PETER V STOREY
Design
11 projects with open permitsMANHATTAN · 29BROOKLYN · 6QUEENS · 3
20 buildings
55
Total Filings
38
Projects on File
20
Buildings Worked
11
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month38 projects all-time
0235Sep '20 · 1Feb '21 · 2May '21 · 2Jun '21 · 3Oct '21 · 1Dec '21 · 1Feb '22 · 1Mar '22 · 2Apr '22 · 4Jun '22 · 3Aug '22 · 2Feb '23 · 2Oct '23 · 2Nov '23 · 2Dec '23 · 1Oct '24 · 1Jan '25 · 1May '25 · 1Aug '25 · 1Sep '25 · 1Jan '26 · 2Jun '26 · 1Jul '26 · 1202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit1129%
Signed off2463%
Filed only38%
By project type
Alteration37
Alteration CO1
Most active buildings
All buildings →
92 HORATIO STREETMANHATTAN · 3 open · latest 08/31/2026
10 projects
170 WEST 76 STREETMANHATTAN · latest 04/11/2022
3 projects
232 EAST 6 STREETMANHATTAN · latest 03/31/2022
2 projects
50 LEXINGTON AVENUEMANHATTAN · 2 open · latest 03/13/2023
2 projects
130 WEST 86 STREETMANHATTAN · latest 10/04/2022
2 projects
71 LUDLOW STREETMANHATTAN · latest 04/03/2023
2 projects
Key relationships
Everyone →
Design firms
1 projects
Filing representatives
Owners
Peter Storeylatest 07/01/2026
48 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01221354 ↗465 GREENWICH STREET
MANHATTAN
Alteration COPermit Issued05/13/202509/25/2026Partial renovation of 1ST floor space & Cellar. Construction includes removal of non-load bearing interior partitions addition of mezzanine,…
M01285053 ↗92 HORATIO STREET
MANHATTAN
AlterationPermit Issued01/27/202608/31/2026
Contractor ZITAN BILT INC
PARTIAL RENOVATION OF 1ST FLOOR SPACE. RELOCATION EXISTING PLUMBING FIXTURES AND ADDITION OF WASHER. NO CHANGE IN USE, EGRESS OR OCCUPANCY …
B01158902 ↗432 15 STREET
BROOKLYN
AlterationPermit Issued01/02/202508/26/2026
Contractor ZITAN BILT INC
Partial renovation of BASEMENT AND 2ND floors. Construction includes the relocation and addition of plumbing fixtures and capping of residen…
M01425212 ↗1040 PARK AVENUE
MANHATTAN
AlterationFiled — no permit on record07/17/2026——
M01411246 ↗73 5 AVENUE
MANHATTAN
AlterationPermit Issued06/11/202606/26/2026PARTIAL RENOVATION OF 3RD FLOOR SPACE. CONSTRUCTION INCLUDES THE REMOVAL OF NON- LOAD BEARING INTERIOR PARTITIONS, NEW MILLWORK, HARDWOOD FL…
M00980788 ↗130 EAST 18 STREET
MANHATTAN
AlterationPermit Issued12/27/202303/06/2026COMBINATION OF UNITS 2B & 2C INTO ONE UNIT PER TPPN 3-97. REMOVAL & CAPPING OF GAS STOVE (2B KITCHEN) & INSTALLATION OF BATH IN EXISTING 2B …
Counts cover all 38 projects (38 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Peter Storey4807/01/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
P.A. COLLINS PE107/17/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ORCHARD CONSTRUCTION GROU310/04/2024
CAMPBELL DESIGN &206/25/2022
HYDROKINETIC PLBG & HTG I206/24/2022
METROTECH MECHANICAL CORP207/31/2024
NEW YORK GENERAL CONST*206/11/2026
RRP PLUMBING CORP204/28/2026
SHEKO INC210/04/2021
ZITAN BILT INC204/28/2026
ADVANCE TEAM CONSULTANT *108/11/2025
AIR DONE RITE INC109/16/2025
AMC PLBG, HTG & CLNG, INC101/23/2025
ASPECT PLBNG&HTNG CO LLC111/15/2023
