| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00832495 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 09/24/2026 | Design LAKHANI & JORDAN Contractor ASHLAR MECHANICAL CORP Filer METROPOLIS GROUP INC | HEREWITH FILING FOR SPRINKLER MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APP… |
| M00673316 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 04/25/2022 | 09/23/2026 | Contractor DYNAMIC US, INC | INSTALLATION OF TWO NEW COGEN ENGINES. |
| M00673415 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/29/2022 | 09/22/2026 | Design DYNAMIC US INC. Owner BELLEVUE HOSPITAL Contractor DYNAMIC US, INC | CONSTRUCTION FENCE TO SUPPORT INSTALLATION OF COGEN ENGINES. |
| M00686238 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 04/26/2022 | 09/22/2026 | Owner BELLEVUE HOSPITAL Contractor DYNAMIC US, INC | Constructing CHP platform at Bellevue Hospital. |
| M01437025 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/06/2026 | Design SUPERSTARS CONTRACTING IN Contractor SUPERSTARS CONTRACTING IN | IRA Facade Inspection |
| M01417631 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/24/2026 | — | Design BOLT ARCHITECTURE, PLLC | — |
| Name | Projects together | Most recent |
|---|---|---|
| Jaros Baum & Bolles | 12 | 07/12/2021 |
| Brand Access Solutions | 11 | 06/30/2023 |
| Lakhani & Jordan | 11 | 09/23/2026 |
| WSP | 10 | 03/03/2026 |
| Healthcare Engineering Design | 6 | 01/09/2025 |
| JFK & M Consulting Engineers | 5 | 07/14/2021 |
| Array Architects | 3 | 09/22/2026 |
| Bolt Architecture | 3 | 07/24/2026 |
| Haschek and Bathgate Engineering | 3 | 09/24/2026 |
| Hugh Robotham, Architect | 3 | 03/11/2025 |
| Kallen and Lemelson | 3 | 11/06/2019 |
| Loring Consulting Engineers | 3 | 08/19/2026 |
| MG Engineering | 3 | 10/20/2022 |
| Ysrael A. Seinuk | 3 | 04/16/2025 |
| Ashraf | 2 | 07/20/2023 |
| Levin Engineering | 2 | 03/05/2022 |
| Alpha Engineering | 1 | 07/01/2022 |
| Connor Architecture | 1 | 02/23/2026 |
| Douglas P. Gonzalez | 1 | 07/23/2025 |
| Dynamic US | 1 | 03/29/2022 |
| EES | 1 | 01/31/2025 |
| FL&M Engineering Design & Inspection | 1 | 06/05/2026 |
| Greenman-Pedersen | 1 | 06/17/2026 |
| Halsey McCormack Helmer | 1 | 10/26/2022 |
| HC Pec | 1 | 10/04/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Safway Atlantic | 11 | 06/30/2023 |
| Jemco Electrical Cont | 6 | 09/23/2026 |
| Pace Plumbing | 6 | 07/12/2021 |
| Sirina Fire Protection | 6 | 09/23/2026 |
| Tishman Interiors | 6 | 04/28/2021 |
| ACS System Associates | 4 | 03/03/2026 |
| Current Fire Protection I | 3 | 09/23/2024 |
| Dynamic US | 3 | 03/09/2026 |
| Eastern Plumbing & Mechanical Contracting | 3 | 09/23/2026 |
| Vanguard Construction and | 3 | 07/01/2022 |
| Alliance Plumbing | 2 | 08/19/2026 |
| Cardoza Plumbing | 2 | 08/19/2026 |
| Coppola Paving & Landsca* | 2 | 04/16/2025 |
| Dynamic Contracting | 2 | 09/24/2026 |
| Fratello Construction | 2 | 11/07/2019 |
| Interstate Mechanical Services | 2 | 12/03/2021 |
| Sweet Group of NY | 2 | 08/12/2026 |
| A&F Design & Construction | 1 | 01/09/2025 |
| American Ventilation Service | 1 | 06/29/2023 |
| Ashlar Mechanical | 1 | 09/07/2023 |
| Catalano Plumbing & Heating | 1 | 04/16/2025 |
| Concept Air Conditioning | 1 | 05/15/2024 |
| Consigli Construction Co | 1 | 04/16/2025 |
| Crescent Contracting | 1 | 01/07/2025 |
| Dean Energy Solutions | 1 | 07/30/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| HHC | 14 | 07/12/2021 |
| Bellevue Hospital | 13 | 08/19/2026 |
| Safway Atlantic | 7 | 02/22/2023 |
| NYCH+H/Bellevue | 6 | 07/14/2021 |
| Health and Hospitals | 2 | 04/28/2021 |
| Intersystem Installation S & S | 2 | 07/20/2023 |
| NYC H+H/Bellevue Hospital | 2 | 06/05/2026 |
| High Point Construction Group | 1 | 04/03/2025 |
| Kings Group NY | 1 | 06/07/2021 |
| Nychhc - Bellevue Hospital | 1 | 02/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Metropolis Group | 9 | 09/23/2026 |
