| Owner | Filings | Most Recent |
|---|---|---|
| CBRE | 43 | 09/30/2026 |
| BROOKFIELD PROPERTIES | 101 | 07/08/2026 |
| SKYLIGHT STUDIOS | 22 | 07/08/2026 |
| PLATFORM SOLUTIONS INC. | 5 | 03/22/2026 |
| BENJAMIN GROUP ENTERPRIS | 1 | 03/22/2026 |
| TRI STATE DISMANTLING CO | 1 | 03/22/2026 |
| TURNER CONST CO | 1 | 03/22/2026 |
| BIG AND TINY VESEY LLC | 1 | 03/22/2026 |
| CUSHMAN & WAKEFIELD | 1 | 03/21/2026 |
| NYMEX | 8 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| YSRAEL A. SEINUK, P.C. | 6 | 08/18/2026 |
| ROBERT DERECTOR ASSOCIATES | 33 | 08/11/2026 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 7 | 08/04/2026 |
| BRYAN NATHANIEL YOUNG ARCHITECTURE, | 4 | 07/24/2026 |
| MRA ENGINEERING P.C. | 1 | 07/17/2026 |
| COSENTINI ASSOCIATES | 2 | 05/12/2026 |
| THORNTON TOMASETTI | 2 | 05/12/2026 |
| WSP | 2 | 05/07/2026 |
| BELLSEY & ASSOCIATES | 1 | 03/24/2026 |
| BKSK ARCHITECTS, LLP | 7 | 08/13/2025 |
| PLAN B ENGINEERING | 1 | 01/17/2025 |
| WELLWORTH CONSULTING LLC | 2 | 02/22/2024 |
| GEE2000 ARCHITECT P.C. | 1 | 01/16/2024 |
| MARCELO BARUJEL ARCHITECT, PC | 1 | 08/22/2023 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 08/07/2023 |
| SYNC ARCHITECTURE P.C | 7 | 09/21/2022 |
| MCLAREN ENGINEERING GROUP | 1 | 08/31/2022 |
| ANDREW FORMICHELLA | 9 | 08/30/2022 |
| TMALIHAN-HAGGER ARCHITECT NYC, LLC. | 7 | 03/30/2022 |
| SCALAR ARCHITECTURE PC | 1 | 11/02/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 63 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 15 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 2 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 2 | 03/21/2026 |
| DVA Advisors | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 10 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM CONSTRUCTION MGMT LLC | General Contractor | 10 | 09/23/2026 |
| STRUCTURE TONE, LLC | General Contractor | 7 | 04/09/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 7 | 07/08/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 6 | 03/21/2026 |
| CJS INDUSTRIES INC | General Contractor | 6 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 5 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| BENJAMIN GROUP ENTERPRIS | General Contractor | 4 | 03/21/2026 |
| CLEAR CONCEPT GROUP LLC | General Contractor | 4 | 07/08/2026 |
| GIOVANNI RENOVATION CORP | General Contractor | 4 | 07/08/2026 |
| PETRETTI & ASSOCIATES LLC | General Contractor | 4 | 07/08/2026 |
| CANTY, III, JAMES | Electrical | 3 | 03/21/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 3 | 03/21/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 3 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| TULLA CONTRACTING CORP | General Contractor | 3 | 03/21/2026 |
| SHIELDS, ROBERT | Electrical | 3 | 03/21/2026 |
| STRIANO, PETER | Electrical | 3 | 03/21/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 3 | 07/08/2026 |
| ARENA EVENT SERVICES INC | General Contractor | 3 | 03/21/2026 |
| ALLAN/BRITE-WAY ELEC'L CO | Electrical | 3 | 03/22/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 2 | 07/08/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TROLYDIA TESTING & INSPEC | 4422 | 2 | 08/18/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 12 | 08/18/2026 |
| AK ENGINEERING PC | 678 | 20 | 03/02/2026 |
| MJ ENGINEERING & DESIGN | 5546 | 2 | 01/18/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 1 | 08/22/2023 |
| BEYOND ARCH LLC | 3600 | 5 | 06/27/2022 |
| TERESA MALIHAN-HAGGERTY A | 1456 | 2 | 03/30/2022 |
| AR-TECH ENGINEERING, P.C. | 6659 | 1 | 11/05/2021 |
| PROJECT TACTICAL SOLUTION | 5859 | 3 | 09/27/2021 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 2 | 05/20/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | SUMMIT INTERIORS, INC | 09/29/2026 |
| DOB NOW | General Construction | Permit Issued | SUMMIT INTERIORS, INC | 09/29/2026 |
| DOB NOW | Foundation | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/22/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/22/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/21/2026 |
| DOB NOW | Support of Excavation | Permit Issued | TRIUMPH CONSTRUCTION CORP | 09/21/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 05/04/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 03/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | BH DESIGN GROUP LLC | 03/09/2026 |
| DOB NOW | General Construction | Signed-off | BH DESIGN GROUP LLC | 03/09/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 07/16/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 05/20/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 05/07/2025 |
| DOB NOW | Plumbing | Signed-off | LAB PLBG & HTG CO INC | 05/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 05/02/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 05/02/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 03/24/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 02/03/2025 |
| DOB NOW | Supported Scaffold | Signed-off | PLATFORM SOLUTIONS, INC | 01/22/2025 |
| DOB NOW | General Construction | Signed-off | BENJAMIN GROUP ENTERPRIS | 06/13/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 02/22/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 02/22/2024 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 02/21/2024 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 02/16/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | BENJAMIN MAINTENANCE | 02/14/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 02/14/2024 |
| DOB NOW | General Construction | Signed-off | GIOVANNI RENOVATION CORP | 01/29/2024 |
