← Back
Elevator apt, fireproof with stores
One Sunset
737 4TH AVENUE · BIN 3429685
💬 Discuss this project
2024Year Built
14.5Stories
D6Building Class
R8AZoning
183,272 sfGross Floor Area
189Units
0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 745 4TH AVENUE, LLC · 20,034 sf lot · 9.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction180p · 4 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 14Under Construction153p · 1 filing · 20 docs
Floor 13Under Construction152p · 1 filing · 20 docs
Floor 12Under Construction152p · 1 filing · 20 docs
Floor 11Under Construction152p · 1 filing · 20 docs
Floor 10Under Construction154p · 1 filing · 20 docs
Floor 9Under Construction152p · 1 filing · 20 docs
Floor 8Under Construction151p · 2 filings · 20 docs
Floor 7Under Construction156p · 2 filings · 20 docs
Floor 6Under Construction154p · 2 filings · 20 docs
Floor 5Under Construction152p · 2 filings · 20 docs
Floor 4Under Construction154p · 3 filings · 20 docs
Floor 3Under Construction150p · 2 filings · 20 docs
Floor 2Under Construction455p · 2 filings · 20 docs
Floor 1Under Construction459p · 2 filings · 20 docs
CellarUnder Construction451p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEB CAPITAL8707/08/2026
MOORE GROUP907/08/2026
PLATINUM SERVICES NY3507/08/2026
NORTHEAST SPECIALIST GROUP LLC1103/22/2026
745 4TH AVENUE, LLC103/22/2026
CM AND ASSOCIATES CONSTRU203/22/2026
CM AND ASSOCIATES CONST303/22/2026
737 4TH AVE. LLC103/22/2026
731 4 AVE403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2018$7.2M—Private party → 737 4TH AVENUE, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST SERVICE INTERIORS203/21/2026
DVA Advisors3003/21/2026
HIERARCH-E403/21/2026
WILLIAM VITACCO ASSOCIATES103/21/2026
DOMANI CONSULTING803/21/2026
PATUXENT ENGINEERING1403/21/2026
KD DESIGNS703/21/2026
PLATINUM SERVICES NY403/21/2026
LOMBARDO BUILDING CONSULTANTS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM AND ASSOCIATES CONSTGeneral Contractor3907/08/2026
TT MECHANICAL CORPPlumbing1807/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1307/08/2026
BUNLIN LLCGeneral Contractor1007/08/2026
ADVANCED FACADE SOLUTION*General Contractor807/08/2026
TTM GROUP CORPFire Protection507/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor403/21/2026
MOORE GROUP CORPORATIONGeneral Contractor307/08/2026
NEW LINE STRUCTURES & DEVGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432406/29/2026
FRANK SETA & ASSOCIATES3095506/29/2026
LEO Y LEE ASSOCIATES2481107/02/2024
LANGAN ENG, ENV, SURVEYIN1265605/09/2024
ROSENWASSER/GROSSMAN111505/09/2024
Building Lifecycle
All (294)Filed (66)Permit Issued (63)Signed Off (8)Violation (13)Inspection (31)Objection (80)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
07/28/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Insulation placement and R values
Zoltan Saro
07/28/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Zoltan Saro
07/28/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
Zoltan Saro
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Fenestration air leakage
Zoltan Saro
07/28/2026
Special inspection requirement — Vestibules
Zoltan Saro
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Zoltan Saro
07/28/2026
Special inspection requirement — Fenestration areas
Zoltan Saro
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Zoltan Saro
07/28/2026
Special inspection requirement — Air barrier - visual inspection
Zoltan Saro
06/29/2026
Filed — New Building
Installation of temporary standpipe system.