| Outsource Consultants | 8 | 02/23/2026 |
| A1 Expediting Service | 7 | 02/22/2023 |
| KM Associates of New York | 6 | 07/30/2025 |
| Caso & Associates | 5 | 10/26/2022 |
| Loring Consulting Engineers | 5 | 08/19/2026 |
| Environmental Engineering Solutions | 4 | 09/24/2026 |
| Milrose Consultants | 2 | 04/28/2021 |
| Rigid Structural Design | 2 | 07/20/2023 |
| Construction Permit Services | 1 | 06/17/2026 |
| Enviornmental & Energy Solutions | 1 | 01/31/2025 |
| HM Loke Consulting Engineering | 1 | 03/11/2025 |
| JMV Associates | 1 | 01/13/2025 |
| The Green Studio | 1 | 04/03/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00832495 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 09/24/2026 | Design LAKHANI & JORDAN Contractor ASHLAR MECHANICAL CORP Filer METROPOLIS GROUP INC | HEREWITH FILING FOR SPRINKLER MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APP… |
| M00673316 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 04/25/2022 | 09/23/2026 | Contractor DYNAMIC US, INC | INSTALLATION OF TWO NEW COGEN ENGINES. |
| M00673415 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/29/2022 | 09/22/2026 | Design DYNAMIC US INC. Owner BELLEVUE HOSPITAL Contractor DYNAMIC US, INC | CONSTRUCTION FENCE TO SUPPORT INSTALLATION OF COGEN ENGINES. |
| M00686238 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 04/26/2022 | 09/22/2026 | Owner BELLEVUE HOSPITAL Contractor DYNAMIC US, INC | Constructing CHP platform at Bellevue Hospital. |
| M01437025 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/06/2026 | Design SUPERSTARS CONTRACTING IN Contractor SUPERSTARS CONTRACTING IN | IRA Facade Inspection |
| M01417631 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/24/2026 | — | Design BOLT ARCHITECTURE, PLLC | — |
| M01200061 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 04/03/2025 | 06/23/2026 | Design VOLUME SPACE CONSULTING INC. Owner HIGH POINT CONSTR. GROUP Contractor HIGH POINT CONSTRUCTION Filer THE GREEN STUDIO | INSTALLATION OF SIDEWALK SHED |
| M01414479 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/16/2026 | — | Design GREENMAN-PEDERSEN, INC. | — |
| M01393178 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 06/05/2026 | 06/08/2026 | Contractor STONEBRIDGE CONTRACTING C | INSTALLATION OF PIPE SCAFFOLDING, 300 PSF OVERHEAD PROTECTION AND SHORING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE … |
| M01348746 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 02/23/2026 | 06/05/2026 | Design Connor Architecture, LLC Contractor R.W. DAKE & CO.,INC | BELLEVUE - CAFE - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01034929 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 07/09/2024 | 05/06/2026 | Design WSP Contractor ACS SYSTEM ASSOCIATES INC. | Cooling systems for elevator machine rooms |
| M01090450 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2025 | 04/30/2026 | Contractor JEMCO ELECTRICAL CONT INC | Roofing replacement. No change of occupancy use or egress. |
| M00603496 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 10/27/2021 | 04/13/2026 | Design WSP Contractor SIRINA FIRE PROT CORP | BELLEVUE HOSPITAL IS FITTING OUT AN EXISTING 9TH FLOOR LAB AS NEW IT/MDF ROOM. ROOM WILL BE PROTECTED WITH A DEDICATED SINGLE INTERLOCKED EL… |
| M00832485 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 04/02/2026 | Design LAKHANI & JORDAN Contractor HOLT CONSTRUCTION CORP | .HEREWITH FILING FOR MODIFICATIONS TO THE MECHANICAL SYSTEM AT THE 16TH FLR INFUSION CENTER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR E… |
| M01307119 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 12/22/2025 | — | — | — |
| M08014166 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/26/2023 | 12/02/2025 | Design ARRAY ARCHITECTS Contractor JEMCO ELECTRICAL CONT Filer METROPOLIS GROUP INC | HEREWITH FILING FOR ARCHITECTURAL ANTI-LIGATURE WORK ON THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) PER PLANS. NO CHANGE IN US… |
