| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435671 ↗ | 5 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 08/14/2026 | 09/29/2026 | Owner BROOKFIELD PROPERTIES Contractor ALSS CONSTRUCTION INC Filer DVA Advisors | Renovation of existing food and beverage space as shown on plans submitted herewith. |
| B01226832 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 06/18/2025 | 09/21/2026 | Owner 9 DEKALB FEE OWNER LLC Contractor TRITON CONSTRUCTION CO., Filer MBE CODE & ZONING LLC | The work filing here within consist if the removal of existing based buildings sprinklers heads and associated branch piping and the install… |
| M01437266 ↗ | 11 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 09/09/2026 | Contractor SUFFOLK CONSTRUCTION COMP Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS AND CARPENTRY AS PER PLANS FILED HEREWITH. DEMO PORTION OF EXISTING WALL TO P… |
| B01425685 ↗ | 9 DEKALB AVENUE BROOKLYN | No Work | Filed — no permit on record | 07/07/2026 | — | — | — |
| M01409157 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 06/12/2026 | 06/18/2026 | Contractor ATLAS SUPREME SERVICE INC | Interior demolition with renovations on construction floor 20 (marketing floor 24) as per plans filed herewith. No change to use, egress, or… |
| X00530025 ↗ | 2447 3RD AVENUE BRONX | Alteration CO | Permit Issued | 06/07/2021 | 05/18/2026 | Owner 350 GERARD HOLDINGS LLC Contractor PLATINUM TNT LLC Filer JM ZONING, LLC. | Structural work filed in conjunction with ALTCO X00530025 for a change in use. |
| Person | Filings | Most recent |
|---|---|---|
| DAVID BROWN | 32 | 07/10/2026 |
| James Hickerson | 8 | 07/30/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NEW YORK ENGINEERS LLC | 4 | 09/25/2025 |
| SEVERUD ASSOCIATES | 3 | 09/25/2025 |
| PANY & LENTZ ENGINEERING COMPANY | 2 | 08/11/2022 |
| SKYLINE ENGINEERING, LLC | 2 | 07/14/2026 |
| AVCON ENGINEERING PC | 1 | 08/17/2026 |
| DERMAN ENGINEERING PLLC | 1 | 07/14/2026 |
| GEA CONSULTING ENGINEERS | 1 | 11/21/2022 |
| JAROS BAUM & BOLLES | 1 | 08/04/2026 |
| MRCE | 1 | 08/04/2026 |
| WEXLER ASSOCIATES | 1 | 11/21/2022 |
| WSP | 1 | 08/04/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURE TONE, LLC | 11 | 08/18/2025 |
| JRM CONSTRUCTION MGMT LLC | 6 | 06/12/2025 |
| SCHIMENTI CONSTRUCTION CO | 3 | 02/19/2026 |
| CENTRAL FIVE HOME IMPROVE | 2 | 10/21/2022 |
| ADDISON PLBG AND HTG CORP | 1 | 08/04/2026 |
| ALSS CONSTRUCTION INC | 1 | 08/17/2026 |
| AMERICAN STANDARD P&H COR | 1 | 08/26/2026 |
| ARTIMUS CONSTRUCTION INC | 1 | 02/10/2023 |
| ATLAS SUPREME SERVICE INC | 1 | 06/12/2026 |
| BRENNAN OPERATING INC | 1 | 05/15/2025 |
| F.S. WORKS INC | 1 | 07/14/2026 |
| FORWARD MECHANICAL CORP | 1 | 02/10/2023 |
| HIGH QUALITY CONSTRUCTION | 1 | 08/26/2026 |
| HYDROKINETIC PLBG & HTG I | 1 | 08/17/2026 |
| I & G GROUP, INC | 1 | 07/12/2021 |
| MECHANICAL EAST CO.,INC | 1 | 07/14/2026 |
| P.H. WORKS INC | 1 | 07/14/2026 |
| PLATINUM TNT LLC | 1 | 07/14/2026 |
| STAT FIRE SPRINKLER NYC C | 1 | 08/04/2026 |
| SUFFOLK CONSTRUCTION COMP | 1 | 08/06/2026 |
| TRITON CONSTRUCTION CO., | 1 | 08/04/2026 |
| TURNER CONSTRUCTION COMPA | 1 | 11/30/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BLOOMBERG LP | 6 | 06/11/2025 |
| SEWARD PARK COOP | 4 | 09/25/2025 |
| RELATED HUDSON YARDS MANAGER | 3 | 06/12/2026 |
| VORNADO REALTY TRUST | 3 | 11/30/2025 |
| IMG | 2 | 08/16/2022 |
| 225 East Realty Partners LLC | 1 | 07/14/2026 |
| 350 GERARD HOLDINGS LLC | 1 | 07/14/2026 |
| 9 DEKALB FEE OWNER LLC | 1 | 08/04/2026 |
| AKAM ASSOCIATES, INC. | 1 | 08/26/2026 |
| BROOKFIELD PROPERTIES | 1 | 08/17/2026 |
| E 135 AND 3RD AVE OWNER | 1 | 02/10/2023 |
| Evenhar Development Corp | 1 | 11/21/2022 |
| L&L HOLDING COMPANY LLC | 1 | 07/27/2022 |
| NAHLA CAPITAL | 1 | 09/29/2022 |
| SEWARD PARK HOUSING CORP. | 1 | 09/25/2025 |