B N J CONSTRUCTION CORP101/20/2026
BENT MECHANICAL CORP111/03/2023
BT'S PLUMBING AND HEATING102/25/2021
CK PLUMBING & MECH INC112/27/2023
COPPER MECHANICAL INC109/26/2020
CROSSFIELD PLBG.&HTG.CORP102/28/2023
CROWN PLUMBING INC101/20/2026
CUBE BUILDERS GROUP NY106/18/2021
DIAMOND ERA CONSTR. INC103/07/2022
DIONISOS CONSTRUCTION112/02/2021
DPH PLUMBING & HTG CORP108/08/2022
EXPRESS CONSTRUCTION NYC106/27/2022
GTS CONSTRUCTION CORP112/02/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HORATIO ARMS INC704/28/2026
232 EQUITIES CORP.202/25/2021
APT 6E208/08/2022
29-20 23RD AVENUE REALTY CORP112/02/2021
436 EAST 86 STREET112/27/2023
BUCHBINDER & WARREN LLC109/16/2025
SIREN MANAGEMENT CORP.111/15/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BIG ORANGE EXPEDITING, INC610/04/2021
BURNHAM NATIONWIDE INC208/26/2025
JAM CONSULTANTS, INC.107/17/2026
38 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 38Open permit 11Signed off 24Filed only 3
Any typeAlteration 37Alteration CO 1
38 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01221354 ↗465 GREENWICH STREET
MANHATTAN
Alteration COPermit Issued05/13/202509/25/2026Partial renovation of 1ST floor space & Cellar. Construction includes removal of non-load bearing interior partitions addition of mezzanine,…
M01285053 ↗92 HORATIO STREET
MANHATTAN
AlterationPermit Issued01/27/202608/31/2026
Contractor ZITAN BILT INC
PARTIAL RENOVATION OF 1ST FLOOR SPACE. RELOCATION EXISTING PLUMBING FIXTURES AND ADDITION OF WASHER. NO CHANGE IN USE, EGRESS OR OCCUPANCY …
B01158902 ↗432 15 STREET
BROOKLYN
AlterationPermit Issued01/02/202508/26/2026
Contractor ZITAN BILT INC
Partial renovation of BASEMENT AND 2ND floors. Construction includes the relocation and addition of plumbing fixtures and capping of residen…
M01425212 ↗1040 PARK AVENUE
MANHATTAN
AlterationFiled — no permit on record07/17/2026——
M01411246 ↗73 5 AVENUE
MANHATTAN
AlterationPermit Issued06/11/202606/26/2026PARTIAL RENOVATION OF 3RD FLOOR SPACE. CONSTRUCTION INCLUDES THE REMOVAL OF NON- LOAD BEARING INTERIOR PARTITIONS, NEW MILLWORK, HARDWOOD FL…
M00980788 ↗130 EAST 18 STREET
MANHATTAN
AlterationPermit Issued12/27/202303/06/2026COMBINATION OF UNITS 2B & 2C INTO ONE UNIT PER TPPN 3-97. REMOVAL & CAPPING OF GAS STOVE (2B KITCHEN) & INSTALLATION OF BATH IN EXISTING 2B …
M01317157 ↗92 HORATIO STREET
MANHATTAN
AlterationPermit Issued01/20/202602/23/2026PARTIAL RENOVATION OF APARTMENT 5F. INTERIOR REMOVAL OF EXISTING NON-STRUCTURAL PARTITIONS & FLOOR FINISHES. INSTALLATION OF NEW NON-STRUCTU…
M01114686 ↗92 HORATIO STREET
MANHATTAN
AlterationPermit Issued10/04/202401/15/2026Replacement of entry door in existing opening with new door surround. No change in use, Egress or occupancy is included in this application
M01285783 ↗129 5 AVENUE
MANHATTAN
AlterationPermit Issued09/16/202511/24/2025
Contractor AIR DONE RITE
Construction includes the installation of new interior air handlers in existing drop ceilings and an exterior condensing unit on the 6th Flo…
B01277518 ↗432 15 STREET
BROOKLYN
AlterationFiled — no permit on record08/26/2025——