| M08014195 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/22/2023 | 12/01/2025 | Design LAKHANI & JORDAN Contractor JEMCO ELECTRICAL CONT Filer METROPOLIS GROUP INC | HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENO… |
| M00613876 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/04/2021 | 11/13/2025 | Design WSP Contractor JEMCO ELECTRICAL CONT | A NEW PACKAGED ROOFTOPUNIT WILL BE PROVIDED. THE UNIT WILL ALSO INCLUDE COOLINGCAPACITY FOR FUTURE RACKS TO BE INSTALLED IN THE SPACE. THISP… |
| M08015085 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 01/02/2024 | 11/05/2025 | Design LAKHANI & JORDAN Contractor SIRINA FIRE PROT CORP Filer METROPOLIS GROUP INC | HEREWITH FILING FOR SPRINKLER MODIFICATIONS ON THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOV… |
| M00832491 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 10/03/2025 | Design LAKHANI & JORDAN Contractor MAC FELDER INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR PLUMBING MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPL… |
| M08014199 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/26/2023 | 09/24/2025 | Design LAKHANI & JORDAN Contractor EASTERN PLBG & MECH CONTR Filer METROPOLIS GROUP INC | HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENO… |
| M01169967 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/18/2025 | — | Design LAKHANI & JORDAN | — |
| M01042201 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2024 | 05/21/2025 | Design LAKHANI & JORDAN Contractor CONSIGLI CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING UNDERGROUND OIL FUEL TANK IN SUPPORT OF NEW SECONDARY GENERATOR FOR BELLEVUE CAMPUS PER PLANS. |
| M00493213 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 04/22/2021 | 04/30/2025 | Design WSP Owner HHC Contractor ACS SYSTEM ASSOCIATES INC. | Relocation of Switchgear and related Mechanical duct and AC units, within Ambulatory Care Building of Bellevue Hospital |
| M01029849 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 07/09/2024 | 04/30/2025 | Design WSP Contractor ACS SYSTEM ASSOCIATES INC. | Steel dunnage support for mechanical equipment. |
| M00990806 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 07/09/2024 | 04/28/2025 | Contractor ACS SYSTEM ASSOCIATES INC. | Cut roofing membrane and provide flashing for the installation of steel dunnage. No change of use occupancy or egress. |
| M00596965 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 10/27/2021 | 04/08/2025 | Contractor JEMCO ELECTRICAL CONT | Remove existing and provide new non load bearing partitions, floor tiles, and suspended ceilings. Provide new doors and roof curbs. No chang… |
| M00902559 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 01/29/2024 | 03/21/2025 | Contractor A&F DESIGN & CONSTRUC INC | Minor demolition; installing drywall partitions, doors, doorframes, resilient flooring, suspended ceiling grids & tiles; painting; and insta… |
| M00517470 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 05/20/2021 | 03/14/2025 | Design MACAN DEVE ENGINEERS Contractor DEAN ENERGY SOLUTIONS COR | Removal and installation of 2 AHU units. AHU units will serve as temporary cooling, then converted to permanent heating and ventilation unit… |
| M00595550 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/03/2021 | 02/13/2025 | Owner BELLEVUE HOSPITAL Contractor INTERSTATE MECH SVCS | Modification for the removal and replacement existing chiller plant on 13th fl. Cooling towers on roof with associated work on the 22nd,23… |
| M00595585 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/02/2021 | 02/13/2025 | Design YSRAEL A. SEINUK, P.C. Owner BELLEVUE HOSPITAL Contractor INTERSTATE MECH SVCS | Cooling Tower Replacement and Chilled Water System Upgrade |