| THE CHETRIT GROUP | 1 | 07/12/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 12 | 09/25/2025 |
| JM ZONING, LLC. | 5 | 08/26/2026 |
| A1 EXPEDITING SERVICE CORP. | 4 | 06/12/2026 |
| ARCHETYPE CONSULTANTS, INC. | 2 | 08/22/2023 |
| CROWN DESIGN & CONSULTING | 2 | 08/16/2022 |
| DVA Advisors | 1 | 08/17/2026 |
| GILLMAN CONSULTING INC | 1 | 08/06/2026 |
| MBE CODE & ZONING LLC | 1 | 08/04/2026 |
| WILLIAM VITACCO ASSOCIATES | 1 | 07/12/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435671 ↗ | 5 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 08/14/2026 | 09/29/2026 | Owner BROOKFIELD PROPERTIES Contractor ALSS CONSTRUCTION INC Filer DVA Advisors | Renovation of existing food and beverage space as shown on plans submitted herewith. |
| B01226832 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 06/18/2025 | 09/21/2026 | Owner 9 DEKALB FEE OWNER LLC Contractor TRITON CONSTRUCTION CO., Filer MBE CODE & ZONING LLC | The work filing here within consist if the removal of existing based buildings sprinklers heads and associated branch piping and the install… |
| M01437266 ↗ | 11 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 09/09/2026 | Contractor SUFFOLK CONSTRUCTION COMP Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS AND CARPENTRY AS PER PLANS FILED HEREWITH. DEMO PORTION OF EXISTING WALL TO P… |
| B01425685 ↗ | 9 DEKALB AVENUE BROOKLYN | No Work | Filed — no permit on record | 07/07/2026 | — | — | — |
| M01409157 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 06/12/2026 | 06/18/2026 | Contractor ATLAS SUPREME SERVICE INC | Interior demolition with renovations on construction floor 20 (marketing floor 24) as per plans filed herewith. No change to use, egress, or… |
| X00530025 ↗ | 2447 3RD AVENUE BRONX | Alteration CO | Permit Issued | 06/07/2021 | 05/18/2026 | Owner 350 GERARD HOLDINGS LLC Contractor PLATINUM TNT LLC Filer JM ZONING, LLC. | Structural work filed in conjunction with ALTCO X00530025 for a change in use. |
| M01343770 ↗ | 610 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/19/2026 | 03/27/2026 | Contractor SCHIMENTI CONSTRUCTION CO | Renovations of existing skate hut in basement as per plans. No change to use, egress or occupancy. |
| M01298378 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Permit Issued | 11/30/2025 | 01/08/2026 | Owner VORNADO REALTY TRUST Contractor TURNER CONSTRUCTION COMPANY | Installation of new LULA elevator from floor 6 to the 7. Installation of pit into the ceiling of Floor 5. |
| M01278879 ↗ | 409 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | Owner SEWARD PARK COOP Filer RIZZO GROUP | — |
| M01278934 ↗ | 409 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | Owner SEWARD PARK COOP Filer RIZZO GROUP | — |
| M01278977 ↗ | 357 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | Owner SEWARD PARK COOP Filer RIZZO GROUP | — |
| M01278998 ↗ | 357 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | Owner SEWARD PARK COOP Filer RIZZO GROUP | — |
| M01014786 ↗ | 25 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 03/19/2024 | 07/16/2025 | Contractor BRENNAN OPERATING | General construction modifications taking place in the lobby as indicated on the drawings. |
| M01230428 ↗ | 500 WEST 33 STREET MANHATTAN | No Work | Filed — no permit on record | 06/11/2025 | — | — | — |
| M01230437 ↗ | 500 WEST 33 STREET MANHATTAN | No Work | Filed — no permit on record | 06/11/2025 | — | — | — |
| M01235683 ↗ | 500 WEST 33 STREET MANHATTAN | No Work | Filed — no permit on record | 06/11/2025 | — | — | — |
| M01179310 ↗ | 11 AVENUE MANHATTAN | No Work | Filed — no permit on record | 05/08/2025 | — | — | — |
| M01170309 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 03/26/2025 | 03/31/2025 | Contractor JRM CONSTRUCTION MGMT LLC | Demolition and interior renovations / modifications as per plans filed herewith. No change to use, egress or occupancy. |
