← Back
BuildNYC
Office, 20+ stories, with or without commercial
101 AVENUE OF THE AMERICAS
MANHATTAN · BIN 1007119
💬 Discuss this project
1990Year Built
25Stories
O4Building Class
M1-6Zoning
402,111 sfGross Floor Area
29Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 101 Limited Partnership · 30,912 sf lot · 13.01 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEdward J. Minskoff Equities, Inc.1p · 1 filing · 2 docs
Floor 18Two Sigma53p · 3 filings · 20 docs
Floor 17
Floor 16
Floor 15Two Sigma23p · 3 filings · 14 docs
Floor 14Overdeck - Seven Valleys37p · 4 filings · 20 docs
Floor 13
Floor 12Edward J. Minskoff Equities, INC.31p · 4 filings · 20 docs
Floor 11Digital Ocean3p · 1 filing · 6 docs
Floor 10Digital Ocean5p · 2 filings · 9 docs
Floor 9
Floor 8
Floor 7New York Genome Center6p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4New York Genome Center4p · 1 filing · 2 docs
Floor 34p · 2 filings · 4 docs
Floor 2
Floor 1NewmarkUnder Construction3p · 1 filing · 5 docs
CellarNewmarkUnder Construction3p · 1 filing · 5 docs
Site & exteriorEdward J. Minskoff Equities, Inc.18p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
101 A of A Ground Lessee28503/21/2026
101 Operating4503/21/2026
Edward J. Minskoff Equities4407/08/2026
101 Partners3403/22/2026
Grubb and Ellis Co1703/21/2026
NGKF303/22/2026
NY Genome Center303/22/2026
Trinity Church of N Y203/21/2026
Quantum Design103/21/2026
Limited Partnership103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants4003/21/2026
Codegreen803/21/2026
Integrated C O Milrose Consultants203/21/2026
Municipal Building Consultants203/21/2026
PDG Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icon InteriorsGeneral Contractor607/08/2026
Unity Construction GroupGeneral Contractor304/09/2026
Royal Concrete and Mason*specialty_contractor303/21/2026
Tri-Star ConstructionGeneral Contractor307/08/2026
Omara OrganizationGeneral Contractor203/21/2026
Cercone Exterior RestorationScaffold203/21/2026
Phoenix Sutton STRScaffold203/21/2026
Demar PlumbingFire Protection207/08/2026
Abco-Peerless SprinklerFire Protection207/08/2026
CJS IndustriesGeneral Contractor203/21/2026
Hunter Roberts ConstructionGeneral Contractor203/21/2026
Par Plumbing CoPlumbing207/08/2026
Standard Fire ProtectionFire Protection107/08/2026
Cercone Exterior RestorationGeneral Contractor107/08/2026
Demar PlumbingPlumbing107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Update Systems ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524612/01/2025
Alexander Building Consulting9588111/13/2025
Milrose Consultants2003801/23/2024
Synergy Engineering784703/29/2023
George J. Xerakias, PE1658208/15/2022
Cole Technologies/Control1290103/21/2022
Building Lifecycle
All (198)Filed (35)Permit Issued (26)Signed Off (17)Facade (FISP) (12)Violation (60)Inspection (16)Objection (2)Special Inspection (30)
07/06/2026
Signed off — Alteration
Support for three new operable partitions to the existing concrete structure
M01260922-I1
06/17/2026
Signed off — Alteration
INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION
M01405819-I1
06/03/2026
Permit issued — Suspended Scaffold
M01405819-I1-SC
06/02/2026
Signed off — Alteration
The existing water-cooled air handling unit is being re-used with ductwork modifications per the layout of the space. This project includes a new supplemental 5-ton water cooled heat pump unit and a new 2-ton water-cooled computer room AC unit.
M01253866-I1
06/02/2026
Signed off — Alteration
Removal of existing and installation of new sprinkler heads. 14 Temporary sprinkler heads being installed and fire hose cabinet replaced .Installation of new pantry, wellness room, and lavatories with all associated piping and equipment
M01254015-I1
05/28/2026
Signed off — Alteration
Interior build out of office space on the 14th floor, including the removal of existing interior non-bearing partitions and finishes. The area of work is approximately 10,900-SF.