| M01174412 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/31/2025 | — | Design EES | — |
| M00641511 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 09/06/2022 | 01/08/2025 | Design THE LIRO GROUP Contractor VITAL PLUMBING, INC Filer JMV ASSOCIATES LLC | Proposed replacement of combined wet Sprinkler & SD south riser due to pipe corrosion. All as per plans filed herewith. |
| M08049660 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 11/15/2024 | Design LAKHANI & JORDAN Contractor SIRINA FIRE PROT CORP | HEREWITH FILING FOR SPRINKLER MODIFICATIONS AND FIRE HOSE CABINET RELOCATION ON THE 19TH FLR PER PLANS. |
| M01099109 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 09/03/2024 | 11/13/2024 | Contractor COPPOLA PAVING & LANDSCA* | Install Support of Excavation including Slide Rail Shoring System as per attached drawings for fuel oil tank installation associated with ou… |
| M01120169 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 10/04/2024 | 10/07/2024 | Design HC PEC Contractor PJP INSTALLERS INC | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A… |
| M00683890 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 02/18/2022 | 09/25/2024 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U… |
| M01108254 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 09/16/2024 | 09/20/2024 | Design NEW AGE ENGINEERING PLLC Contractor THE METRO GROUP, INC | INSTALL REPLACEMENT EXHAUST VENT FOR (4) GENERATORS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01018378 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2024 | 09/19/2024 | Contractor CURRENT FIRE PROTECTION I | BELLEVUE HOSPITAL CENTER - DAYCARE - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M08013698 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2022 | 08/23/2024 | Design LAKHANI & JORDAN Owner BELLEVUE HOSPITAL Contractor CARDOZA PLUMBING WMBE Filer METROPOLIS GROUP INC | HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 19TH FLR FORENSIC UNIT PER PLANS. |
| M01018370 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2024 | 08/21/2024 | Contractor EASTERN PLBG & MECH CONTR | BELLEVUE HOSPITAL CENTER - DAYCARE CENTER AND OFFICE - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCC… |
| M01018363 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2024 | 08/20/2024 | Contractor CONCEPT AIR CONDITIONING | BELLEVUE HOSPITAL CENTER - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. |
| M01061556 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 06/13/2024 | 08/19/2024 | Contractor DYNAMIC CONTRACTING CORP | THIS APPLICATION IS PROPOSED FOR THE COMBINED HEAT & POWER (CHP) PROJECT COMPRISED OF (2) 2 MW NATURAL GAS RECIPROCATING ENGINE GENERATORS. … |
| M01018355 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2024 | 08/16/2024 | Contractor JEMCO ELECTRICAL CONT | BELLEVUE HOSPITAL CENTER - DAYCARE CENTER AND OFFICE - GENERAL CONSTRUCTION INCLUDING MODIFCATIONS TO CEILING, FLOOR, PARTITIONS AND DOORS A… |
| M08013670 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 07/24/2024 | Design ARRAY ARCHITECTS Owner BELLEVUE HOSPITAL Contractor SWEET GROUP OF NY LLC Filer METROPOLIS GROUP INC | HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL… |
| M08013693 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 07/24/2024 | Design LAKHANI & JORDAN Contractor SWEET GROUP OF NY LLC | HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 19TH FLR FORENSIC UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPL… |
| M00974604 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/17/2024 | — | Design BOLT ARCHITECTURE, PLLC | — |
| M00902415 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 01/26/2024 | 05/16/2024 | Contractor CRESCENT CONTRACTING CORP | Plumbing Work includes replacing existing plumbing fixtures and medical gases. There are no changes in egress or occupancy. |
