| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01454447 ↗ | 90-15 QUEENS BOULEVARD QUEENS | — | Permit Issued | — | 09/28/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A SPRINKLER SYSTEM AT GARAGE CLOTHING STORE LOCATED ON THE 2ND FLOOR AT QCM, AS PER PLANS SUBMITTED HEREWITH NO CHANGE IN U… |
| Q01456891 ↗ | 90-15 QUEENS BOULEVARD QUEENS | — | Permit Issued | — | 09/10/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 3RD FLOOR AT JD SPORTS STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS O… |
| Q01434508 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 07/22/2026 | 07/23/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND AND 3RD FLOOR SPACE 2054 AT QUEEN CENTER MALL, AS PER PLANS SUBMITTED HEREWITH, NO C… |
| Q01431548 ↗ | 37-02 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 07/17/2026 | 07/20/2026 | Design LEVIN ENGINEERING PLLC Owner 230 SARATOGA REALTY LLC Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AT WELLS FARGO RETAIL BRANCH AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN U… |
| M01420505 ↗ | 1000 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/29/2026 | 07/01/2026 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY SPRINKLER PROTECTION SYSTEM ON CELLAR LEVEL AT THE MET PARKING 2 STAIR AS PER PLANS SUBMITTED HEREWITH, NO CHANG… |
| B01133631 ↗ | 700 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 11/12/2024 | 05/26/2026 | Design TAL IRIS SHEMESH ,ARCHITECT Contractor ADVANCED PLUMBING MECH | PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF UNIT # 608 & 609 TO MERGE (2) APARTMENTS INTO (1). |
| Person | Filings | Most recent |
|---|---|---|
| WILDE MARTINEZ | 53 | 09/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LEVIN ENGINEERING PLLC | 28 | 07/22/2026 |
| TAL IRIS SHEMESH ,ARCHITECT | 5 | 01/20/2026 |
| AZ PROFESSIONAL ENGINEERING PC | 3 | 08/28/2025 |
| ZPROEKT | 2 | 04/02/2025 |
| AFM INSPECTIONS & ENGINEERING, PLLC | 1 | 10/16/2025 |
| AMINOV DESIGN ENGINEER, PC | 1 | 08/28/2025 |
| GK+A ARCHITECTS, PC | 1 | 02/24/2022 |
| MARK AMINOV, PE | 1 | 08/28/2025 |
| NEW YORK ENGINEERS LLC | 1 | 10/22/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SIRINA FIRE PROT CORP | 28 | 07/22/2026 |
| ADVANCED PLUMBING MECH | 1 | 01/20/2026 |
| AL PLUMBING & CONT. INC | 1 | 01/21/2025 |
| CAPITOL FIRE SPRINKLER CO | 1 | 05/31/2024 |
| CLEARCUT GROUP CORP | 1 | 01/20/2026 |
| EJ HOMES 45 LLC | 1 | 08/28/2025 |
| FIRST CNSTRCTION ZONE INC | 1 | 04/02/2025 |
| G BUILDERS MANAGEMENT INC | 1 | 01/17/2024 |
| GREGG NY PLUMBING, INC | 1 | 08/28/2025 |
| JB BUZCO PLUMBING LLC | 1 | 02/24/2022 |
| SB RENOVATION & MODELING | 1 | 08/28/2025 |
| TCS CONSTRUCTION CORP | 1 | 01/14/2025 |
| ZPROEKT | 1 | 09/22/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| MACERICH | 14 | 07/22/2026 |
| NAFTALI GROUP | 2 | 04/02/2025 |
| PUBLIC STORAGE | 2 | 05/31/2024 |
| 230 SARATOGA REALTY LLC | 1 | 07/17/2026 |
| CHAYALAS MIKVA INC | 1 | 01/14/2025 |
| EXTELL DEVELOPMENT | 1 | 08/22/2025 |
| GOLDMAN SACHS & CO. | 1 | 08/11/2023 |
| LIVWRK | 1 | 02/21/2023 |
| PERGAMENT MALL OF SI, LLC | 1 | 01/15/2024 |
| QUEENS BALLPARK COMPANY | 1 | 06/21/2023 |
| RICHMOND UNIVERSITY MEDICAL CENTER | 1 | 07/19/2021 |
| STONEHENGE MANAGEMENT LLC | 1 | 02/24/2022 |
| THE METROPOLITAN MUSEUM OF ART | 1 | 06/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| A & D BUILDING SOLUTIONS | 1 | 08/28/2025 |
| HOMES R US SALES CORP | 1 | 08/28/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01454447 ↗ | 90-15 QUEENS BOULEVARD QUEENS | — | Permit Issued | — | 09/28/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A SPRINKLER SYSTEM AT GARAGE CLOTHING STORE LOCATED ON THE 2ND FLOOR AT QCM, AS PER PLANS SUBMITTED HEREWITH NO CHANGE IN U… |
