| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00890651 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 12/01/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR | Modifications to the existing Sprinkler System: Install thirty-nine (39) new sprinkler heads and associated sprinkler piping on the 17th Flo… |
| M00890047 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 09/22/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR | Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and pipin… |
| M00889937 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 04/18/2024 | Contractor OCGP LLC | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 17th Floor (CO)/… |
| M00890038 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 08/24/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL | Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) … |
| M00890637 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/27/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL | Install new plumbing fixtures: (1) HWH, (1) Chiller w/ IM, (1) DW, (1) sink, (1) FD, (1) CM and associated CW/sanitary piping on the 17th Fl… |
| M00889988 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2023 | 07/20/2023 | Owner CBRE, INC. Contractor OCGP LLC | Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (… |
| Name | Projects together | Most recent |
|---|---|---|
| B2 Engineering | 9 | 03/17/2026 |
| Spectorgroup Architecture | 3 | 07/17/2023 |
| Active Design Group Engineering | 1 | 07/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Ocgp | 7 | 10/23/2025 |
| Dependable Mechanical | 2 | 03/17/2026 |
| P.S.I. Mechanical | 2 | 07/13/2023 |
| A & M Warshaw Plumbing & Heating | 1 | 01/26/2022 |
| Aggressive Fire Protection | 1 | 01/26/2022 |
| Demar Plumbing | 1 | 03/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CBRE | 10 | 03/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Brookbridge Consulting Services | 10 | 03/17/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00890651 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 12/01/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR | Modifications to the existing Sprinkler System: Install thirty-nine (39) new sprinkler heads and associated sprinkler piping on the 17th Flo… |
| M00890047 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 09/22/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR | Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and pipin… |
| M00889937 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 04/18/2024 | Contractor OCGP LLC | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 17th Floor (CO)/… |
| M00890038 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 08/24/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL | Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) … |
| M00890637 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/27/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL | Install new plumbing fixtures: (1) HWH, (1) Chiller w/ IM, (1) DW, (1) sink, (1) FD, (1) CM and associated CW/sanitary piping on the 17th Fl… |
| M00889988 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2023 | 07/20/2023 | Owner CBRE, INC. Contractor OCGP LLC | Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (… |
| M00890016 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/19/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor OCGP LLC | Modifications to the existing HVAC System: Redistribution of ductwork, relocate existing unit to new IT room, Install new unit, condensate p… |
| M00890596 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/19/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor OCGP LLC | Modifications to the existing HVAC System: Relocation of ductwork and extend 50x14 transfer duct to open ceiling for return air path on 17th… |
| M00889898 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 07/18/2023 | Owner CBRE, INC. Contractor OCGP LLC | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 18-19th Flrs (CO… |
| M00657735 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2022 | 02/18/2022 | Owner CBRE, INC. Contractor OCGP LLC | Minor interior alterations. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor (CO)/ 35th Fl… |
| M00658154 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/26/2022 | 02/09/2022 | Design B2 ENGINEERING PC Contractor OCGP LLC | Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the 30th Floor (CO)/ 35th Floor (Marketing)… |
| M00658283 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/26/2022 | 02/02/2022 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor AGGRESSIVE FIRE PROT LLC | Modifications to the existing Sprinkler System: Removal of temporary loop, Install (122) new sprinkler heads & associated sprinkler piping o… |
| M00658241 ↗ | 575 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/26/2022 | 02/01/2022 | Design B2 ENGINEERING PC Contractor A & M WARSHAW PLBG & HTG | Install new PL Fixtures: (1) pantry sink, (1) dishwasher, (1) Chiller w/ IM, (1) HWH, (1) Funnel drain and associated CW/Sanitary piping on … |
| Building | Filings | Most Recent |
|---|---|---|
| 575 5TH AVENUE ↗ | 13 | 03/17/2026 |