| M00280637 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 09/23/2020 | 05/10/2024 | Design WSP Owner HHC Contractor RAEL AUTOMATIC SPR.CO INC | Sprinkler work in Ambulatory Care Building |
| M00673396 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/29/2022 | 03/06/2024 | Contractor DYNAMIC CONTRACTING CORP | FUEL GAS PIPING TO SUPPORT INSTALLATION OF TWO NEW COGEN ENGINES |
| M00634801 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/23/2021 | 10/24/2023 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U… |
| M00416538 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2020 | 09/28/2023 | Design JAROS BAUM & BOLLES Owner HHC Contractor PACE PLUMBING CORP Filer MBE CODE & ZONING LLC | REPLACE 1 SINK & MEDICAL GAS PIPING & EQUIPMENT ON EXISTING ROUGHING . INSTALL 1 NEW UTILITY SINK & INSTALL 2 NEW SINKS CONNECTING TO EXIST… |
| M00633957 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/19/2021 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC.… |
| M00666024 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 01/21/2022 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC… |
| M00700984 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/21/2022 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US… |
| M00701281 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/21/2022 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY O… |
| M00736884 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2022 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY O… |
| M00833245 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 02/22/2023 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,… |
| M00897905 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 06/30/2023 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | EAST TOWER: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS … |
| M00897909 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 06/30/2023 | 09/27/2023 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | WEST TOWER: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS … |
| M00595528 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/03/2021 | 07/28/2023 | Owner BELLEVUE HOSPITAL Contractor CARDOZA PLUMBING CORP | Modification for the removal and replacement existing chiller plant on 13th FL with associated work on the 22nd,23rd,24th floors & Cooling … |
| M00897499 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 06/29/2023 | 06/30/2023 | Design ASHRAF CORP Owner INTERSYSTEM INSTALLATION S & S CORP Contractor AMERICAN VENTILATION SERV | Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00887773 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2023 | 06/22/2023 | Design ASHRAF CORP Owner INTERSYSTEM INSTALLATION S & S CORP Contractor INTERSYSTEMS INSTAL S&S | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in us… |
| M00242878 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/06/2019 | 05/18/2023 | Design KALLEN AND LEMELSON Owner HHC Contractor CURRENT FIRE PROTECTION I Filer CASO & ASSOCIATES,INC. | Installation of sprinklers for 7 floor West renovation of the isolation and quarantine unit |
| M00668778 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/03/2022 | 01/27/2023 | Design LEVIN ENGINEERING PLLC Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY SPRINKLER SYSTEM ON THE 2ND FLOOR AT BELLEVUE HOSPITAL AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS… |
| M00669605 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/02/2022 | 01/27/2023 | Design LEVIN ENGINEERING PLLC Owner BELLEVUE HOSPITAL Contractor SIRINA FIRE PROT CORP | EXISTING FIRE DEPARTMENT CONNECTION TO BE EXTENDED OUT TO TEMPORARY FENCE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUP… |
| M00772154 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/26/2022 | — | Design HALSEY MCCORMACK HELMER INC Owner BELLEVUE HOSPITAL Filer CASO & ASSOCIATES,INC. | — |
