASPEN TRUSS, INC. Contractor PRECISION CONSTRUCTION & Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILING, FLOORING, AND FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01266222 ↗ | 78 VANDAM STREET MANHATTAN | Alteration | Signed-off | 09/09/2025 | 09/12/2025 | Owner 315 HUDSON LLC Contractor RIDGE CONSTRUCTION CORP Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01236779 ↗ | 1538 3 AVENUE MANHATTAN | Alteration | Permit Issued | 07/02/2025 | 08/01/2025 | Owner ESRT Contractor JKT CONSTRUCTION INC Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILING. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M01142047 ↗ | 510 WEST 22ND STREET MANHATTAN | No Work | Filed — no permit on record | 11/18/2024 | — | — | — |
| M01013729 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/05/2024 | 09/10/2024 | Contractor REIDY CONTRACTING GROUP Filer RIZZO GROUP | General Construction taking place on the first floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M01066386 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/02/2024 | 08/13/2024 | Contractor A. BONADUCE, INC | Installation of interior non-bearing partitions and new finishes as per plans filed. No change to use, egress or occupancy. |
| M01072524 ↗ | 487 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/23/2024 | Contractor POLANCO BROTHERS CORP | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, CEILINGS AND STOREFRONT. NO CHANGE IN USE, SGRESS OR OCCUPANCY. |
| M01072546 ↗ | 487 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/09/2024 | Contractor POLANCO BROTHERS CORP | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. |
| M01059188 ↗ | 487 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/13/2024 | — | Owner KALIMIAN EQUITIES LLC | — |
| M01041634 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2024 | 05/30/2024 | Contractor A. BONADUCE, INC | THE SCOPE OF WORK FOR THIS PROJECT IS A INTERIOR NON-STRUCTURAL DEMOLITION ONLY.THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS. NO MECHANICAL… |
| M01013724 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 04/24/2024 | Contractor REIDY CONTRACTING GROUP Filer RIZZO GROUP | General Construction taking place on the first floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| B01005011 ↗ | 319 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 04/18/2024 | 04/22/2024 | Contractor M. FRIED STORE FIXTURES, Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01009889 ↗ | 2 EAST 30 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/08/2024 | — | — | — |
| S00930491 ↗ | 2655 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 10/24/2023 | 03/08/2024 | Contractor NEW TECH MECHAN SYSTEMS I Filer ANDREW KATZ ENGINEERS | SPACE #2120 - PLUMBING MODIFICATIONS FOR NEW TENANT - LOVESAC. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00965246 ↗ | 4151 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 12/22/2023 | 01/08/2024 | Owner M. SOPHER AND CO. Contractor STRUCTURECRAFT CONTRACTIN Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00966005 ↗ | 3861 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 11/30/2023 | 12/27/2023 | Owner AAC REALTY Contractor STRUCTURECRAFT CONTRACTIN Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00963566 ↗ | 5216 5 AVENUE BROOKLYN | Alteration | Signed-off | 11/27/2023 | 11/30/2023 | Owner DENTREE ASSOCIATES Contractor M. FRIED STORE FIXTURES, Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, CEILING AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00965574 ↗ | 510 WEST 22ND STREET MANHATTAN | No Work | Filed — no permit on record | 11/29/2023 | — | — | — |
| M00881948 ↗ | 1 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 08/02/2023 | 08/11/2023 | Contractor 20/20 GENERAL CONTRACTING Filer BURNHAM NATIONWIDE INC | Filing herewith general construction to include interior renovation and minor interior demolition to an existing commercial space located on… |
| M00912954 ↗ | 510 WEST 22ND STREET MANHATTAN | No Work | Filed — no permit on record | 08/10/2023 | — | — | — |
| M00847908 ↗ | 441 7 AVENUE MANHATTAN | Alteration | Signed-off | 06/30/2023 | 07/10/2023 | Owner MACY'S INC. Contractor HORIZON RETAIL CONSTRUCTI Filer BURNHAM NATIONWIDE INC | general construction to include interior renovation and minor demo of an existing commercial space located on 1st floor , store 3899 |
