| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00463792 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Permit Issued | 12/28/2021 | 01/06/2026 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ALMAR PLUMBING & HTG CORP | PLUMNBING RENOVATION OF APARTMENT UNIT 13-44. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00719259 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Permit Issued | 09/08/2022 | 01/06/2026 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ALMAR PLUMBING & HTG CORP | RELOCATION OF EXISITNG PLUMBING FIXTURES AND INSTALLATION OF NEW ( APPROXIMATELY 1,515 SF) NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION… |
| M00729758 ↗ | 447 WEST 162 STREET MANHATTAN | Alteration CO | Permit Issued | 05/13/2022 | 08/01/2024 | Design ANDREW FREDMAN ARCHITECT LLC Owner SURFACE DEVELOPMENT Contractor ZONE PLUMBING & HEATING C | RELOCATION AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS. |
| B00803142 ↗ | 1580 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 12/30/2022 | 04/06/2023 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor VILLAGE P & H NY INC | RELOCATION OF EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW (APPROXIMATELY 1,672 S.F.). NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B00803133 ↗ | 1580 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 01/01/2023 | 03/13/2023 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor CONSTRUCTION XPERT INC | INTERIOR RENOVATION & COMBINATION OF APARTMENT UNIT #17 & #18 TO CREATE NEW APARTMENT UNIT #13 (APPROXIMATEY1,672 S.F.). NO CHANGE IN USE, E… |
| B00803148 ↗ | 1588 PRESIDENT STREET BROOKLYN | Alteration | Filed — no permit on record | 12/30/2022 | — | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC | — |
| Name | Projects together | Most recent |
|---|---|---|
| ANDREW FREDMAN ARCHITECT LLC | 26 | 08/24/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| VILLAGE P & H NY INC | 6 | 12/30/2022 |
| CONSTRUCTION XPERT INC | 4 | 01/01/2023 |
| ALMAR PLUMBING & HTG CORP | 3 | 08/24/2023 |
| ANSONIA CONDOMINIUM | 2 | 09/14/2022 |
| ZAF CORPORATION | 2 | 09/06/2021 |
| 5 BORO'S PLUMBING INC | 1 | 06/29/2023 |
| FOSTER RENOVATION CORP | 1 | 06/23/2021 |
| GREENTREE CONSTRUCTION IN | 1 | 06/29/2023 |
| JMW PLUMBING, INC | 1 | 02/19/2021 |
| MKA 25 INC | 1 | 06/29/2023 |
| ORBIT PLBG & HTG INC | 1 | 11/20/2019 |
| SUPERB PLUMBING & HEATING | 1 | 05/31/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MDAYS REALTY LLC | 8 | 01/01/2023 |
| ANSONIA ASSOCIATES LP | 1 | 08/24/2023 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 1 | 02/19/2021 |
| Kyrous Realty Group | 1 | 11/20/2019 |
| SURFACE DEVELOPMENT | 1 | 06/29/2023 |
| VANGUARD INVESTORS LTD | 1 | 09/06/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 7 | 08/24/2023 |
| A1 EXPEDITING SERVICE CORP. | 5 | 01/01/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00463792 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Permit Issued | 12/28/2021 | 01/06/2026 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ALMAR PLUMBING & HTG CORP | PLUMNBING RENOVATION OF APARTMENT UNIT 13-44. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00719259 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Permit Issued | 09/08/2022 | 01/06/2026 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ALMAR PLUMBING & HTG CORP | RELOCATION OF EXISITNG PLUMBING FIXTURES AND INSTALLATION OF NEW ( APPROXIMATELY 1,515 SF) NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION… |
| M00729758 ↗ | 447 WEST 162 STREET MANHATTAN | Alteration CO | Permit Issued | 05/13/2022 | 08/01/2024 | Design ANDREW FREDMAN ARCHITECT LLC Owner SURFACE DEVELOPMENT Contractor ZONE PLUMBING & HEATING C | RELOCATION AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS. |
