Elevator cooperative
102 WEST 85 STREET
MANHATTAN · BIN 1032131
💬 Discuss this project
1931Year Built
12Stories
D4Building Class
C1-8AZoning
64,429 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized22 Open Violations ▸FISP: SAFE
Elevator cooperative · 7,152 sf lot · 9.01 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1108/28/2026
102 WEST 85TH ST2007/08/2026
PRAT ENTERPRISES1707/08/2026
HKS CONSTRUCTION804/09/2026
102 W 85 ST LTD C/O MIDBO203/22/2026
102 WEST 85TH3903/21/2026
205 WEST END AVENUE OWNERS203/21/2026
C O MIDBORO MANAGEMENT203/21/2026
102 WEST 85203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC303/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
S M EXPEDITING403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor1707/08/2026
BEDNARZ CONSTRUCTION LLCGeneral Contractor603/21/2026
NEW AMSTERDAM BUILDERS LLGeneral Contractor303/21/2026
HKS CONSTRUCTION CORPGeneral Contractor204/09/2026
LINES, EDWARDElectrical103/21/2026
MATHURA, MACLEANElectrical103/21/2026
YLL LOXHAJElectrical103/21/2026
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor108/06/2026
TRI-STATE MARBLE & TILE CGeneral Contractor107/08/2026
A.M.N. CORPORATIONPlumbing107/08/2026
M&M PLUMBING & HEATING INPlumbing107/08/2026
AMSTERDAM ELECTRIC CORPElectrical103/22/2026
NEW AMSTERDAM PLBG & HTGPlumbing107/08/2026
ANTHONY CIRRINCIONEElectrical103/21/2026
EMCO ELECTRIC SVCS LLCElectrical103/22/2026
GLEICH, BERNARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CORTNEY WALLESTON ARCHITE3881108/17/2026
OUTSOURCE SPECIAL INSPECT2827107/24/2026
CNY ENGINEERING P.C3304207/29/2024
A2 ARCHITECTURE2736108/29/2023
ANDREW FRANZ ARCHITECT, P2384203/17/2022
MERRITT ENGINEERING CONSU460111/10/2021
Building Lifecycle
All (168)Filed (14)Permit Issued (19)Signed Off (11)Facade (FISP) (22)Violation (60)Inspection (9)Objection (8)Special Inspection (25)
08/26/2026
Objection resolved — Addressed
08/26/2026
Objection resolved — Addressed
08/26/2026
Objection resolved — Addressed
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Scope
08/17/2026
Filed — Alteration
Interior renovation to existing apartment 2c. Replacement cabinetry, finishes, minor non load bearing partition modifications.
M01443128-I1
08/05/2026
Permit issued — General Construction
M01397580-I1-GC-CX
07/24/2026
Filed — Alteration
REAR COURTYARD RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01397580-I1
05/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
05/18/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
05/18/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
05/18/2026
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
05/18/2026
Special inspection requirement — Masonry
JONAR MADRIAGA
05/05/2026
Special inspection requirement — Final
Nicholas Ferrara
10/24/2025
Signed off — Alteration
M00001818-I1
07/18/2025
Signed off — Alteration
Modification of plumbing fixtures in unit 10C as shown on submitted plans. No change in occupancy, use or egress.
M01042559-I1
07/18/2025
Signed off — Alteration
Interior renovation of unit 10C as shown on submitted plans. No change in occupancy, use or egress.
M01042554-I1
07/16/2025
Violation issued (HPD, closed)
C
07/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2024
Signed off — Alteration
Combine apartments under TTPN 3/97. Remove kitchen and replace with laundry. New finishes at existing kitchen. Refinish floor, minor partition work.
M00858721-S1
10/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2024
Signed off — Alteration
Combine apartments under TTPN 3/97. Remove kitchen and replace with laundry. New finishes at existing kitchen. Refinish floor, minor partition work.
M00858721-I1
08/29/2024
Permit issued — Plumbing
M01042559-I1-PL
08/28/2024
Permit issued — General Construction
M01042554-I1-GC
07/29/2024
Filed — Alteration
Modification of plumbing fixtures in unit 10C as shown on submitted plans. No change in occupancy, use or egress.
M01042559-I1
07/29/2024
Filed — Alteration
Interior renovation of unit 10C as shown on submitted plans. No change in occupancy, use or egress.
M01042554-I1
07/29/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/26/2024
Special inspection requirement — Interior lighting power
YUE ZHOU
04/26/2024
Special inspection requirement — Lighting in dwelling units
YUE ZHOU
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
04/26/2024
Special inspection requirement — Final
YUE ZHOU
04/26/2024
Special inspection requirement — Energy Code Compliance Inspections
YUE ZHOU
04/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
YUE ZHOU
04/26/2024
Special inspection requirement — Lighting controls
YUE ZHOU
04/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
YUE ZHOU
04/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
YUE ZHOU
03/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Permit issued — Plumbing
M00858721-S1-PL
02/06/2024
Permit issued — General Construction
M00858721-I1-GC
10/17/2023
Signed off — Alteration
Installation of a temporarily material hoist as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00708232-I1
10/17/2023
Signed off — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00680822-I1
10/17/2023
Signed off — Alteration
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00708177-I1
08/29/2023
Filed — Alteration
Combine apartments under TTPN 3/97. Remove kitchen and replace with laundry. New finishes at existing kitchen. Refinish floor, minor partition work.