| Q01456891 ↗ | 90-15 QUEENS BOULEVARD QUEENS | — | Permit Issued | — | 09/10/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 3RD FLOOR AT JD SPORTS STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS O… |
| Q01434508 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 07/22/2026 | 07/23/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND AND 3RD FLOOR SPACE 2054 AT QUEEN CENTER MALL, AS PER PLANS SUBMITTED HEREWITH, NO C… |
| Q01431548 ↗ | 37-02 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 07/17/2026 | 07/20/2026 | Design LEVIN ENGINEERING PLLC Owner 230 SARATOGA REALTY LLC Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AT WELLS FARGO RETAIL BRANCH AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN U… |
| M01420505 ↗ | 1000 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/29/2026 | 07/01/2026 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY SPRINKLER PROTECTION SYSTEM ON CELLAR LEVEL AT THE MET PARKING 2 STAIR AS PER PLANS SUBMITTED HEREWITH, NO CHANG… |
| B01133631 ↗ | 700 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 11/12/2024 | 05/26/2026 | Design TAL IRIS SHEMESH ,ARCHITECT Contractor ADVANCED PLUMBING MECH | PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF UNIT # 608 & 609 TO MERGE (2) APARTMENTS INTO (1). |
| M01148357 ↗ | 1150 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 01/14/2025 | 04/09/2026 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY AIR-PRESSURIZED STANDPIPE SYSTEM AT THE COLUMBIA UNIVERSITY - BERRIE MEDICAL SCIENCE EXPANSION AS PER PLANS SUBM… |
| Q01019235 ↗ | 110-11 69 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/21/2024 | 03/23/2026 | Design MARK AMINOV, PE Contractor SB RENOVATION & MODELING | SUBSEQUENT FOUNDATION WORK TYPE FILED IN CONJUNCTION WITH HORIZONTAL AND VERTICAL EXTENSION OF BUILDING AS FILED UNDER DOB # Q01019235-I1 |
| Q01353363 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/30/2026 | 02/02/2026 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND FLOOR AT APPLE TEMPORARY STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EG… |
| B00914984 ↗ | 340 EAST 52 STREET BROOKLYN | Alteration | Permit Issued | 01/21/2024 | 12/02/2025 | Design TAL IRIS SHEMESH ,ARCHITECT Owner CHAYALAS MIKVA INC Contractor TCS CONSTRUCTION CORP | PROPOSED HORIZONTAL EXTENSION AT 1ST FLOOR OF TWO STORIES AND CELLAR DWELLING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. |
| M01122474 ↗ | 425 EAST 66 STREET MANHATTAN | Alteration | Permit Issued | 10/24/2024 | 10/16/2025 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY DRY SPRINKLER LOOP ON THE CELLAR AND SUB-CELLAR LEVEL AT MSKCC PHASE 2, AS PER PLANS SUBMITTED HEREWITH, NO CHAN… |
| Q01283141 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/11/2025 | 09/12/2025 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AT SAMSUNG STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS O… |
| M01157938 ↗ | 653 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 12/20/2024 | 08/25/2025 | Design LEVIN ENGINEERING PLLC Owner EXTELL DEVELOPMENT Contractor SIRINA FIRE PROT CORP | MODIFICATION OF THE EXISTING AIR-PRESSURIZED SPRINKLER SYSTEM DURING ENTIRE BUILDING DEMOLITION ON THE 1ST FLOOR AS PER PLANS SUBMITTED HERE… |
| B01191919 ↗ | 363 4 AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/02/2025 | 06/25/2025 | Design ZPROEKT Owner NAFTALI GROUP Contractor FIRST CNSTRCTION ZONE | MINOR GENERAL CONSTRUCTION WORK FOR RETAIL SPACE ADDITION TO EXISTING DAYCARE AND CHANGE OF USE FROM RETAIL TO DAYCARE GETTING A NEW CERTIFI… |