| M01184024 ↗ | 500 GRAND STREET MANHATTAN | Alteration | Permit Issued | 03/18/2025 | 03/28/2025 | Owner AKAM ASSOCIATES, INC. Contractor AMERICAN STANDARD P&H CORORP. Filer JM ZONING, LLC. | Plumbing work filed in conjunction with renovation of unit C3H on the 3rd floor of residential building. No change in use, occupancy, or egr… |
| M01116940 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 11/25/2024 | 12/05/2024 | Contractor JRM CONSTRUCTION MGMT LLC | Interior renovations on construction floors 20 (Tenant/Marketing Floors 24) as per plans filed herewith. No change to use, egress, or occupa… |
| M01071850 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/06/2024 | 11/26/2024 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS ON THE 8TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01077905 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/06/2024 | 11/26/2024 | Contractor STRUCTURE TONE, LLC | GENERAL CONSTRUCTION MODIFICATIONS ON THE 9TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01055798 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 10/23/2024 | 10/30/2024 | Contractor JRM CONSTRUCTION MGMT LLC | Interior demolition with renovations / modifications as per plans filed herewith. No change to use, egress or occupancy. |
| M00925137 ↗ | 114 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/20/2023 | 10/27/2023 | Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | General construction to take place on the 9th floor as per plans filed herewith. No change in use, egress, or occupancy. |
| M00839285 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 09/21/2023 | Owner VORNADO REALTY TRUST Contractor JRM CONSTRUCTION MGMT LLC | Architectural work on the 3rd floor as indicated on drawings |
| X00824355 ↗ | 223 EAST 134 STREET BRONX | Alteration | Signed-off | 02/09/2023 | 04/29/2023 | Owner E 135 AND 3RD AVE OWNER Contractor XOLLE DEMO LLC Filer JM ZONING, LLC. | removal of existing site features including but not limited to existing asphalt, fences and installation of new asphalt and fences |
| M00661203 ↗ | 600 3 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2022 | 02/10/2023 | Owner L & L HOLDING Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | General construction modifications/demolition taking place on the 34th floor as per plans filed herewith. No change in use, egress nor occup… |
| M00810318 ↗ | 4951 CHAMBERS STREET MANHATTAN | No Work | Filed — no permit on record | 01/13/2023 | — | — | — |
| M08022023 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/07/2022 | 12/01/2022 | Owner VORNADO REALTY TRUST Contractor JRM CONSTRUCTION MGMT LLC | Architectural work on the 1st, 2nd, 3rd and 4th floor as indicated on drawings. The EN drawings for lighting are filed under M08022042-I1 |
| M08043337 ↗ | 4951 CHAMBERS STREET MANHATTAN | No Work | Filed — no permit on record | 11/28/2022 | — | — | — |
| M08007990 ↗ | 154 LEXINGTON AVENUE MANHATTAN | New Building | Filed — no permit on record | 11/03/2022 | — | Owner Evenhar Development Corp Filer JM ZONING, LLC. | — |
| M08020809 ↗ | 915 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/21/2022 | 10/27/2022 | Contractor CENTRAL FIVE HOME IMPROVE | RENOVATE AND COMBINE UNITS 104 AND 106 PER TPPN # 3/97 ON THE 1ST FLOOR. RENOVATE UNITS 1502 AND 1507 ON THE 15TH FLOOR. WORK TO INCLUDE REM… |
| M08007910 ↗ | 915 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2022 | 10/19/2022 | Owner NAHLA CAPITAL Contractor CENTRAL FIVE HOME IMPROVE Filer JM ZONING, LLC. | RENOVATE UNITS 7C AND 7H ON THE 7TH FLOOR AND SOFFIT REPAIR ON THE 6TH FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD … |
| M08016350 ↗ | 4951 CHAMBERS STREET MANHATTAN | No Work | Filed — no permit on record | 10/11/2022 | — | — | — |
| M08000106 ↗ | 4951 CHAMBERS STREET MANHATTAN | No Work | Filed — no permit on record | 09/14/2022 | — | — | — |