M01253845-I1
05/21/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION
M01405819-I1
04/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
12/02/2025
Special inspection requirement — Standpipe Systems
Shahrish Shuvo
12/02/2025
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
12/02/2025
Special inspection requirement — Sprinkler Systems
Shahrish Shuvo
12/01/2025
Filed — Alteration
Removal of existing and installation of new sprinkler heads. 14 Temporary sprinkler heads being installed and fire hose cabinet replaced .Installation of new pantry, wellness room, and lavatories with all associated piping and equipment
M01254015-P1
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
11/20/2025
Special inspection requirement — Sprinkler Systems
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
11/20/2025
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
11/20/2025
Special inspection requirement — Standpipe Systems
Shahrish Shuvo
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
11/19/2025
Permit issued — Structural
M01317353-I1-GC-CX
11/13/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01317353-I1
11/11/2025
Special inspection requirement — Final
Alexander Lee
11/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Alexander Lee
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Lee
10/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2025
Permit issued — Sprinklers
M01254015-I1-EW-SD
08/28/2025
Permit issued — Standpipe
M01254015-I1-EW-SP
08/28/2025
Permit issued — Standpipe
M01254015-I1-PL
08/26/2025
Permit issued — Mechanical Systems
M01253866-I1-MS
08/14/2025
Permit issued — Structural
M01260922-I1-ST
08/14/2025
Permit issued — General Construction
M01253845-I1-GC
08/07/2025
Filed — Alteration
Support for three new operable partitions to the existing concrete structure
M01260922-I1
08/07/2025
Filed — Alteration
The existing water-cooled air handling unit is being re-used with ductwork modifications per the layout of the space. This project includes a new supplemental 5-ton water cooled heat pump unit and a new 2-ton water-cooled computer room AC unit.
M01253866-I1
08/07/2025
Filed — Alteration
Removal of existing and installation of new sprinkler heads. 14 Temporary sprinkler heads being installed and fire hose cabinet replaced .Installation of new pantry, wellness room, and lavatories with all associated piping and equipment
M01254015-I1
08/07/2025
Filed — Alteration
Interior build out of office space on the 14th floor, including the removal of existing interior non-bearing partitions and finishes. The area of work is approximately 10,900-SF.
M01253845-I1
08/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Shahrish Shuvo
08/07/2025
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
08/07/2025
Special inspection requirement — Structural Steel - Welding
Shahrish Shuvo
07/25/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
07/24/2025
Special inspection requirement — Final
Shahrish Shuvo
07/15/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/15/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
07/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
07/10/2025
Special inspection requirement — Electrical motors and elevators
Shahrish Shuvo
07/10/2025
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
04/18/2024
Signed off — Alteration
Modification to plumbing and sprinkler systems as per plans filed herewith.
M00807013-I1
04/18/2024
Signed off — Alteration
Modification to mechanical system as per plans filed herewith.
M00807009-I1
04/16/2024
Signed off — Alteration
Interior renovation as per plans filed herewith.
M00808021-I1
Latest 60 of 198 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSato Construction Co06/03/2026
DOB NOWStructuralPermit IssuedRoyal Concrete and Mason*11/19/2025
DOB NOWStandpipeSigned-offDemar Plumbing08/28/2025
DOB NOWSprinklersSigned-offDemar Plumbing08/28/2025
DOB NOWPlumbingSigned-offDemar Plumbing08/28/2025
DOB NOWMechanical SystemsSigned-offUnity Construction Group08/26/2025
DOB NOWStructuralSigned-offUnity Construction Group08/14/2025
DOB NOWGeneral ConstructionSigned-offUnity Construction Group08/14/2025
DOB NOWGeneral ConstructionSigned-offIcon Interiors01/31/2024
DOB NOWMechanical SystemsSigned-offIcon Interiors07/06/2023
DOB NOWPlumbingSigned-offPar Plumbing Co07/06/2023
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler07/06/2023
DOB NOWSprinklersPermit IssuedStandard Fire Supp04/13/2023
DOB NOWPlumbingPermit IssuedPar Plumbing Co04/13/2023
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction03/31/2023
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler03/17/2023
DOB NOWMechanical SystemsSigned-offIcon Interiors03/16/2023
DOB NOWGeneral ConstructionSigned-offIcon Interiors03/16/2023
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction02/15/2023
DOB NOWGeneral ConstructionSigned-offOmara Organization12/12/2022