B00929821 ↗61 EASTERN PARKWAY
BROOKLYN
AlterationSigned-off10/26/202308/07/2024PARTIAL RENOVATION OF UNIT 3D ON THE 3RD FLOOR. REMOVAL OF NON-STRUCTURAL PARTITIONS, CONVERSION OF A JANITORS CLOSET TO A POWDER ROOM AND T…
Q00828800 ↗18-43 21 DRIVE
QUEENS
AlterationSigned-off02/23/202304/04/2024PARTIAL RENOVATION OF GRND FLR & LEVEL 2. REMOVAL OF INTERIOR FINISHES, NON-STRUCTURAL PARTITIONS, SELECT WINDOWS & DOORS. NEW NON-STRUCTURA…
M00953689 ↗16 PARK AVENUE
MANHATTAN
AlterationSigned-off11/15/202303/26/2024COMBINATION OF UNITS 6C & 6D ON THE 6TH FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. REMOVAL OF A NON-STRUCTURAL PARTITIONS. INSTALLATION OF N…
M00764453 ↗58 WEST 75 STREET
MANHATTAN
AlterationPermit Issued06/27/202203/04/2024PARTIAL RENOVATION OF CELLAR, BASEMENT, 1ST, 2ND, 3RD & 4TH FLOOR SPACE. INTERIOR REMOVAL OF PARTITIONS, CASEWORK & FLOOR FINISHES. CONSTRUC…
M00951474 ↗320 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off10/24/202301/09/2024PARTIAL RENOVATION OF 6TH FLOOR SPACE. REPLACEMENT OF PLUMBING FIXTURES IN EXISTING LOCATIONS. RELOCATION OF WASHER & DRYER. ADDITION OF NEW…
M00950175 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off11/03/202312/18/2023COMBINATION OF UNITS 3C & 3D ON THE 3RD FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. REMOVAL OF ONE GAS STOVE & REPLACEMENT OF PLUMBING FIXTUR…
Q00828829 ↗18-43 21 DRIVE
QUEENS
AlterationSigned-off02/23/202305/10/2023PARTIAL RENOVATION OF GRND FLR & LEVEL 2. REMOVAL OF SELECT PLUMBING FIXTURES. NEW & RELOCATED PLUMBING FIXTURES. NO CHANGE IN USE EGRESS OR…
M00474809 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off05/07/202105/01/2023WORK FILED HEREWITH FOR PARTIAL RENOVATION OF 5TH FLOOR SPACE. INTERIOR REMOVAL OF EXISTING PARTITIONS, FIXTURES, CASEWORK & FLOOR FINISHES.…
B00708161 ↗128 6 AVENUE
BROOKLYN
AlterationSigned-off04/20/202204/18/2023PARTIAL RENOVATION OF 2ND FLOOR SPACE. CONSTRUCTION INCLUDES THE REMOVAL AND INSTALLATION OF A NEW NON-STRUCTURAL PARTITION & REPLACEMENT OF…
M00753251 ↗71 LUDLOW STREET
MANHATTAN
AlterationSigned-off06/25/202204/03/2023PARTIAL RENOVATION OF 3RD FLOOR. INTERIOR REMOVAL OF EXISTING PARTITIONS, FIXTURES & CASEWORK. CONSTRUCTION INCLUDES NEW PARTITIONS. NO CHAN…
M00776382 ↗50 LEXINGTON AVENUE
MANHATTAN
AlterationPermit Issued08/08/202203/13/2023
Owner APT 6E
Contractor HERON BEGGS
COMBINATION OF UNITS 6E & 6F ON THE 6TH FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. PARTIAL REMOVAL OF A NON-STRUCTURAL PARTITION. NEW DOOR C…
M00786857 ↗50 LEXINGTON AVENUE
MANHATTAN
AlterationPermit Issued08/08/202203/09/2023
Owner APT 6E
PARTIAL RENOVATION OF SIXTH FLOOR SPACE. CONSTRUCTION INCLUDES REMOVAL OF A SINK AND A INSTALLATION OF A NEW WASHER AND DRYER. NO CHANGE IN …
B00710777 ↗128 6 AVENUE
BROOKLYN
AlterationSigned-off04/20/202212/26/2022Relocation of 3 sanitary fixtures, addition of washer and replacement of 2 sanitary fixtures. No Change in Use Egress or Occupancy
M00687109 ↗130 WEST 86 STREET
MANHATTAN
AlterationSigned-off03/07/202210/04/2022PARTIAL RENOVATION OF 5TH FLOOR SPACE. CONSTRUCTION INCLUDES INSTALLATION OF A NEW WASHER AND VENTLESS DRYER