| B00803142 ↗ | 1580 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 12/30/2022 | 04/06/2023 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor VILLAGE P & H NY INC | RELOCATION OF EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW (APPROXIMATELY 1,672 S.F.). NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B00803133 ↗ | 1580 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 01/01/2023 | 03/13/2023 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor CONSTRUCTION XPERT INC | INTERIOR RENOVATION & COMBINATION OF APARTMENT UNIT #17 & #18 TO CREATE NEW APARTMENT UNIT #13 (APPROXIMATEY1,672 S.F.). NO CHANGE IN USE, E… |
| B00803148 ↗ | 1588 PRESIDENT STREET BROOKLYN | Alteration | Filed — no permit on record | 12/30/2022 | — | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC | — |
| B00803157 ↗ | 1588 PRESIDENT STREET BROOKLYN | Alteration | Filed — no permit on record | 12/30/2022 | — | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC | — |
| M00785101 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 08/29/2022 | 11/17/2022 | Design ANDREW FREDMAN ARCHITECT LLC Owner ANSONIA ASSOCIATES LP Contractor ALMAR PLUMBING & HTG CORP | Relocation of plumbing fixtures and installation of new (approximately 1,080SF) no change in use, egress or occupancy under this application… |
| M08003153 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Permit Issued | 09/14/2022 | 09/16/2022 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ANSONIA CONDOMINIUM | INTERIOR RENOVATION OF APARTMENT 7-77 (APPROXIMATELY 1,515 S.F.)NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00784869 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 08/18/2022 | 08/24/2022 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ANSONIA CONDOMINIUM | INTERIOR RENOVATION OF APARTMENT 10-109 (APPROXIMATELY 1,095 S.F.) NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00719064 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Filed — no permit on record | 08/16/2022 | — | Design ANDREW FREDMAN ARCHITECT LLC | — |
| M00538097 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 06/23/2021 | 05/06/2022 | Design ANDREW FREDMAN ARCHITECT LLC Contractor SUPERB PLUMBING & HEATING | Replace, relocate and install new plumbing fixtures as per plans in Apartment 12-104. RELATED GC DOB NOW JOB #M00538078-I1. |
| B00602644 ↗ | 1452 CARROLL STREET BROOKLYN | Alteration | Signed-off | 10/01/2021 | 02/15/2022 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor VILLAGE P & H NY INC | Replace existing gas range @ existing location on 3rd floor, Apartment 3H. |
| M00587461 ↗ | 233 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 09/06/2021 | 09/30/2021 | Design ANDREW FREDMAN ARCHITECT LLC Owner VANGUARD INVESTORS LTD Contractor ZAF CORPORATION | INTERIOR RENOVATION OF APARTMENT 7E AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00538078 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 06/23/2021 | 08/10/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor FOSTER RENOVATION CORP | INTERIOR RENOVATIONS TO APARTMENT 12-104 AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF THE BUILDING. RELATED PL DOB NOW JOB #M005… |
| B00528010 ↗ | 1437 CARROLL STREET BROOKLYN | Alteration | Signed-off | 06/01/2021 | 06/24/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor VILLAGE P & H NY INC | INSTALLATION OF NEW LAV AND WC IN CELLAR. RELOCATION OF BATHTUB, LAV, WC, KITCHEN SINK @ 1ST FLOOR. NEW ELECTRIC RANGE @ 1ST FLOOR IN PLAC… |
| B00526951 ↗ | 1437 CARROLL STREET BROOKLYN | Alteration | Signed-off | 06/01/2021 | 06/21/2021 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor CONSTRUCTION XPERT INC | CREATION OF NEWLY RENOVATED APARTMENT 1G, WHICH IS MADE BY COMBINING APARTMENT 1F & PART OF CELLAR ACCESSORY USE SPACE. WORK INCLUDES DEMOL… |