DOB NOWSupported ScaffoldPermit IssuedCercone Exterior Restoration07/21/2022
DOB NOWGeneral ConstructionSigned-offCercone Exterior Restoration07/12/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR06/08/2022
DOB NOWSprinklersSigned-offLawrence J. Levine05/06/2022
DOB NOWGeneral ConstructionSigned-offCJS Industries02/23/2022
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction12/08/2021
BIS—ISSUED101 Aoa GRD Lessee03/08/2019
BISMHISSUEDTurner Construction Company11/09/2018
BISOTISSUEDTurner Construction Company11/03/2017
BISSPISSUEDPreferred Sprinkler and Mechanical10/31/2017
BISMHISSUEDInterstate Interiors10/31/2017
BISOTISSUEDInterstate Interiors10/31/2017
BISMHISSUEDTurner Construction Company10/27/2017
BISOTISSUEDTurner Construction Company10/27/2017
BISPLISSUEDCardoza Plumbing10/24/2017
BISSPISSUEDPreferred Sprinkler and Mechanical10/17/2017
BISOTISSUEDTurner Construction Company10/11/2017
BISMHISSUEDTurner Construction Company09/27/2017
BISOTISSUEDC Squared Systems09/25/2017
BISOTISSUEDCercone Exterior Restoration07/05/2017
+ 36 more permits on file
1 project · most recent 08/07/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2025Signed-offUnity Construction GroupAir Conditioning Systems, Heating Systems
Cooling
Above Air MCW-007S1-4-00ERH-EC-00-UF2-XS 29,900 BTU · Condensing Unit ×1
Water Furnace V7AH060BV4AM1DSRBENW312SSS 57,090 BTU · Heat Pump Outdoor ×1
Heating
Above Air MCW-007S1-4-00ERH-EC-00-UF2-XS 35,900 BTU · Condensing Unit ×1
Water Furnace V7AH060BV4AM1DSRBENW312SSS 62,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 12/01/2025
FiledStatusContractorScope
12/01/2025Signed-offDemar Plumbing514 heads, 2 outlets
2 projects · most recent 12/01/2025
Water/Sanitary
FiledStatusContractorScope
12/01/2025Signed-offDemar PlumbingWater/Sanitary
03/29/2023Permit IssuedPar Plumbing CoWater/Sanitary
8 projects · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025Permit IssuedUpdate Systems ElectricalGeneral Wiring
09/14/2023CompleteKnight Electrical Service1 meters
03/17/2023CompleteP.E. StoneGeneral Wiring
06/02/2022CompleteElpo Electrical Contg—
01/28/2021CompleteE-J Electric Installation CoGeneral Wiring
08/02/2020CompleteJam Electrical—
06/01/2018CompleteForest ElectricGeneral Wiring
01/25/2018CompleteNead ElectricGeneral Wiring
2 projects · most recent 11/13/2025
Concrete Steel
FiledStatusContractorScope
11/13/2025Permit IssuedRoyal Concrete and Mason*Concrete
08/07/2025Signed-offUnity Construction GroupSteel
1 project · most recent 08/15/2022
Scaffold
FiledStatusContractorScope
08/15/2022Permit IssuedCercone Exterior RestorationScaffold
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
12/02/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
12/02/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
12/02/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
12/02/2025Post-installed AnchorsShahrish Shuvospecial
12/02/2025Standpipe SystemsShahrish Shuvospecial
12/02/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
12/02/2025Sprinkler SystemsShahrish Shuvospecial
12/02/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
11/20/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/20/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
11/20/2025Standpipe SystemsShahrish Shuvospecial
11/20/2025Post-installed AnchorsShahrish Shuvospecial
11/20/2025Sprinkler SystemsShahrish Shuvospecial
11/20/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
11/20/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
11/20/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
11/11/2025Structural Stability – Alterations of existing buildingsAlexander Leespecial
11/11/2025Concrete - Cast-In-PlaceAlexander Leespecial
11/11/2025FinalAlexander Leeprogress
08/07/2025Post-installed AnchorsShahrish Shuvospecial
08/07/2025Structural Steel - WeldingShahrish Shuvospecial
08/07/2025Structural Steel - High Strength BoltingShahrish Shuvospecial
07/25/2025Structural Steel - DetailsShahrish Shuvospecial
07/24/2025FinalShahrish Shuvoprogress
07/15/2025Interior lighting powerShahrish Shuvoenergy_progress
Latest 25 of 97.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewmarkOfficeCellar, Floor 1
Project M01317353 Alteration · Permit Entire · 11/13/2025
Overdeck - Seven ValleysOfficeFloor 14
Project M01253845 Alteration · LOC Issued · 08/07/2025
Project M01253866 Alteration · LOC Issued · 08/07/2025
Project M01254015 Alteration · LOC Issued · 08/07/2025
Project M01260922 Alteration · LOC Issued · 08/07/2025
Two SigmaOfficeFloors 15, 18
Project M00807009 Alteration · LOC Issued · 07/05/2023
Project M00807013 Alteration · LOC Issued · 07/05/2023
Project M00808021 Alteration · LOC Issued · 03/24/2023
Project M00806909 Alteration · LOC Issued · 03/01/2023
Project M00806913 Alteration · LOC Issued · 03/01/2023
Project M00806900 Alteration · LOC Issued · 02/23/2023
JLABSLaboratoryFloor 3
Project M00781263 Alteration · Filing Withdrawn · 12/22/2022
Project M00781278 Alteration · Filing Withdrawn · 12/21/2022