B00580365-B5
06/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/24/2026
Special inspection requirement — Air barrier - visual inspection
Zoltan Saro
06/24/2026
Special inspection requirement — Fenestration areas
Zoltan Saro
06/24/2026
Special inspection requirement — Vestibules
Zoltan Saro
06/24/2026
Special inspection requirement — Insulation placement and R values
Zoltan Saro
06/24/2026
Special inspection requirement — Protection of exposed foundation insulation
Zoltan Saro
06/24/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Fenestration air leakage
Zoltan Saro
06/24/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Zoltan Saro
06/24/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Zoltan Saro
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Zoltan Saro
06/09/2026
Permit issued — Sprinklers
B00580365-S7-EW-SP
06/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095940-P2
03/24/2026
Permit issued — Supported Scaffold
B01095940-I1-SF
03/18/2026
Permit issued — General Construction
B00580365-I1-GC
03/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2026
Permit issued — Construction Fence
B00884552-I1-FN
02/06/2026
Signed off — Alteration
INSTALLATION OF 2 POINT SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095950-I1
02/06/2026
Permit issued — Suspended Scaffold
B01095950-I1-SC
02/05/2026
Signed off — Alteration
INSTALLATION OF 2 POINT SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095950-S1
02/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/23/2026
Permit issued — Suspended Scaffold
B01095950-S1-SC
01/16/2026
Signed off — Alteration
Application for the installation and use of mobile equipment (including mini-cranes) at 201 25th Street, BK (AKA 737 4th Avenue, BK) as per plans filed herein. No change in egress, use, or occupancy.
B01071472-I1
01/14/2026
Permit issued — Standpipe
B00580365-Z2-EW-SD
01/07/2026
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01018577-S1
12/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Signed off — New Building
Installation of temporary standpipe system.
B00580365-S8
11/20/2025
Signed off — New Building
Installation of temporary standpipe system.
B00580365-S6
11/20/2025
Objection resolved — Addressed
11/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/18/2025
Permit issued — General Construction
B00580365-I1-GC
11/17/2025
Objection raised — Other
10/23/2025
Filed — New Building
Installation of temporary standpipe system.
B00580365-B3
10/23/2025
Signed off — New Building
Installation of temporary standpipe system.
B00580365-S2
Latest 60 of 294 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTTM GROUP CORP06/09/2026
DOB NOWSupported ScaffoldPermit IssuedBUNLIN LLC03/24/2026
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH03/18/2026
DOB NOWConstruction FencePermit IssuedCHRISTOPHER B. MESBAH02/12/2026
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC02/06/2026
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC01/23/2026
DOB NOWStandpipePermit IssuedTT MECHANICAL CORP01/14/2026
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH11/18/2025
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH08/05/2025
DOB NOWSuspended ScaffoldPermit IssuedADVANCED FACADE SOLUTION*06/27/2025
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH06/04/2025
DOB NOWGeneral ConstructionSigned-offCHRISTOPHER B. MESBAH06/02/2025
DOB NOWMechanical SystemsSigned-offCHRISTOPHER B. MESBAH05/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offADVANCED FACADE SOLUTION*04/23/2025
DOB NOWSuspended ScaffoldPermit IssuedADVANCED FACADE SOLUTION*04/23/2025
DOB NOWStandpipePermit IssuedTTM GROUP CORP04/10/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/01/2025
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC04/01/2025
DOB NOWSprinklersPermit IssuedTT MECHANICAL CORP02/27/2025
DOB NOWConstruction FencePermit IssuedCHRISTOPHER B. MESBAH02/21/2025
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH02/21/2025
DOB NOWStandpipePermit IssuedTT MECHANICAL CORP01/16/2025
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP01/14/2025
DOB NOWSupported ScaffoldPermit IssuedBUNLIN LLC12/30/2024
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC12/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC12/23/2024
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC11/13/2024
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC08/14/2024
