| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01171965 ↗ | 53 NORTH MOORE STREET MANHATTAN | Alteration | Signed-off | 01/31/2025 | 04/20/2026 | Contractor DKC | SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00900093 ↗ | 154 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 07/11/2023 | 07/28/2025 | Contractor G. C. PLBG & HTG INC Filer EA DESIGN GROUP, INC. | APPLICATION FIELD FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE BASEMENT, 1ST, 2ND, AND 3RD FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M00625813 ↗ | 330 EAST 75 STREET MANHATTAN | Alteration | Permit Issued | 02/04/2022 | 07/21/2023 | Contractor DKC | FILING HEREWITH FOR NTERIOR RENOVATION TO INCLUDE NON STRUCTURAL DEMO AND GENERAL CONSTRUCTION WORK AS SHOWN ON PLANS. THERE WILL BE NO CHA… |
| M00861931 ↗ | 60 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 04/26/2023 | 06/13/2023 | Contractor MASTER TECH PLUMBING LLC Filer RIZZO GROUP | Herewith filing drawings indicating plumbing work associated with application M00861503-I1 for apt 8ES. No change in egress, use or occupanc… |
| M00861503 ↗ | 60 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 04/26/2023 | 06/10/2023 | Contractor CAMI CONSTRUCTION CORP Filer RIZZO GROUP | Filing herewith drawings indicating interior renovations to apartment 8ES. No change in use egress or occupancy under this application. |
| M00861576 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Signed-off | 05/11/2023 | 06/01/2023 | Contractor EVERIT BUILDERS, LLC | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FL (APT 16A) AS PER PLANS FILED… |
| Name | Projects together | Most recent |
|---|---|---|
| KEVIN GALLEN PE LLC | 1 | 05/07/2024 |
| REILLY TARANTINO ENGINEERING | 1 | 05/07/2024 |
| SY ENGINEERING PLLC | 1 | 02/06/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| SECOND AVE SOLOW DEV CORP | 7 | 09/08/2025 |
| AGRESSIVE FIRE PROT LLC | 3 | 12/06/2019 |
| OLYMPIC PLBG & HTG SVC IN | 3 | 12/05/2019 |
| ANESIS SERVICES CORP | 2 | 09/25/2020 |
| ASHLAR MECHANICAL CORP | 2 | 02/08/2021 |
| DKC INC | 2 | 02/06/2026 |
| ACCURATE MECHANICAL INC | 1 | 01/19/2022 |
| BENCHMARK BUILDERS INC | 1 | 10/17/2019 |
| CAMI CONSTRUCTION CORP | 1 | 04/26/2023 |
| CASE PLUMBING LLC | 1 | 02/06/2026 |
| EVERIT BUILDERS, LLC | 1 | 05/11/2023 |
| G. C. PLBG & HTG INC | 1 | 07/21/2025 |
| G.P. MECHANICAL CORP | 1 | 06/29/2020 |
| LEBESS MECHANICAL CORP | 1 | 02/06/2026 |
| M & S MECHANICAL SVCS INC | 1 | 02/02/2021 |
| M. SPINELLI PLB & HTG INC | 1 | 02/06/2026 |
| MASTER TECH PLUMBING LLC | 1 | 04/26/2023 |
| NYC PERFECT BUILDERS,INC | 1 | 10/02/2019 |
| POLGANO PLUMBING INC | 1 | 03/23/2020 |
| T.N.T PLBG & HTG INC | 1 | 06/29/2020 |
| WATER DYNAMIC P & H CORP | 1 | 09/25/2020 |
| WHITE HILL RESTORATION IN | 1 | 05/12/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| SOLOW REALTY & DEVELOPMEN | 9 | 09/08/2025 |
| R.F. STUART, REAL ESTATE | 1 | 03/23/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| EA DESIGN GROUP, INC. | 5 | 07/21/2025 |
| RIZZO GROUP | 3 | 04/26/2023 |
| CITY WIDE EXPEDITING INC. | 1 | 05/07/2024 |
| EMPIRE CITY CONSULTANTS, INC. | 1 | 02/04/2022 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 02/06/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01171965 ↗ | 53 NORTH MOORE STREET MANHATTAN | Alteration | Signed-off | 01/31/2025 | 04/20/2026 | Contractor DKC | SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00900093 ↗ | 154 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 07/11/2023 | 07/28/2025 | Contractor G. C. PLBG & HTG INC Filer EA DESIGN GROUP, INC. | APPLICATION FIELD FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE BASEMENT, 1ST, 2ND, AND 3RD FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M00625813 ↗ | 330 EAST 75 STREET MANHATTAN | Alteration | Permit Issued | 02/04/2022 | 07/21/2023 | Contractor DKC | FILING HEREWITH FOR NTERIOR RENOVATION TO INCLUDE NON STRUCTURAL DEMO AND GENERAL CONSTRUCTION WORK AS SHOWN ON PLANS. THERE WILL BE NO CHA… |