| Q00970728 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/17/2024 | 06/18/2025 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 3RD FLOOR AT BOX LUNCH AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCU… |
| B00757314 ↗ | 1234 CARROLL STREET BROOKLYN | Alteration | Signed-off | 06/23/2022 | 05/05/2025 | Design TAL IRIS SHEMESH ,ARCHITECT Contractor AL PLUMBING & CONT. INC | PLUMBING PLANS FILED HEREWITH IN CONJUNCTION WITH ALT-1 322030299. |
| Q01152734 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 12/09/2024 | 02/21/2025 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND FLOOR AT PSYCHO BUNNY STORE, AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRE… |
| B01174974 ↗ | 1095 UNION STREET BROOKLYN | Alteration | Filed — no permit on record | 02/07/2025 | — | Design TAL IRIS SHEMESH ,ARCHITECT | — |
| M01077626 ↗ | 232 AVENUE B MANHATTAN | Alteration | Filed — no permit on record | 10/22/2024 | — | Design NEW YORK ENGINEERS LLC | — |
| M01056039 ↗ | 217 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 10/03/2024 | 10/04/2024 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY EGRESS SPRINKLER SYSTEM ON THE 5TH FLOOR AT IATSE, AS PER PLAN S SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR… |
| Q01054121 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/17/2024 | 06/18/2024 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE CELLAR AND FIRST FLOOR AT H & M STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE,… |
| Q00351691 ↗ | 32-04 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 05/27/2020 | 06/17/2024 | Design LEVIN ENGINEERING PLLC Owner PUBLIC STORAGE Contractor CAPITOL FIRE SPRINKLER CO | New installation of Sprinkler and Standpipe system for Cellar , 01st to 12th floor and Roof. |
| B00787360 ↗ | 1596 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 09/12/2022 | 04/16/2024 | Design TAL IRIS SHEMESH ,ARCHITECT Contractor G BUILDERS MANAGEMENT INC | SUBSEQUENT STRUCTURAL WORK TYPE FOR EXISTING (1) ONE FAMILY ON EXISTING (3) THREE STORIES& CELLAR WITH HORIZONTAL ENLARGEMENT PROPOSED FOR T… |
| Q00997598 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 02/13/2024 | 02/14/2024 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND FLOOR AT GAP FACTORY OUTLET AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRES… |
| Q00769964 ↗ | 32-04 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 12/29/2022 | 01/24/2024 | Design LEVIN ENGINEERING PLLC Owner PUBLIC STORAGE Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY AIR PRESSURIZED SUPERVISED TEMPORARY STANDPIPE SYSTEM AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS … |
| S08046966 ↗ | 2795 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 01/15/2024 | 01/16/2024 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 1ST FLOOR AT STOP & SHOP STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS… |
| B00897744 ↗ | 363 4 AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/06/2023 | 08/30/2023 | Design ZPROEKT Owner NAFTALI GROUP Contractor ZPROEKT | NO WORK TO BE DONE, THIS FILING IS TO CHANGE THE CERTIFICATE OF OCCUPANCY, CHANGING GROUP USE ON THE FIRST FLOOR TO THE DAYCARE FACILITY ONL… |
| M00823198 ↗ | 200 WEST STREET MANHATTAN | Alteration | Signed-off | 08/11/2023 | 08/11/2023 | Design LEVIN ENGINEERING PLLC Owner GOLDMAN SACHS & CO. Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN SPRINKLER SYSTEM ON THE 1ST FLOOR AT GOLDMAN SACHS AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY… |