M00858721-S1
08/29/2023
Filed — Alteration
Combine apartments under TTPN 3/97. Remove kitchen and replace with laundry. New finishes at existing kitchen. Refinish floor, minor partition work.
M00858721-I1
08/18/2023
Special inspection requirement — Final
Anna Abramowicz
08/10/2023
Cycle 9 facade report signed — SAFE
06/15/2023
Cycle 9 facade report submitted
05/18/2023
Cycle 9 facade inspection completed
04/14/2023
Permit issued — General Construction
M00616172-I1-GC
04/14/2023
Special inspection requirement — Lighting controls
Anna Abramowicz
04/14/2023
Special inspection requirement — Lighting in dwelling units
Anna Abramowicz
04/14/2023
Special inspection requirement — Interior lighting power
Anna Abramowicz
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anna Abramowicz
03/28/2023
Permit issued — Protection and Mechanical Methods
M00708232-I1-PM
03/28/2023
Permit issued — Sidewalk Shed
M00680822-I1-SH
03/28/2023
Permit issued — Supported Scaffold
M00708177-I1-SF
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT08/05/2026
DOB NOWPlumbingSigned-offM&M PLUMBING & HEATING IN08/29/2024
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM BUILDERS LL08/28/2024
DOB NOWPlumbingSigned-offA.M.N. CORPORATION03/01/2024
DOB NOWGeneral ConstructionSigned-offTRI-STATE MARBLE & TILE C02/06/2024
DOB NOWGeneral ConstructionPermit IssuedPRAT ENTERPRISES CORP04/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP03/28/2023
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP03/28/2023
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP03/28/2023
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP02/06/2023
DOB NOWMechanical SystemsSigned-offBEDNARZ CONSTRUCTION LLC05/13/2022
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS05/13/2022
DOB NOWGeneral ConstructionSigned-offBEDNARZ CONSTRUCTION LLC05/13/2022
DOB NOWGeneral ConstructionPermit IssuedPRAT ENTERPRISES CORP04/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP03/30/2022
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP03/30/2022
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP02/17/2022
DOB NOWSupported ScaffoldSigned-offHKS CONSTRUCTION CORP03/07/2018
DOB NOWSupported ScaffoldSigned-offHKS CONSTRUCTION CORP11/03/2017
BISMHISSUEDN/A10/06/2020
BISOTISSUEDSTRIDE BUILDERS CORP06/07/2019
BISMHISSUEDSTRIDE BUILDERS CORP03/28/2019
BISOTISSUEDSTRIDE BUILDERS CORP10/18/2018
BISOTISSUEDDANCONIA MANAGEMENT LLC09/04/2018
BISEQISSUEDHKS CONSTRUCTION CORP05/31/2018
BISPLISSUEDORBIT PLBG & HTG INC03/21/2018
BISOTISSUEDSTRIDE BUILDERS CORP03/15/2018
BISPLISSUEDABR PLBG&HTG CONTR INC03/02/2018
BISOTISSUEDDANCONIA MANAGEMENT LLC01/29/2018
BISPLISSUEDAPOLLO PLBG & HTG INC04/18/2017
BISOTISSUEDJUNO CONTRACTING CORP03/22/2017
BISOTISSUEDNUZA HOME IMPROVEMENT COR03/03/2017
BISEQISSUEDHKS CONSTRUCTION CORP02/06/2017
BISOTISSUEDJUNO CONTRACTING CORP03/26/2015
BISOTISSUEDJUNO CONTRACTING CORP08/29/2014
BISPLISSUEDORBIT PLBG & HTG INC06/09/2014
BISOTISSUEDGREZEGORZ CZYZEWSKI06/06/2014
BISEQISSUEDEVEREST SCAFFOLDING INC09/20/2012
BISEQISSUEDJUNO CONTRACTING CORP08/24/2012
BISOTISSUEDJUNO CONTRACTING CORP08/10/2012
+ 29 more permits on file
14 projects · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
10/05/2024CompleteEMCO ELECTRIC SVCS LLCGeneral Wiring
05/08/2024CompletePRESTIGE ELECL CONTG CORPGeneral Wiring
02/06/2023CompleteLIFE SPOT ELECTRIC CORPGeneral Wiring
09/03/2022CompleteINFINITI ELECTRIC CORPGeneral Wiring
08/17/2022Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
08/04/2022CompleteSOLAS ELECTRICAL CONTRACT2 meters, 1 new_meters
05/12/2022CompleteSOLAS ELECTRICAL CONTRACTGeneral Wiring
02/18/2022CompleteSTEVEN FARKAS—
11/09/2020CompletePOWERONE ELECT'L CONTRG13 meters, 1 new_meters
06/17/2019CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
12/02/2018CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
03/27/2018CompletePAUL'S ELECTRIC INCGeneral Wiring
02/20/2018CompleteBASS ELECTRICAL CORP.General Wiring
1 project · most recent 07/24/2026
Steel
FiledStatusContractorScope
07/24/2026Permit IssuedCENTRAL CONSTRUCTION MANASteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/26/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
05/18/2026Post-installed AnchorsJONAR MADRIAGAspecial
05/18/2026Structural Steel - DetailsJONAR MADRIAGAspecial
05/18/2026Structural Steel - WeldingJONAR MADRIAGAspecial
05/18/2026MasonryJONAR MADRIAGAspecial
05/05/2026FinalNicholas Ferraraprogress
04/26/2024Interior lighting powerYUE ZHOUenergy_progress
04/26/2024Lighting in dwelling unitsYUE ZHOUenergy_progress