| M00459949 ↗ | 1227 BROADWAY MANHATTAN | Alteration | Signed-off | 03/16/2023 | 05/22/2023 | Owner LAM GROUP Contractor HAMA INTERIOR WORKS INC Filer OCULUS CONSULTING GROUP | Tenant fit out space: interior alteration to Retail space (Blue Bottle Coffee). New Partitions. New Toilet Room. New suspended ceiling syste… |
| X08017851 ↗ | 3650 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 10/13/2022 | 03/31/2023 | Contractor CS HUDSON LLC | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00823673 ↗ | 4040 BROADWAY MANHATTAN | Alteration | Signed-off | 02/24/2023 | 02/28/2023 | Contractor STRUCTURECRAFT CONTRACTIN | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M08051087 ↗ | 75 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 02/03/2023 | 02/15/2023 | Owner R. A. COHEN Contractor BLUEBERRY BUILDERS LLC Filer BURNHAM NATIONWIDE INC | General construction to include interior renovation and minor demo to an existing commercial space |
| B00815252 ↗ | 1631 PITKIN AVENUE BROOKLYN | Alteration | Signed-off | 01/25/2023 | 01/31/2023 | Owner RENAISSANCE REALTY Contractor STRUCTURECRAFT CONTRACTIN Filer JAM CONSULTANTS, INC. | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B08035786 ↗ | 460 FULTON STREET BROOKLYN | Alteration | Signed-off | 11/30/2022 | 12/15/2022 | Owner WHARTON PROPERTIES LLC Contractor SHAPEL GENERAL CONTRACTIN Filer PEROTTO CONSULTING MGT | 8715 - Interior renovation of existing retail store (Use Group 6 Space). No change in egress use group or occupancy.Professional Certificati… |
| M08037437 ↗ | 1333 BROADWAY MANHATTAN | Alteration | Signed-off | 11/18/2022 | 11/23/2022 | Contractor MHM CONSTRUCTION NYC INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00726239 ↗ | 100 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 09/22/2022 | 10/11/2022 | Contractor ELDER-JONES INC | REMOVAL AND INSTA;LLATION OF INTERIOR PARTITIONS, FLOORING AND FIXTURES. NO CHANGE TO USE,EGRESS OR OCCUPANCY. |
| Q00784971 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/15/2022 | 09/28/2022 | Contractor HORIZON RETAIL CONSTRUCTI | filing herewith general construction to include interior renovation of an existing commercial space |
| B00739145 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Signed-off | 06/14/2022 | 07/26/2022 | Contractor HORIZON RETAIL CONSTRUCTI | filing herewith interior renovation and interior demolition of an existing vendor shop in an existing commercial space locate on the 2nd lev… |
| M00510705 ↗ | 601 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 04/30/2021 | 12/03/2021 | Owner SL GREEN REALTY Contractor TYJA CONTRACTORS INC Filer BROOKBRIDGE CONSULTING | Installation of plywood construction fence on both 11th Avenue and 50th Street sides of the building (Kenneth Cole) as per plans. No change … |
| M00238449 ↗ | 259 5 AVENUE MANHATTAN | No Work | Filed — no permit on record | 10/21/2019 | — | — | — |
| M00148252 ↗ | 560 LEXINGTON AVENUE MANHATTAN | No Work | Filed — no permit on record | 04/01/2019 | — | — | — |
| M00138837 ↗ | 259 5 AVENUE MANHATTAN | No Work | Filed — no permit on record | 03/29/2019 | — | — | — |
| M00051042 ↗ | 366 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/14/2018 | 12/12/2018 | Contractor M CARY | TEMPORARY CONSTRUCTION FENCE AS NOTED ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. (DIR. 14/75) |
| Building | Filings | Most Recent |
|---|---|---|
| 100 CHURCH STREET ↗ | 1 | 07/20/2026 |
| 78 VANDAM STREET ↗ | 3 | 12/16/2025 |
| 314 LIVINGSTON STREET ↗ | 5 | 11/19/2025 |
| 456 AVENUE P ↗ | 1 | 11/11/2025 |
| 1538 3 AVENUE ↗ | 3 | 06/05/2025 |
| 15 CANAL STREET ↗ | 1 | 04/03/2025 |
| 487 5 AVENUE ↗ | 3 | 05/30/2024 |
| 338 5 AVENUE ↗ | 2 | 03/01/2024 |
| 319 RALPH AVENUE ↗ | 1 | 02/13/2024 |
| 2655 RICHMOND AVENUE ↗ | 2 | 01/22/2024 |
| 3861 NOSTRAND AVENUE ↗ | 1 | 11/21/2023 |
| 4151 WHITE PLAINS ROAD ↗ | 1 | 11/20/2023 |
| 5216 5 AVENUE ↗ | 1 | 11/15/2023 |
| 1227 BROADWAY ↗ | 2 | 08/18/2023 |
| 1 COLUMBUS CIRCLE ↗ | 1 | 05/30/2023 |
| 441 7 AVENUE ↗ | 1 | 03/22/2023 |
| 1631 PITKIN AVENUE ↗ | 1 | 01/19/2023 |
| 75 WEST 71 STREET ↗ | 1 | 12/07/2022 |
| 460 FULTON STREET ↗ | 2 | 11/07/2022 |
| 601 WEST 50 STREET ↗ | 1 | 04/26/2021 |
| 510 WEST 22ND STREET ↗ | 3 | — |
| 366 MADISON AVENUE ↗ | 2 | — |
| 259 5 AVENUE ↗ | 2 | — |
| 4040 BROADWAY ↗ | 2 | — |
| 761 5 AVENUE ↗ | 2 | — |
| 5120 AVENUE U ↗ | 1 | — |
| AVE K ↗ | 1 | — |
| 161 COURT STREET ↗ | 1 | — |
| 560 LEXINGTON AVENUE ↗ | 1 | — |
| 100 WEST 71 STREET ↗ | 1 | — |
| 2 EAST 30 STREET ↗ | 1 | — |
| 1333 BROADWAY ↗ | 1 | — |
| 90-15 QUEENS BOULEVARD ↗ | 1 | — |
| 3650 WHITE PLAINS ROAD ↗ | 1 | — |