| M00861931 ↗ | 60 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 04/26/2023 | 06/13/2023 | Contractor MASTER TECH PLUMBING LLC Filer RIZZO GROUP | Herewith filing drawings indicating plumbing work associated with application M00861503-I1 for apt 8ES. No change in egress, use or occupanc… |
| M00861503 ↗ | 60 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 04/26/2023 | 06/10/2023 | Contractor CAMI CONSTRUCTION CORP Filer RIZZO GROUP | Filing herewith drawings indicating interior renovations to apartment 8ES. No change in use egress or occupancy under this application. |
| M00861576 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Signed-off | 05/11/2023 | 06/01/2023 | Contractor EVERIT BUILDERS, LLC | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FL (APT 16A) AS PER PLANS FILED… |
| Q08046672 ↗ | 37-20 56 STREET QUEENS | New Building | Filed — no permit on record | 04/25/2023 | — | — | — |
| Q08046151 ↗ | 37-23 56 STREET QUEENS | Alteration CO | Filed — no permit on record | 04/21/2023 | — | — | |
| M00518341 ↗ | 128 JANE STREET MANHATTAN | Alteration | Signed-off | 06/15/2021 | 08/01/2022 | Contractor WHITE HILL RESTORATION IN Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FL (APT 3EF) AS PER PLANS FILED … |
| M00229535 ↗ | 580 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/15/2019 | 09/13/2021 | Contractor ANTHONY DISABATO | FILING HEREWITH FOR PLUMBING WORK ON AN EXITING APARTMENT ON THE FIFTH FLOOR AND INSTALLATION OF A NEW GAS METER. AS SHOWN ON PLANS..THERE W… |
| M00465840 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 02/08/2021 | 04/20/2021 | Contractor ASHLAR MECHANICAL CORP | APPLICATION FILED FOR SPRINKLER REMOVAL/MODIFICATIONS (INSTALL TEMP LOOP) ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E… |
| M00454515 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 02/02/2021 | 04/15/2021 | Contractor ASHLAR MECHANICAL CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR SPRINKLER REMOVAL/MODIFICATIONS (INSTALL TEMP LOOP) ON THE 10TH, 11TH, 41ST, & 42ND FLOORS AS PER PLANS FILED HEREWITH… |
| M00465828 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 02/08/2021 | 02/11/2021 | Contractor SECOND AVE SOLOW DEV CORP | APPLICATION FILED FOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANG… |
| M00465837 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Filed — no permit on record | 02/08/2021 | — | Filer EA DESIGN GROUP, INC. | — |
| M00455196 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 02/02/2021 | 02/04/2021 | Contractor M & S MECHANICAL SVCS INC Filer RIZZO GROUP | APPLICATION FILED FOR PLUMBING REMOVAL/MODIFICATIONS ON THE 10TH, 11TH, 41ST, & 42ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E… |
| M00455274 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 02/02/2021 | 02/04/2021 | Contractor SECOND AVE SOLOW DEV CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH, 11TH, 41ST, & 42ND FLOORS AS PER PLANS FIL… |
| M00330451 ↗ | 353 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 03/23/2020 | 10/26/2020 | Owner R.F. STUART, REAL ESTATE Contractor POLGANO PLUMBING INC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR PLUMBING WORK ON THE 8TH FLOOR (APT 8B) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00392762 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 09/25/2020 | 10/16/2020 | Contractor SECOND AVE SOLOW DEV CORP Filer RIZZO GROUP | APPLICATION FILED FOR MECHANICAL WORK ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00392754 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 09/25/2020 | 10/05/2020 | Contractor HYDRO PLBG & HTG CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR PLUMBING AND SPRINKLER MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| M00358697 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 06/29/2020 | 07/15/2020 | Contractor T.N.T PLBG & HTG INC | Modification of Sprinkler system with addition of 52 sprinkler for the new Medical office on 9th Floor, Old system to be removed once the ne… |