| B00532471 ↗ | 1452 CARROLL STREET BROOKLYN | Alteration | Signed-off | 06/02/2021 | 06/15/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor VILLAGE P & H NY INC | REMOVE, RELOCATE, AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS. |
| B00532245 ↗ | 1452 CARROLL STREET BROOKLYN | Alteration | Signed-off | 06/02/2021 | 06/14/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor CONSTRUCTION XPERT INC | CREATION OF NEWLY RENOVATED APARTMENT 3H, WHICH IS MADE BY COMBINING APARTMENTS 3B AND 4B WITH A CONVENIENCE STAIR. WORK INCLUDES DEMOLITIO… |
| M00466686 ↗ | 160 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 03/31/2021 | 06/11/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor ZAF CORPORATION | INTERIOR RENOVATION TO INCLUDE LIMITED DEMOLITION, CARPENTRY, CABINETRY, DRYWALL, PLUMBING, ELECTRICAL AND FINISH WORK. NO CHANGE TO EGRESS … |
| B00486864 ↗ | 1581 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 04/05/2021 | 05/10/2021 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor CONSTRUCTION XPERT INC | Interior alteration at Apartment 12. Installation of new ramp into kitchen from hallway, relocation of refrigerator. |
| M00357105 ↗ | 443 EAST 88 STREET MANHATTAN | Alteration | Signed-off | 07/07/2020 | 03/23/2021 | Design ANDREW FREDMAN ARCHITECT LLC Contractor DPH PLUMBING & HTG CORP | removal of gas stove and line |
| M00437315 ↗ | 34 WEST 72 STREET MANHATTAN | Alteration | Filed — no permit on record | 02/16/2021 | — | Design ANDREW FREDMAN ARCHITECT LLC | — |
| B00401361 ↗ | 1437 CARROLL STREET BROOKLYN | Alteration | Signed-off | 09/18/2020 | 12/08/2020 | Design ANDREW FREDMAN ARCHITECT LLC Contractor VILLAGE P & H NY INC | Replacing new WC & Lav @ existing locations @ 2nd floor bathroom, installing new shower in place of bath @ 2nd floor bathroom, relocating ex… |
| B00371814 ↗ | 1460 CARROLL STREET BROOKLYN | Alteration | Signed-off | 07/17/2020 | 12/07/2020 | Design ANDREW FREDMAN ARCHITECT LLC Owner MDAYS REALTY LLC Contractor VILLAGE P & H NY INC | LEGAL COMBINATION OR UNITS 2E & 2F TO CREATE APARTMENT 2R. NEW PLUMBING FIXTURES TO BE INSTALLED AS SHOWN ON PLANS. |
| M00257910 ↗ | 320 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 11/20/2019 | 12/16/2019 | Design ANDREW FREDMAN ARCHITECT LLC Owner KYROUS REALTY GROUP Contractor ORBIT PLBG & HTG INC | REMOVAL OF EXISTING KITCHEN INCLUDING SINK AND HOT WATER HEATER AND CAPPING OF GAS RANGE. ALSO INCLUDES INTRODUCTION OF WASHING MACHINE AND … |
| Building | Filings | Most Recent |
|---|---|---|
| 2101 BROADWAY ATRIUM ↗ | 14 | 08/24/2023 |
| 447 WEST 162 STREET ↗ | 1 | 06/29/2023 |
| 1580 PRESIDENT STREET ↗ | 2 | 01/01/2023 |
| 1588 PRESIDENT STREET ↗ | 3 | 12/30/2022 |
| 1452 CARROLL STREET ↗ | 5 | 04/11/2022 |
| 1437 CARROLL STREET ↗ | 4 | 09/27/2021 |
| 233 WEST 26 STREET ↗ | 1 | 09/06/2021 |
| 1581 PRESIDENT STREET ↗ | 1 | 04/05/2021 |
| 160 WEST END AVENUE ↗ | 1 | 03/31/2021 |
| 34 WEST 72 STREET ↗ | 1 | 02/16/2021 |
| 1460 CARROLL STREET ↗ | 2 | 08/12/2020 |
| 443 EAST 88 STREET ↗ | 1 | 07/07/2020 |
| 320 WEST 84 STREET ↗ | 1 | 11/20/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/25/2023 | Energy Code Compliance Inspections | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 08/25/2023 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 08/24/2023 | Energy Code Compliance Inspections | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 08/24/2023 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 08/08/2023 | Energy Code Compliance Inspections | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 08/08/2023 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 12/22/2022 | Tenant Protection Plan Compliance | 1588 PRESIDENT STREET | ALEKSANDR LEVIN | special |
| 12/21/2022 | Fire-Resistant Penetrations and Joints | 1580 PRESIDENT STREET | Andrew Fredman | special |