M00703541 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off04/18/202209/03/2022PARTIAL RENOVATION OF 3RD FLOOR SPACE. INTERIOR REMOVAL OF EXISTING NON-STRUCTURAL PARTITIONS & FLOOR FINISHES. INSTALLATION OF NEW NON-STRU…
M00753256 ↗71 LUDLOW STREET
MANHATTAN
AlterationSigned-off06/24/202208/19/2022PARTIAL RENOVATION OF 3RD FLOOR SPACE. REPLACEMENT OF PLUMBING FIXTURES IN EXISTING LOCATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INCLU…
M00702402 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off04/27/202207/25/2022PARTIAL RENOVATION OF 3RD FLOOR SPACE. INTERIOR REMOVAL OF EXISTING NON-STRUCTURAL PARTITIONS & FLOOR FINISHES. INSTALLATION OF NEW NON-STRU…
M00683108 ↗170 WEST 76 STREET
MANHATTAN
AlterationSigned-off02/19/202204/11/2022WORK FILED FOR PARTIAL RENOVATION OF 7TH FLOOR SPACE, CONSTRUCTION INCLUDES REPLACEMENT OF PLUMBING FIXTURES ON EXISTING LINES AND THE INSTA…
M00462176 ↗232 EAST 6 STREET
MANHATTAN
AlterationSigned-off02/25/202103/31/2022INTERIOR RENOVATION OF APT ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00687068 ↗130 WEST 86 STREET
MANHATTAN
AlterationSigned-off03/07/202203/18/2022PARTIAL RENOVATION OF 5TH FLOOR SPACE. CONSTRUCTION INCLUDES INSTALLATION OF A NEW WASHER AND VENTLESS DRYER, NEW HARDWOOD FLOORING & REMOVA…
M00456150 ↗170 WEST 76 STREET
MANHATTAN
AlterationSigned-off06/24/202103/01/2022
Contractor SHEKO INC
WORK FILED FOR PARTIAL RENOVATION OF 7TH FLOOR SPACE, CONSTRUCTION INCLUDES INSTALATION OF A NEW SPLIT SYSTEM HVAC SYSTEM FILED UNDER JOB#M0…
M00456175 ↗170 WEST 76 STREET
MANHATTAN
AlterationSigned-off10/04/202103/01/2022
Contractor SHEKO INC
WORK FILED FOR INSTALATION OF A NEW SPLIT SYSTEM HVAC SYSTEM, NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INCLUDED IN THIS APPLICATION.
Q00625695 ↗23-02 31 STREET
QUEENS
AlterationSigned-off12/02/202102/18/2022
Contractor MATTHEW GERSTUNG
GENERAL CONSTRUCTION TO INCLUDE BUILD OUT AND RENOVATIONS OF SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00474812 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off05/20/202108/31/2021PLUMBING WORK FILED HEREWITH AS PER PLANS. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00388950 ↗157 PROSPECT PARK WEST
BROOKLYN
AlterationSigned-off09/26/202007/19/2021PLUMBING WORK AS PER PLANS FILED.
M00503146 ↗92 HORATIO STREET
MANHATTAN
AlterationSigned-off06/18/202107/14/2021WORK FILED HEREWITH FOR PARTIAL RENOVATION OF 3RD FLOOR SPACE. INTERIOR REMOVAL OF EXISTING NON-STRUCTURAL PARTITION & CONSTRUCTION OF A NEW…
M00542283 ↗92 HORATIO STREET
MANHATTAN
AlterationFiled — no permit on record06/18/2021——
M00462241 ↗232 EAST 6 STREET
MANHATTAN
AlterationSigned-off02/25/202105/25/2021PLUMBING WORK FILED HEREWITH AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Scope of Work
HVAC — 2 projects · most recent 07/17/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
Plumbing — 8 projects · most recent 07/17/2026
Water/Sanitary Gas
Structural — 1 project · most recent 01/20/2026
No specific sub-scope on file — project count only.