| M00772162 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/26/2022 | — | Owner BELLEVUE HOSPITAL Filer CASO & ASSOCIATES,INC. | — |
| M00772156 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/20/2022 | — | Design MG ENGINEERING D.P.C. Owner BELLEVUE HOSPITAL Filer CASO & ASSOCIATES,INC. | — |
| M00772157 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/20/2022 | — | Design MG ENGINEERING D.P.C. Owner BELLEVUE HOSPITAL Filer CASO & ASSOCIATES,INC. | — |
| M00772158 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/20/2022 | — | Design MG ENGINEERING D.P.C. Owner BELLEVUE HOSPITAL Filer CASO & ASSOCIATES,INC. | — |
| M00634371 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/24/2021 | 10/04/2022 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. CHUTE ATTACHED TO PIPE SCAFFOLDING. PIPE SCAFFOLD FILED SEPARATELY. DEBRIS CHUTE SHA… |
| M00720573 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 07/01/2022 | 07/29/2022 | Design ALPHA ENGINEERING Contractor VANGUARD CONSTRUCTION AND | Bellevue Hospital - Roche Lab - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00440581 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/12/2021 | 07/21/2022 | Design JFK&M CONSULTING ENGINEERS Owner NYCH+H/BELLEVUE Contractor VANGUARD CONSTRUCTION AND | Bellevue Hospital - Roche Lab -MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00209765 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 10/21/2019 | 07/20/2022 | Design WSP Owner HHC Contractor UNIVERSAL HEATING AIR C | Relocation of 3 air handling units with associated ductwork and piping |
| M00745311 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/14/2022 | Design URBAN FOUNDATION/ENGINEERING Contractor URBAN FOUNDATION ENGINEERING | HEREWITH FILING FOR TEST PITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| M00416186 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2020 | 01/10/2022 | Design JAROS BAUM & BOLLES Owner NYCH+H/BELLEVUE Contractor PACE PLUMBING CORP Filer MBE CODE & ZONING LLC | REPLACE & INSTALL NEW DOMESTIC WATER, SANITARY & MEDICAL GAS PIPING & EQUIPMENT TO EXISTING ROUGHING WHERE POSSIBLE AS SHOWN ON DRAWINGS FIL… |
| M00597855 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 12/02/2021 | — | Design BOLT ARCHITECTURE, PLLC | — |
| M00223392 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 11/07/2019 | 10/14/2021 | Design WSP Contractor FRATELLO CONSTRUCTION COR | Associated structural work in relation to installation of 3 rooftop AHUs |
| M00242921 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 11/06/2019 | 10/12/2021 | Design KALLEN AND LEMELSON Owner HHC Contractor WASOFF PLBG & UTILITY CO Filer CASO & ASSOCIATES,INC. | Remove and cap 1 toilet and 1 lavatory and install 1 floor drain and 1 back flow preventer as part of the 7 West isolation and quarantine u… |
| M00453112 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/09/2021 | 08/17/2021 | Design TPG ARCHITECTURE, LLP Owner NYCH+H/BELLEVUE Contractor VANGUARD CONSTRUCTION AND | Bellevue Hospital - Accessioning Roche Lab - MODIFICATIONS OF PARTITIONS, DOORS AND CEILING ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO … |
| M00249350 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/06/2019 | 08/10/2021 | Design KALLEN AND LEMELSON Contractor C & M HOME IMPROVEMENT | Upgrade of existing Air handling system serving isolation patient rooms on the 7th floor |
| M00553757 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 07/14/2021 | 07/20/2021 | Design JFK&M CONSULTING ENGINEERS Owner NYCH+H/BELLEVUE Contractor SIRINA FIRE PROT CORP | Bellevue Hospital - Roche Lab - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00220737 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 10/15/2019 | 06/17/2021 | Design WSP Contractor CURRENT FIRE PROTECTION I | Installation of new sprinkler heads |