| 12/21/2022 | Tenant Protection Plan Compliance | 1580 PRESIDENT STREET | ALEKSANDR LEVIN | special |
| 12/21/2022 | Fire-Resistance Rated Construction | 1588 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Tenant Protection Plan Compliance | 1588 PRESIDENT STREET | ALEKSANDR LEVIN | special |
| 12/21/2022 | Fire-Resistant Penetrations and Joints | 1588 PRESIDENT STREET | Andrew Fredman | special |
| 12/21/2022 | Structural Stability – Alterations of existing buildings | 1588 PRESIDENT STREET | Andrew Fredman | special |
| 12/21/2022 | Final | 1588 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Lighting in dwelling units | 1588 PRESIDENT STREET | Andrew Fredman | energy_progress |
| 12/21/2022 | Structural Wood Frame | 1588 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Energy Code Compliance Inspections | 1588 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Fire-Resistant Penetrations and Joints | 1588 PRESIDENT STREET | Andrew Fredman | special |
| 12/21/2022 | Fire-Resistant Penetrations and Joints | 1580 PRESIDENT STREET | Andrew Fredman | special |
| 12/21/2022 | Tenant Protection Plan Compliance | 1580 PRESIDENT STREET | ALEKSANDR LEVIN | special |
| 12/21/2022 | Energy Code Compliance Inspections | 1580 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Fire-Resistance Rated Construction | 1580 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Final | 1580 PRESIDENT STREET | Andrew Fredman | progress |
| 12/21/2022 | Lighting in dwelling units | 1580 PRESIDENT STREET | Andrew Fredman | energy_progress |
| 09/13/2022 | Fire-Resistance Rated Construction | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 09/13/2022 | Final | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 09/13/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 06/02/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 05/31/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 05/10/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 04/15/2022 | Metering | 2101 BROADWAY ATRIUM | Andrew Fredman | energy_progress |
| 04/15/2022 | Lighting in dwelling units | 2101 BROADWAY ATRIUM | Andrew Fredman | energy_progress |
| 04/14/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 04/14/2022 | Structural Stability – Alterations of existing buildings | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 04/14/2022 | Fire-Resistance Rated Construction | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 04/14/2022 | Final | 2101 BROADWAY ATRIUM | Andrew Fredman | progress |
| 04/12/2022 | Fire-Resistant Penetrations and Joints | 1452 CARROLL STREET | Andrew Fredman | special |
| 04/01/2022 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 03/31/2022 | Fire-Resistant Penetrations and Joints | 1452 CARROLL STREET | Andrew Fredman | special |
| 03/07/2022 | Fire-Resistant Penetrations and Joints | 1452 CARROLL STREET | Andrew Fredman | special |
| 10/05/2021 | Fire-Resistant Penetrations and Joints | 2101 BROADWAY ATRIUM | Andrew Fredman | special |
| 09/29/2021 | Lighting in dwelling units | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Fenestration and door U-factor and product ratings | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Insulation placement and R values | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Fenestration areas | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Fenestration air leakage | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Air barrier - visual inspection | 1437 CARROLL STREET | Andrew Fredman | energy_progress |
| 09/29/2021 | Energy Code Compliance Inspections | 1437 CARROLL STREET | Andrew Fredman | progress |
| 09/29/2021 | Final | 1437 CARROLL STREET | Andrew Fredman | progress |
| 09/29/2021 | Structural Wood Frame | 1437 CARROLL STREET | Andrew Fredman | progress |