| Q00892766 ↗ | 123-01 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 06/21/2023 | 06/22/2023 | Design LEVIN ENGINEERING PLLC Owner QUEENS BALLPARK COMPANY Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 1ST AND 2ND FLOOR AT THE CITI FIELD STADIUM AS PER PLANS SUBMITTED HEREWITH, NO CHANGE I… |
| Q00863674 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 05/23/2023 | 05/31/2023 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER AND STANDPIPE SYSTEM ON THE CELLAR AND FIRST FLOOR AT PRIMARK STORE AS PER PLANS SUBMITTED HEREWITH, N… |
| Q00852633 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 04/14/2023 | 04/14/2023 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 2ND FLOOR AT VICTORIA'S SECRET STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, … |
| Q08049619 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 03/15/2023 | 03/15/2023 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AT T-MOBILE STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS … |
| B00795372 ↗ | 95 YORK STREET BROOKLYN | Alteration | Signed-off | 10/27/2022 | 02/25/2023 | Design LEVIN ENGINEERING PLLC Owner LIVWRK Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A SPRINKLER SYSTEM AT CVS PHARMACY AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. |
| M00810662 ↗ | 611 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/11/2023 | 02/22/2023 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE 6TH FLOOR AT ZEGNAS STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR O… |
| Q00660840 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 03/15/2022 | 03/16/2022 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE SECOND FLOOR AT COTTON ON STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRES… |
| Q00669656 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 03/15/2022 | 03/16/2022 | Design LEVIN ENGINEERING PLLC Owner MACERICH Contractor SIRINA FIRE PROT CORP | MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE THIRD FLOOR AT COTTON ON KIDS STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, E… |
| M00631121 ↗ | 103 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 11/18/2021 | 12/10/2021 | Design GK+A ARCHITECTS, PC Contractor JB BUZCO PLUMBING LLC | PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION AT DAN & JOHN'S WINGS LOCATED ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE I… |
| S00536515 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Signed-off | 07/19/2021 | 07/20/2021 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | RELOCATION OF EXISTING CONCEALED TO UPRIGHTS SPRINKLERS HEADS TO CREATE A TEMPORARY SPRINKLER EGRESS PROTECTION SYSTEM. AS PER PLANS SUBMITT… |
| Building | Filings | Most Recent |
|---|---|---|
| 90-15 QUEENS BOULEVARD ↗ | 14 | 07/21/2026 |
| 37-02 JUNCTION BOULEVARD ↗ | 1 | 07/15/2026 |
| 1000 5 AVENUE ↗ | 1 | 06/22/2026 |
| 700 PACIFIC STREET ↗ | 3 | 01/20/2026 |
| 1095 UNION STREET ↗ | 1 | 11/05/2025 |
| 110-11 69 AVENUE ↗ | 2 | 08/17/2025 |
| 653 MADISON AVENUE ↗ | 1 | 08/13/2025 |
| 363 4 AVENUE ↗ | 3 | 03/07/2025 |
| 1234 CARROLL STREET ↗ | 4 | 01/20/2025 |
| 1150 ST NICHOLAS AVENUE ↗ | 1 | 11/26/2024 |
| 425 EAST 66 STREET ↗ | 2 | 11/21/2024 |
| 232 AVENUE B ↗ | 1 | 07/08/2024 |
| 217 WEST 25 STREET ↗ | 1 | 05/23/2024 |
| 32-04 NORTHERN BOULEVARD ↗ | 3 | 05/08/2024 |
| 1596 PRESIDENT STREET ↗ | 5 | 01/15/2024 |
| 340 EAST 52 STREET ↗ | 1 | 08/04/2023 |
| 123-01 ROOSEVELT AVENUE ↗ | 1 | 06/19/2023 |
| 611 5 AVENUE ↗ | 2 | 02/22/2023 |
| 95 YORK STREET ↗ | 2 | 02/16/2023 |
| 200 WEST STREET ↗ | 1 | 02/02/2023 |
| 2795 RICHMOND AVENUE ↗ | 1 | 11/29/2022 |
| 355 BARD AVENUE ↗ | 1 | 06/08/2021 |
| 103 WEST 14 STREET ↗ | 1 | — |