DOB NOWSupported ScaffoldPermit IssuedBUNLIN LLC08/14/2024
DOB NOWStandpipePermit IssuedTT MECHANICAL CORP07/31/2024
DOB NOWSprinklersPermit IssuedTT MECHANICAL CORP07/30/2024
DOB NOWStandpipePermit IssuedTTM GROUP CORP07/26/2024
DOB NOWStandpipePermit IssuedTTM GROUP CORP07/26/2024
DOB NOWStructuralSigned-offCHRISTOPHER B. MESBAH07/23/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedMOORE GROUP CORPORATION07/18/2024
DOB NOWSuspended ScaffoldPermit IssuedADVANCED FACADE SOLUTION*07/18/2024
DOB NOWGeneral ConstructionPermit IssuedCHRISTOPHER B. MESBAH07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offADVANCED FACADE SOLUTION*06/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedMOORE GROUP CORPORATION06/24/2024
DOB NOWConstruction FencePermit IssuedCHRISTOPHER B. MESBAH06/04/2024
+ 26 more permits on file
1 project · most recent 06/29/2026
Air Conditioning Systems Associated Ducts and Piping Cooling Towers Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Permit IssuedCM AND ASSOCIATES CONSTAir Conditioning Systems, Associated Ducts and Piping, Cooling Towers, Heating Systems
Cooling
Samsung AM018NNNDCH/AA 1 tons · Vrf Indoor ×25
AM096BXVGFH/AA 14 tons · Vrf Outdoor ×20
AM007NNNDCH/AA 1 tons · Vrf Indoor ×10
AM012NNNDCH/AA 1 tons · Vrf Indoor ×10
AM048BN4PCH/AA 4 tons · Vrf Indoor ×10
AM072BXVGFH/AA 6 tons · Vrf Outdoor ×10
AC018BXADCH/AA 1 tons · Vrf Indoor ×5
AC024BXADCH/AA 2 tons · Vrf Indoor ×5
AM024FNLDCH/AA 2 tons · Vrf Indoor ×5
AM024NNNDCH/AA 1 tons · Vrf Indoor ×5
AM072BXVGFH/44 6 tons · Vrf Outdoor ×5
AM072BXVGGH/AA 6 tons · Vrf Outdoor ×5
Mitsubishi Electric PUMY 60,000 BTU · Condensing Unit ×6
PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×6
PEFY-48NHMU-E 4 tons · Vrf Indoor ×2
Aaon RN-015-8-0-K60E-13A 4,000 CFM · Rooftop Unit ×5
RN-016-8-0-EA09-34B 178,000 BTU · Rooftop Unit ×1
Climatemaster TC-012 1 tons · Wshp ×6
TC-024 2 tons · Wshp ×2
TC-015 1 tons · Wshp ×1
TC-030 3 tons · Wshp ×1
TCLV-096 8 tons · Wshp ×1
Heating
Polaris A55SE-IS10-179-TMTL71 1 kW · Heat Exchanger ×12
Ventilation
Renewaire HE-2XINH 2,000 CFM · Erv ×6
Ducts & Piping
N/A n/a 1 kW · Ductwork ×6
Cooling Tower
Baltimore Aircoil S15E-1285-06JN 1 kW · Cooling Tower ×1
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Permit IssuedTTM GROUP CORPSprinkler System
1 project · most recent 06/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Permit IssuedTTM GROUP CORPGas, Storm, Water/Sanitary
5 projects · most recent 10/09/2025
General Wiring
FiledStatusContractorScope
10/09/2025Permit IssuedOPTIMAL ELECTRIC, INC2 meters, 2 new_meters
09/03/2025CompleteJAM ELECTRICAL CORP—
03/13/2025Permit IssuedOPTIMAL ELECTRIC, INCGeneral Wiring
12/25/2023CompleteILLUMINOUS ELECTRIC CORP.—
08/01/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026Permit IssuedTTM GROUP CORPSteel, Concrete, Masonry
5 projects · most recent 04/09/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
04/09/2026Permit IssuedBUNLIN LLCScaffold
08/20/2025Permit IssuedPLATINUM SERVICES NY LLCFence, Sidewalk Shed
02/21/2024Permit IssuedCM AND ASSOCIATES CONSTFence
10/20/2022Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
02/24/2022Permit IssuedNORTHEAST SPECIALIST GROUFence
1 project · most recent 07/02/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/02/2024Permit IssuedADVANCED FACADE SOLUTION*Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
06/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2026Pass-Final PL - UndergroundPassView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/07/2026Pass-Final SD - Up to 3 Requested FloorsPassView ↗
12/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/12/2025Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/08/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/26/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/13/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/28/2026VestibulesZoltan Saroenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsZoltan Saroenergy_progress
07/28/2026Fenestration air leakageZoltan Saroenergy_progress
07/28/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
07/28/2026Energy Code Compliance InspectionsZoltan Saroprogress
07/28/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/28/2026Wall Panels, Curtain Walls, and VeneersZoltan Sarospecial
07/28/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