| M08000046 ↗ | 4951 CHAMBERS STREET MANHATTAN | No Work | Filed — no permit on record | 09/12/2022 | — | — | — |
| M00449743 ↗ | 4951 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 04/14/2021 | 06/29/2022 | Owner IMG Contractor SCHIMENTI CONSTRUCTION CO | Construction work associated with the ALT 1: CHANGE OF USE FROM A BANK USE TO A F-3 ASSEMBLY SPACE as directed by NYC Development HUB. |
| M00449808 ↗ | 4951 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 04/14/2021 | 06/29/2022 | Owner IMG Contractor SCHIMENTI CONSTRUCTION CO | WORK FOR INTERIOR RENOVATION OF EXISTING BANK IN CONJUNCTION WITH ALT1 APPLICATION 121186821 CHANGE OF USE FROM A BANK USE TO A F-3 ASSEMBLY… |
| M00606532 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2021 | 02/09/2022 | Contractor STRUCTURE TONE, LLC | General construction modification on floors 4 through 11 consisting of new convenience stair work. No change to use, egress, or occupancy. |
| M00642351 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2021 | 02/09/2022 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Construction modifications of an accessory stair taking place on the 7th - 9th floors as indicated on the drawings. |
| M00642375 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2021 | 02/09/2022 | Contractor STRUCTURE TONE, LLC | Construction modifications of an accessory stair on the 9th - 11th floors as indicated on the drawings. |
| M00606499 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2021 | 01/31/2022 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | General Construction modifications taking place on the 1st floor (warming pantry space) per plans filed herewith. No change in use, egress, … |
| M00606140 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2021 | 01/28/2022 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | General construction of 1st floor and 4th floor elevator cab areas, and modifications on floors 5 and 6 as per plans filed herewith. No chan… |
| M00606209 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2021 | 01/28/2022 | Contractor STRUCTURE TONE, LLC | General construction modification to floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy. |
| M00606465 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2021 | 01/28/2022 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | General construction modification on floors 8 and 9 per plans filed herewith. Work includes interior partition removal and associated finish… |
| M00554082 ↗ | 100 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 07/12/2021 | 11/12/2021 | Owner CHETRIT GROUP Contractor I & G GROUP, INC | Interior Demolition of existing partitions for apt 15B and PH1 as shown on plans. |
| M00574848 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/21/2021 | 10/06/2021 | Owner BLOOMBERG LP Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | General construction modification on floors 5 - 7 and 11 as per plans filed herewith. Includes removal interior non-load bearing partitions … |
| Building | Filings | Most Recent |
|---|---|---|
| 9 DEKALB AVENUE ↗ | 5 | 07/30/2026 |
| 11 AVENUE ↗ | 2 | 07/28/2026 |
| 5 WEST 33 STREET ↗ | 1 | 07/23/2026 |
| 500 GRAND STREET ↗ | 5 | 07/10/2026 |
| 2447 3RD AVENUE ↗ | 5 | 06/29/2026 |
| 500 WEST 33 STREET ↗ | 9 | 05/29/2026 |
| 151 EAST 58 STREET ↗ | 5 | 10/06/2025 |
| 409 GRAND STREET ↗ | 1 | 08/28/2025 |
| 409 GRAND STREET ↗ | 1 | 08/28/2025 |
| 357 GRAND STREET ↗ | 1 | 08/28/2025 |
| 357 GRAND STREET ↗ | 1 | 08/28/2025 |
| 919 3 AVENUE ↗ | 15 | 04/10/2025 |
| 114 5 AVENUE ↗ | 2 | 02/13/2024 |
| 915 WEST END AVENUE ↗ | 3 | 09/28/2022 |
| 4951 CHAMBERS STREET ↗ | 8 | 08/11/2022 |
| 600 3 AVENUE ↗ | 2 | 07/14/2022 |
| 100 WEST 58 STREET ↗ | 1 | 07/08/2021 |
| 25 SUTTON PLACE SOUTH ↗ | 2 | — |
| 610 5 AVENUE ↗ | 1 | — |
| 154 LEXINGTON AVENUE ↗ | 1 | — |
| 223 EAST 134 STREET ↗ | 1 | — |