Earthwork — 2 projects · most recent 04/28/2026
Tenant Protection Plan 72 Hour
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
1040 PARK AVENUE ↗107/01/2026
73 5 AVENUE ↗206/03/2026
92 HORATIO STREET ↗1404/28/2026
129 5 AVENUE ↗109/11/2025
432 15 STREET ↗308/26/2025
465 GREENWICH STREET ↗206/11/2025
320 CENTRAL PARK WEST ↗407/26/2024
18-43 21 DRIVE ↗302/27/2024
130 EAST 18 STREET ↗212/21/2023
16 PARK AVENUE ↗211/13/2023
61 EASTERN PARKWAY ↗309/25/2023
50 LEXINGTON AVENUE ↗207/18/2022
58 WEST 75 STREET ↗106/25/2022
71 LUDLOW STREET ↗206/07/2022
128 6 AVENUE ↗203/29/2022
130 WEST 86 STREET ↗202/24/2022
170 WEST 76 STREET ↗502/17/2022
23-02 31 STREET ↗111/05/2021
232 EAST 6 STREET ↗201/28/2021
157 PROSPECT PARK WEST ↗1—
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings57
▸DOB NOWPlans/Sketch50
Showing 3 of 50 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
▸DOB NOWPlans/Sketch - General Construction3
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Applications & Permits36
▸DOB NOWLPC Approval/Permit36
09/04/2026M00462176-I1 · 232 EAST 6 STREETOpen ↗
09/03/2026M00542283-I1 · 92 HORATIO STREETOpen ↗
09/03/2026M00456150-I1 · 170 WEST 76 STREETOpen ↗
Showing 3 of 36 on file for this type
▸Seals & Professional Certifications101
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/04/2026M00462176-I1 · 232 EAST 6 STREETOpen ↗
09/04/2026M00462241-I1 · 232 EAST 6 STREETOpen ↗
09/03/2026M00474812-I1 · 92 HORATIO STREETOpen ↗
Showing 3 of 54 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/23/2026M01285783-I1 · 129 5 AVENUEOpen ↗
09/22/2026M01411246-I1 · 73 5 AVENUEOpen ↗
09/22/2026M01411246-I1 · 73 5 AVENUEOpen ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01285783-I1 · 129 5 AVENUEOpen ↗
09/22/2026M01411246-I1 · 73 5 AVENUEOpen ↗
09/01/2026B00929821-I1 · 61 EASTERN PARKWAYOpen ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026M01221354-I1 · 465 GREENWICH STREETOpen ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00388950-I1 · 157 PROSPECT PARK WESTOpen ↗
▸Environmental & Asbestos49
▸DOB NOWDEP ACP-5: Asbestos Assessment Report42
09/04/2026M00462176-I1 · 232 EAST 6 STREETOpen ↗
09/03/2026M00542283-I1 · 92 HORATIO STREETOpen ↗
09/03/2026M00456150-I1 · 170 WEST 76 STREETOpen ↗
Showing 3 of 42 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/28/2026M00950175-S1 · 92 HORATIO STREETOpen ↗
08/28/2026M00980788-S1 · 130 EAST 18 STREETOpen ↗
08/28/2026M00980788-I1 · 130 EAST 18 STREETOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed1
08/13/2026Q00625695-I1 · 23-02 31 STREETOpen ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026Q00625695-I1 · 23-02 31 STREETOpen ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
09/04/2026M00462176-I1 · 232 EAST 6 STREETOpen ↗
08/13/2026Q00625695-I1 · 23-02 31 STREETOpen ↗
08/13/2026M00456175-I1 · 170 WEST 76 STREETOpen ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M00764453-I1 · 58 WEST 75 STREETOpen ↗