07/28/2026Protection of exposed foundation insulationZoltan Saroenergy_progress
07/28/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
07/28/2026Air barrier - visual inspectionZoltan Saroenergy_progress
07/28/2026Insulation placement and R valuesZoltan Saroenergy_progress
07/28/2026Fenestration areasZoltan Saroenergy_progress
06/24/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
06/24/2026Wall Panels, Curtain Walls, and VeneersZoltan Sarospecial
06/24/2026Energy Code Compliance InspectionsZoltan Saroprogress
06/24/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
06/24/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
06/24/2026Protection of exposed foundation insulationZoltan Saroenergy_progress
06/24/2026Fenestration air leakageZoltan Saroenergy_progress
06/24/2026Fenestration and door U-factor and product ratingsZoltan Saroenergy_progress
06/24/2026VestibulesZoltan Saroenergy_progress
06/24/2026Fenestration areasZoltan Saroenergy_progress
06/24/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/24/2026Insulation placement and R valuesZoltan Saroenergy_progress
Latest 25 of 150.
▾Documents — 395 on file (BIS + DOB NOW)
▸Plans & Drawings66
▸DOB NOWPlans/Sketch66
09/01/2026B00580365-P8Request digital key ↗
09/01/2026B00580365-B4Request digital key ↗
09/01/2026B00580365-A9Request digital key ↗
Showing 3 of 66 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION6
06/14/2018321752689Open ↗
06/06/2018321752689Open ↗
12/26/2012320542052Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
01/06/2022340827886Open ↗
06/05/2018321752689Open ↗
05/29/2018321722828Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/20/2024340827886Open ↗
01/06/2022340827886Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/02/2018321752689Open ↗
▸Zoning, Tax Lot & Property Records45
▸DOB NOWRestrictive Declaration/Easement 130
09/01/2026B00580365-B5Open ↗
Showing 1 of 30 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 32
09/01/2026B00580365-B5Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
09/01/2026B00580365-B5Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications170
▸DOB NOWProgress Inspector Seal & Signature64
09/23/2026B00580365-P7Open ↗
09/23/2026B00580365-P7Open ↗
09/23/2026B00580365-P7Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature60
09/01/2026B00580365-A7Open ↗
09/01/2026B00580365-A3Open ↗
09/01/2026B00580365-Z2Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
09/23/2026B00580365-P7Open ↗
09/23/2026B00580365-P7Open ↗
09/23/2026B00580365-P7Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/20/2018321722828Open ↗
05/29/2018321722828Open ↗
09/21/2012320542052Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/06/2022340827886Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/21/2012320542052Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/21/2012320542052Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
09/21/2012320542052Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/07/2018321752689Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
09/01/2026B00580365-B5Open ↗
09/01/2026B00580365-A6Open ↗
Showing 2 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/06/2022340827886Open ↗
▸BISSTREET TREE CHECKLIST1
05/10/2023340827886Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/05/2018321752689Open ↗
05/29/2018321722828Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/10/2023340827886Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/06/2022340827886Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
09/21/2012320542052Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/07/2018321752689Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/29/2018321722828Open ↗
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
05/29/2018321722828Open ↗
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸BISADDITIONAL INFORMATION2
05/11/2023340827886Open ↗
05/10/2023340827886Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/06/2022340827886Open ↗
▸Other Documents32
▸DOB NOWProperty Ownership Certification6
09/01/2026B00580365-A6Open ↗
09/01/2026B00580365-B5Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWCalculations6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/23/2018321722828Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/10/2023340827886Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type