| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01377675 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Permit Issued | 06/23/2026 | 09/15/2026 | Design HIGHLAND ASSOCIATES Contractor JRM CONSTRUCTION MGMT LLC Filer METROPOLIS GROUP INC | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION W/ INTERIOR 4TH FLR COMMAND CENTER RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANC… |
| B01378149 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Filed — no permit on record | 06/24/2026 | — | Design TPG ARCHITECTURE, LLP Filer METROPOLIS GROUP INC | — |
| B01300008 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Permit Issued | 11/26/2025 | 02/04/2026 | Design HIGHLAND ASSOCIATES Contractor COMPUTER COOL/ICE AGE | INSTALLATION OF CONCRETE ENCASEMENT FOR FUEL OIL PIPING & FIRESTOPPING AS PER PLANS |
| M00929146 ↗ | 55 WATER STREET MANHATTAN | Alteration | Signed-off | 01/29/2024 | 09/23/2024 | Design JFK&M CONSULTING ENGINEERS Owner NEW WATER STREET CORP Contractor SIRINA FIRE PROT CORP Filer CPS | Herewith filing to Cut and cap supply/discharge to/from (2) existing pre-action valves on 19th and 21st floors. Existing pre-action valve to… |
| B00787934 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Signed-off | 09/27/2022 | 10/24/2023 | Design CFS ENGINEERING, DPC Contractor STRUCTURE TONE, LLC Filer MILROSE CONSULTANTS | Mechanical/HVAC renovation to existing commercial space. |
| B00787958 ↗ | 140B 58TH STREET BROOKLYN | Alteration CO | Permit Issued | 09/28/2022 | 10/24/2023 | Design TPG ARCHITECTURE, LLP Contractor STRUCTURE TONE, LLC Filer MILROSE CONSULTANTS | NON LOAD BEARING PARTITION, ELECTRICAL, LIGHTING RELOCATION. CHANGE OF USE ON FLOORS 2-3 TO ESTABLISH OFFICE / UG 6 Occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| TPG Architecture | 4 | 06/25/2026 |
| CFS Engineering | 2 | 06/17/2025 |
| Highland Associates | 2 | 06/25/2026 |
| JFK & M Consulting Engineers | 1 | 01/29/2024 |
| Severud Associates | 1 | 09/27/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Structure Tone | 4 | 06/17/2025 |
| Sirina Fire Protection | 2 | 06/17/2025 |
| Computer Cool/Ice Age | 1 | 11/26/2025 |
| JRM Construction Management | 1 | 06/25/2026 |
| Preferred Mechanical | 1 | 06/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC Economic Development | 5 | 11/26/2025 |
| New Water St Co | 1 | 01/29/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Milrose Consultants | 4 | 06/17/2025 |
| Metropolis Group | 2 | 06/25/2026 |
| Construction Permit Services | 1 | 11/26/2025 |
| CPS | 1 | 01/29/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01377675 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Permit Issued | 06/23/2026 | 09/15/2026 | Design HIGHLAND ASSOCIATES Contractor JRM CONSTRUCTION MGMT LLC Filer METROPOLIS GROUP INC | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION W/ INTERIOR 4TH FLR COMMAND CENTER RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANC… |
| B01378149 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Filed — no permit on record | 06/24/2026 | — | Design TPG ARCHITECTURE, LLP Filer METROPOLIS GROUP INC | — |
| B01300008 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Permit Issued | 11/26/2025 | 02/04/2026 | Design HIGHLAND ASSOCIATES Contractor COMPUTER COOL/ICE AGE | INSTALLATION OF CONCRETE ENCASEMENT FOR FUEL OIL PIPING & FIRESTOPPING AS PER PLANS |
| M00929146 ↗ | 55 WATER STREET MANHATTAN | Alteration | Signed-off | 01/29/2024 | 09/23/2024 | Design JFK&M CONSULTING ENGINEERS Owner NEW WATER STREET CORP Contractor SIRINA FIRE PROT CORP Filer CPS | Herewith filing to Cut and cap supply/discharge to/from (2) existing pre-action valves on 19th and 21st floors. Existing pre-action valve to… |
| B00787934 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Signed-off | 09/27/2022 | 10/24/2023 | Design CFS ENGINEERING, DPC Contractor STRUCTURE TONE, LLC Filer MILROSE CONSULTANTS | Mechanical/HVAC renovation to existing commercial space. |
| B00787958 ↗ | 140B 58TH STREET BROOKLYN | Alteration CO | Permit Issued | 09/28/2022 | 10/24/2023 | Design TPG ARCHITECTURE, LLP Contractor STRUCTURE TONE, LLC Filer MILROSE CONSULTANTS | NON LOAD BEARING PARTITION, ELECTRICAL, LIGHTING RELOCATION. CHANGE OF USE ON FLOORS 2-3 TO ESTABLISH OFFICE / UG 6 Occupancy. |
| B07998837 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Signed-off | 09/27/2022 | 03/01/2023 | Design CFS ENGINEERING, DPC Contractor SIRINA FIRE PROT CORP Filer MILROSE CONSULTANTS | Plumbing, sprinkler, and standpipe modification to existing commercial space. |
| B00787901 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Signed-off | 09/27/2022 | 10/25/2022 | Design SEVERUD ASSOCIATES Contractor STRUCTURE TONE, LLC | Installing a steel dunnage for a new chiller. Approximately 135 feet of steel beams and posts. |
| B00647403 ↗ | 140B 58TH STREET BROOKLYN | Alteration | Signed-off | 01/25/2022 | 02/10/2022 | Design TPG ARCHITECTURE, LLP Contractor STRUCTURE TONE, LLC Filer MILROSE CONSULTANTS | Interior renovation to existing commercial space. No change to occupancy, egress, or use. |
| Building | Filings | Most Recent |
|---|---|---|
| 140B 58TH STREET ↗ | 8 | 06/25/2026 |
| 55 WATER STREET ↗ | 1 | 01/29/2024 |