Project M00781257 Alteration · Filing Withdrawn · 11/03/2022
New York Genome CenterLaboratoryFloors 4, 7
Project M08026210 Alteration · LOC Issued · 12/06/2022
Project M00593552 Alteration · LOC Issued · 10/19/2021
Digital OceanOfficeFloors 10, 11
Project M00680789 Alteration · LOC Issued · 02/18/2022
Project M00680814 Alteration · LOC Issued · 02/18/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,161 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch33
09/02/2026M00680789-I1Request digital key ↗
09/02/2026M00680814-I1Request digital key ↗
09/02/2026M00701495-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/05/2026M00190457-I1Request digital key ↗
08/31/2026M00886857-I1Request digital key ↗
▸Applications & Permits395
▸BISPLAN / WORK APPROVAL APPLICATION237
10/17/2025122408457Open ↗
09/10/2025121324156Open ↗
08/19/2025121324156Open ↗
Showing 3 of 237 on file for this type
▸BISWORK PERMIT APPLICATION145
03/08/2019123490775Open ↗
11/09/2018123142358Open ↗
Showing 2 of 145 on file for this type
▸BISPLACE OF ASSEMBLY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION5
03/22/2019123490775Open ↗
Showing 1 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications531
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION295
11/25/2019123142358Open ↗
11/19/2019123134651Open ↗
11/19/2019123134651Open ↗
Showing 3 of 295 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST59
11/22/2019123142358Open ↗
Showing 1 of 59 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/30/2026M01254015-P1Open ↗
09/30/2026M01254015-P1Open ↗
09/24/2026M00806900-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/02/2026M00680789-I1Open ↗
09/02/2026M00680814-I1Open ↗
09/02/2026M00701495-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/30/2026M01254015-P1Open ↗
09/23/2026M01253866-I1Open ↗
09/23/2026M01254015-I1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment257
▸BISSELF-CERT PLUMBING NOTICE88
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 88 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISSCHEDULE B - PLUMBING41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISEQUIPMENT USE PERMITS32
11/22/2019123142358Open ↗
11/22/2019123142358Open ↗
11/22/2019123142358Open ↗
Showing 3 of 32 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA32
09/24/2020123276196Open ↗
07/11/2019123490775Open ↗
04/15/2019123600549Open ↗
Showing 3 of 32 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
11/25/2019123142358Open ↗
11/25/2019123142358Open ↗
06/24/2019121726613Open ↗
Showing 3 of 17 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST7
04/06/2020122408457Open ↗
10/24/2018123490775Open ↗
10/24/2018123490775Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos110
▸BISASBESTOS: CERTIFICATION (DEP ACP5)66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/02/2026M00680789-I1Open ↗
09/02/2026M00680814-I1Open ↗
09/01/2026M00781278-I1Open ↗
Showing 3 of 14 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance97
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS68
03/04/2020123142358Open ↗
11/19/2019123134651Open ↗
11/19/2019123134651Open ↗
Showing 3 of 68 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
11/19/2019123134651Open ↗
04/15/2019123108984Open ↗
Showing 2 of 18 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
07/24/2019123146933Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/14/2021122177081Open ↗
Showing 1 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs211
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST125
07/29/2022123276196Open ↗
01/27/2021121324156Open ↗
01/22/2021121555058Open ↗
Showing 3 of 125 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE32
09/10/2025121324156Open ↗
08/19/2025121324156Open ↗
12/04/2023121324156Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISCCD1-Construction Code Determination12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership200
▸BISCOST AFFIDAVIT198
04/06/2020122408457Open ↗
11/26/2019123142358Open ↗
11/26/2019123142358Open ↗
Showing 3 of 198 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/27/2022123276196Open ↗
01/27/2021121555058Open ↗
▸Filing & Intake Forms275
▸BISEFILING COVER SHEET115
10/24/2018123490775Open ↗
Showing 1 of 115 on file for this type
▸BISADDITIONAL INFORMATION96
06/14/2021122177081Open ↗
04/06/2020122408457Open ↗
11/21/2019123142358Open ↗
Showing 3 of 96 on file for this type
▸BISBOROUGH INTAKE FORM59
05/01/2020122177081Open ↗
04/06/2020122408457Open ↗
03/06/2020121324156Open ↗
Showing 3 of 59 on file for this type
▸BISeFiling Job Application Cover Sheet5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
07/11/2019123490775Open ↗
06/24/2019121555058Open ↗
12/17/2018123490775Open ↗
Showing 3 of 8 on file for this type
▸BISUnknown7
03/04/2020123142358Open ↗
03/04/2020123142358Open ↗
03/04/2020123142358Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWIRA Certification1
08/17/2026M01405819-I1Open ↗