| DOB NOW | Mechanical Systems | Signed-off | GIOVANNI RENOVATION CORP | 01/24/2024 |
| DOB NOW | General Construction | Signed-off | BENJAMIN GROUP ENTERPRIS | 12/11/2023 |
| DOB NOW | General Construction | Signed-off | CLEAR CONCEPT GROUP LLC | 12/06/2023 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 10/02/2023 |
| DOB NOW | General Construction | Signed-off | CLEAR CONCEPT GROUP LLC | 08/28/2023 |
| DOB NOW | General Construction | Signed-off | ARENA EVENT SERVICES INC | 09/23/2022 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 09/08/2022 |
| DOB NOW | Plumbing | Signed-off | OZERY PLBG & HTG INC | 08/11/2022 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 04/28/2022 |
| DOB NOW | General Construction | Permit Issued | CJS INDUSTRIES INC | 04/22/2022 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 04/18/2022 |
| DOB NOW | Plumbing | Signed-off | PETER MICELI PLUMBING | 03/09/2022 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 02/04/2022 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | — | — | — |
| 03/02/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/11/2026 | Signed-off | EVERGREEN MECHANICAL CORP | Water/Sanitary |
| 03/02/2026 | — | — | — |
| 07/30/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/08/2026 | Permit Issued | HUGH O'KANE ELEC. CO. INC | General Wiring |
| 06/02/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/04/2025 | Complete | ALLAN/BRITE-WAY ELEC'L CO | General Wiring |
| 01/27/2025 | Permit Issued | FALCO ELEC'L SERVICES INC | General Wiring |
| 05/03/2024 | Complete | INDY ELECTRIC CORP. | General Wiring |
| 03/18/2024 | Complete | TOP SHELF ELECTRIC CORP | — |
| 01/30/2024 | Complete | ALLAN/BRITE-WAY ELEC'L CO | General Wiring |
| 04/16/2022 | Complete | CEDAR ELEC'L CONT'RS INC. | General Wiring |
| 02/10/2022 | Complete | EMANON ELECTRIC INC. | General Wiring |
| 09/10/2021 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 05/28/2021 | Complete | TRIBORO ELEC'L CONTR'G CO | Lighting |
| 04/06/2021 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 02/19/2021 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 10/09/2020 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 07/01/2020 | Complete | HUGH O'KANE ELEC. CO. INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Steel |
| 08/11/2026 | Permit Issued | SUMMIT INTERIORS, INC | 1 scope_items |
| 07/17/2026 | Permit Issued | TRIUMPH CONSTRUCTION CORP | 1 scope_items |
| 05/12/2026 | — | — | Steel, Concrete |
| 07/30/2025 | Signed-off | STRUCTURE TONE, LLC | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/19/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/17/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/14/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/14/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 03/31/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/24/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/25/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/03/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/07/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/19/2026 | Concrete - Cast-In-Place | JONAR MADRIAGA | special |
| 08/19/2026 | Footing and Foundation | JONAR MADRIAGA | progress |
| 08/19/2026 | Subsurface Conditions – Fill Placement & In-Place Density | EDWARD TOROSSIAN | special |
| 08/19/2026 | Structural Steel - Details | JONAR MADRIAGA | special |
| 08/19/2026 | Structural Steel - High Strength Bolting | JONAR MADRIAGA | special |
| 08/19/2026 | Structural Steel - Welding | JONAR MADRIAGA | special |
| 08/19/2026 | Final | JONAR MADRIAGA | progress |
| 08/19/2026 | Subsurface Investigations (Borings/Test Pits) | Ahmed Abdelmohsen | special |
| 08/19/2026 | Structural Stability – Alterations of existing buildings | JONAR MADRIAGA | special |
| 08/19/2026 | Subgrade Inspections | EDWARD TOROSSIAN | special |
| 08/18/2026 | Structural Steel - Details | JONAR MADRIAGA | special |
| 08/18/2026 | Concrete - Cast-In-Place | JONAR MADRIAGA | special |
| 08/18/2026 | Footing and Foundation | JONAR MADRIAGA | progress |
| 08/18/2026 | Final | JONAR MADRIAGA | progress |
| 08/18/2026 | Subsurface Investigations (Borings/Test Pits) | Ahmed Abdelmohsen | special |
| 08/18/2026 | Subsurface Conditions – Fill Placement & In-Place Density | EDWARD TOROSSIAN | special |
| 08/18/2026 | Subgrade Inspections | EDWARD TOROSSIAN | special |
| 08/18/2026 | Structural Steel - Welding | JONAR MADRIAGA | special |
| 08/18/2026 | Structural Steel - High Strength Bolting | JONAR MADRIAGA | special |
| 08/18/2026 | Structural Stability – Alterations of existing buildings | JONAR MADRIAGA | special |
| 07/29/2026 | Fenestration areas | — | energy_progress |
| 07/29/2026 | Fenestration air leakage | — | energy_progress |
| 07/29/2026 | Vestibules | — | energy_progress |
| 07/29/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 07/14/2026 | Preliminary | NEIL GREENBLATT | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Galaxy Digital | Office | — | Project M01418136 |
| Hutch & Waldo | Restaurant / Food Service | Floor 1 | Project M00908532 |
| Tom Ford | Retail | Floor 3 | Project M07994981 |
| EH Exhibition Hub - Edutainment | Other | — | Project M00667268 |
| Van Gogh: The Immersive Experience | Other | — | Project M00649678 Project M00565735 Project M00523515 |
| Big and Tiny | Retail | Ground, Floor 1 | Project M00562876 Project M00606153 Project M00606084 |
| Van Gogh Exhibit | Other | Floor 3 | Project M00517705 |
| Momentum World Wide | Office | Floor 14 | Project M00483192 |