| M00528198 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 06/07/2021 | 06/09/2021 | Design SYED ENGINEERING, P.C. Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| M00502614 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2021 | 05/03/2021 | Design RAZAK ASSOCIATES PLLC Owner HEALTH + HOSPITALS CORP Contractor TISHMAN INTERIORS CORP Filer MILROSE CONSULTANTS | Filing to modify suspended ceiling system to accommodate above ceiling mounted HEPA filer unit. No change in use, egress or occupancy. |
| M00502621 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2021 | 05/03/2021 | Design JFK&M CONSULTING ENGINEERS Owner HEALTH + HOSPITALS CORP Contractor TISHMAN INTERIORS CORP Filer MILROSE CONSULTANTS | Filing to replace filters with enhanced electronic filtration technology, add bipolar ionization, provide UV lighting at cooling coils, and … |
| M00440612 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 03/12/2021 | 04/16/2021 | Design JFK&M CONSULTING ENGINEERS Owner NYCH+H/BELLEVUE Contractor PAR PLUMBING CO., INC | Bellevue Hospital - Roche Lab - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00358729 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/04/2020 | 03/26/2021 | Design JAROS BAUM & BOLLES Owner HHC Contractor TISHMAN INTERIORS CORP Filer MBE CODE & ZONING LLC | MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00440663 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 03/12/2021 | — | Design JFK&M CONSULTING ENGINEERS Owner NYCH+H/BELLEVUE | — |
| M00416274 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/10/2020 | 02/25/2021 | Design JAROS BAUM & BOLLES Contractor PACE PLUMBING CORP | REPLACE 1 SINK ON EXISTING ROUGHING AND INSTALL MEDICAL GAS & PIPING TO EXISTING ROUGHING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN… |
| M00385509 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/10/2020 | 02/18/2021 | Design JAROS BAUM & BOLLES Owner HHC Contractor TISHMAN INTERIORS CORP Filer MBE CODE & ZONING LLC | MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00385364 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2020 | 02/08/2021 | Design JAROS BAUM & BOLLES Contractor TISHMAN INTERIORS CORP | MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00415643 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/04/2020 | 02/08/2021 | Design JAROS BAUM & BOLLES Owner HHC Contractor PACE PLUMBING CORP Filer MBE CODE & ZONING LLC | RELOCATE 2 SINKS ON EXISTING ROUGHING. INSTALL 1 NEW SINK AND PIPING IN CEILING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| M00416244 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2020 | 02/04/2021 | Design JAROS BAUM & BOLLES Owner HHC Contractor MANENGEERING BUREAU, INC Filer MBE CODE & ZONING LLC | INSTALL 67 NEW SPRINKLER HEADS, 1 FLOOR CONTROL VALVE WITH PRV & 1 SP WET PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| M00416557 | 462 1ST AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2020 | 01/20/2021 | Design JAROS BAUM & BOLLES Owner HHC Contractor MANENGEERING BUREAU, INC Filer MBE CODE & ZONING LLC | INSTALL 31 NEW SPRINKLER HEADS AND 1 NEW SPRINKLER WET PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00385469 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 11/10/2020 | 11/18/2020 | Design JAROS BAUM & BOLLES Owner HHC Contractor TISHMAN INTERIORS CORP Filer MBE CODE & ZONING LLC | MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00416355 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/10/2020 | — | Design JAROS BAUM & BOLLES | — |
| M00415782 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/04/2020 | — | Design JAROS BAUM & BOLLES | — |
| M00278936 | 462 1ST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/12/2020 | — | Design WSP Owner HHC | — |
| Building | Filings | Most Recent |
|---|---|---|
| 462 1ST AVENUE ↗ | 100 | 09/24/2026 |