| M00358912 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 06/29/2020 | 07/06/2020 | Contractor G.P. MECHANICAL CORP | Remove and/or relocate existing risers on 8th & 9th floor as per drawing, install new risers, plumbing lines for hot and cold water, sanitat… |
| M00358936 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 07/01/2020 | 07/06/2020 | Contractor SECOND AVE SOLOW DEV CORP Filer RIZZO GROUP | Install new fresh air intake unit, associated ducts and piping; thermostats/temperature sensors; refrigerant piping; drains; fire dampers on… |
| M00261325 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 12/06/2019 | 04/24/2020 | Contractor AGGRESSIVE FIRE PROT LLC Filer RIZZO GROUP | Filing for sprinkler modifications to the 11th floor As per plans filed herewith. No change in use, egress or occupancy. |
| M00261346 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 12/05/2019 | 12/11/2019 | Contractor OLYMPIC PLBG & HTG SVC IN Filer RIZZO GROUP | Filing for plumbing modifications to the 11th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00261335 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 12/06/2019 | 12/07/2019 | Contractor SECOND AVE SOLOW DEV CORP Filer RIZZO GROUP | Filing for mechanical modifications to the 11th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00198593 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 10/11/2019 | 11/26/2019 | Contractor SECOND AVE SOLOW DEV CORP Filer RIZZO GROUP | Mechanical modifications to the 10th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00198607 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 11/15/2019 | 11/19/2019 | Contractor AGGRESSIVE FIRE PROT LLC Filer RIZZO GROUP | Mechanical modifications to the 10th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00191083 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Permit Issued | 07/23/2019 | 11/07/2019 | Contractor SECOND AVE SOLOW DEV CORP Filer RIZZO GROUP | Mechanical modifications to the 13th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00198625 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 10/10/2019 | 11/07/2019 | Contractor OLYMPIC PLBG & HTG SVC IN | Plumbing modifications to the 10th floor as per plans filed herewith. No change to use, egress or occupancy. |
| B00230072 ↗ | 1630 EAST 15 STREET BROOKLYN | Alteration | Signed-off | 10/02/2019 | 11/06/2019 | Contractor NYC PERFECT BUILDERS,INC | PROPOSED MODIFICATION OF EXISTING MECHANICAL SYSTEM AT PARTIAL SECOND FLOOR FOR OFFICE FIT-OUT AS INDICATED ON PLANS FILED HEREWITH. |
| B00230045 ↗ | 1630 EAST 15 STREET BROOKLYN | Alteration | Signed-off | 10/02/2019 | 10/24/2019 | Contractor THOMAS FAY | PROPOSED MODIFICATION OF EXISTING SPRINKLER SYSTEM AT PARTIAL SECOND FLOOR FOR OFFICE FIT-OUT AS INDICATED ON PLANS FILED HEREWITH. |
| M00220238 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/17/2019 | 10/23/2019 | Contractor BENCHMARK BUILDERS LLC | mechanical work on the 18th floor (DBS-POE) as indicated on drawings |
| M00191190 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 07/24/2019 | 09/24/2019 | Contractor AGGRESSIVE FIRE PROT LLC Filer RIZZO GROUP | Filing for sprinkler modifications to the 13th floor As per plans filed herewith. No change to use, egress or occupancy. |
| M00191134 ↗ | 4 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 07/23/2019 | 08/19/2019 | Contractor OLYMPIC PLBG & HTG SVC IN Filer RIZZO GROUP | Plumbing modifications to the 13th floor as per plans filed herewith. No change to use, egress or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 4 WEST 58 STREET ↗ | 17 | 02/06/2025 |
| 154 EAST 63 STREET ↗ | 1 | 07/05/2023 |
| 60 SUTTON PLACE SOUTH ↗ | 2 | 04/19/2023 |
| 128 JANE STREET ↗ | 2 | 04/25/2022 |
| 580 PARK AVENUE ↗ | 4 | 01/14/2022 |
| 9 WEST 57 STREET ↗ | 6 | 02/04/2021 |
| 353 EAST 72 STREET ↗ | 1 | 03/10/2020 |
| 330 EAST 75 STREET ↗ | 3 | — |
| 53 NORTH MOORE STREET ↗ | 3 | — |
| 1630 EAST 15 STREET ↗ | 2 | — |
| 250 WEST 34 STREET ↗ | 1 | — |
| 1523 2 AVENUE ↗ | 1 | — |
| 37-23 56 STREET ↗ | 1 | — |
| 37-20 56 STREET ↗ | 1 | — |