| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01254015 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/28/2025 | Design MG ENGINEERING D.P.C. Contractor DEMAR PLUMBING CORP Filer MILROSE CONSULTANTS | Removal of existing and installation of new sprinkler heads. 14 Temporary sprinkler heads being installed and fire hose cabinet replaced .In… |
| M01253866 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/26/2025 | Design MG ENGINEERING D.P.C. Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | The existing water-cooled air handling unit is being re-used with ductwork modifications per the layout of the space. This project includes … |
| M01253845 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/14/2025 | Design TPG ARCHITECTURE, LLP Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | Interior build out of office space on the 14th floor, including the removal of existing interior non-bearing partitions and finishes. The a… |
| M01260922 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/14/2025 | Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | Support for three new operable partitions to the existing concrete structure |
| Name | Projects together | Most recent |
|---|---|---|
| MG Engineering | 2 | 12/01/2025 |
| Kiefer & Schuster Engineering | 1 | 08/07/2025 |
| TPG Architecture | 1 | 08/07/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Unity Construction Group | 3 | 08/07/2025 |
| Demar Plumbing | 1 | 12/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Milrose Consultants | 4 | 12/01/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01254015 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/28/2025 | Design MG ENGINEERING D.P.C. Contractor DEMAR PLUMBING CORP Filer MILROSE CONSULTANTS | Removal of existing and installation of new sprinkler heads. 14 Temporary sprinkler heads being installed and fire hose cabinet replaced .In… |
| M01253866 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/26/2025 | Design MG ENGINEERING D.P.C. Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | The existing water-cooled air handling unit is being re-used with ductwork modifications per the layout of the space. This project includes … |
| M01253845 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/14/2025 | Design TPG ARCHITECTURE, LLP Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | Interior build out of office space on the 14th floor, including the removal of existing interior non-bearing partitions and finishes. The a… |
| M01260922 ↗ | 101 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/14/2025 | Contractor UNITY CONSTRUCTION GROUP Filer MILROSE CONSULTANTS | Support for three new operable partitions to the existing concrete structure |
| Building | Filings | Most Recent |
|---|---|---|
| 101 AVENUE OF THE AMERICAS ↗ | 4 | 12/01/2025 |