04/26/2024Fire-Resistant Penetrations and JointsYUE ZHOUspecial
04/26/2024FinalYUE ZHOUprogress
04/26/2024Energy Code Compliance InspectionsYUE ZHOUprogress
04/26/2024Fire-Resistance Rated ConstructionYUE ZHOUprogress
04/26/2024Lighting controlsYUE ZHOUenergy_progress
04/26/2024Tenant Protection Plan ComplianceYUE ZHOUspecial
04/26/2024Tenant Protection Plan ComplianceYUE ZHOUspecial
08/18/2023FinalAnna Abramowiczprogress
04/14/2023Lighting controlsAnna Abramowiczenergy_progress
04/14/2023Lighting in dwelling unitsAnna Abramowiczenergy_progress
04/14/2023Interior lighting powerAnna Abramowiczenergy_progress
04/14/2023Fire-Resistant Penetrations and JointsAnna Abramowiczspecial
01/12/2022Fire-Resistant Penetrations and JointsAndrew Franzspecial
01/12/2022FinalAndrew Franzprogress
01/12/2022Fire-Resistant Penetrations and JointsAndrew Franzspecial
11/29/2021Mechanical SystemsAndrew Franzspecial
11/29/2021FinalAndrew Franzprogress
▾Documents — 316 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/06/2026M00001818-I1Request digital key ↗
09/03/2026M00616172-I1Request digital key ↗
09/02/2026M00680822-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits63
▸BISWORK PERMIT APPLICATION31
10/06/2020123721035Open ↗
06/13/2019123721035Open ↗
06/07/2019123721035Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION23
05/29/2019123112434Open ↗
05/17/2019123721035Open ↗
02/14/2019123198823Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit9
09/26/2026M01443128-I1Open ↗
09/02/2026M00638682-I1Open ↗
09/02/2026M00645836-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
06/04/2019123112434Open ↗
05/17/2019123721035Open ↗
05/17/2019123721035Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/26/2026M01443128-I1Open ↗
09/03/2026M00616172-I1Open ↗
09/02/2026M00638682-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026M01042559-I1Open ↗
08/31/2026M01042554-I1Open ↗
08/31/2026M01042554-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026M01042554-I1Open ↗
08/31/2026M01042554-I1Open ↗
08/31/2026M01042554-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/20/2016122771018Open ↗
02/16/2012120978371Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/16/2012120978371Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/03/2017140601301Open ↗
10/20/2016122771018Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/03/2017140601301Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/03/2017140601301Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
05/17/2019123721035Open ↗
09/06/2018123400952Open ↗
06/12/2018123198823Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
05/26/2015121985851Open ↗
07/29/2014121985851Open ↗
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/14/2021123721035Open ↗
04/07/2021123721035Open ↗
▸BISEQUIPMENT USE PERMITS2
04/14/2021123721035Open ↗
04/07/2021123721035Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes6
05/17/2019123721035Open ↗
09/06/2018123400952Open ↗
01/18/2018123198823Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/26/2026M01443128-I1Open ↗
09/03/2026M00616172-I1Open ↗
09/02/2026M00638682-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
05/17/2019123721035Open ↗
09/06/2018123400952Open ↗
01/30/2018123198823Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/16/2012120978371Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/10/2017122968930Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
09/06/2018123400952Open ↗
06/22/2018121801719Open ↗
06/22/2018122771018Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/17/2019123400952Open ↗
06/22/2018121801719Open ↗
06/22/2018122771018Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
01/18/2018123198823Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/07/2021123721035Open ↗
02/03/2017140601301Open ↗
▸Approvals, Objections & Sign-offs38
▸BISLANDMARKS APPROVAL12
06/04/2019123112434Open ↗
01/30/2018123198823Open ↗
03/10/2017122968930Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
04/07/2021123721035Open ↗
06/04/2019123112434Open ↗
04/17/2019123400952Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/14/2019123198823Open ↗
06/22/2018121801719Open ↗
06/22/2018122771018Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/16/2012120978371Open ↗
Showing 1 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
04/07/2021123721035Open ↗
06/22/2018121801719Open ↗
06/22/2018122771018Open ↗
▸BISSUPERSEDING LETTER1
10/25/2018123112434Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
04/07/2021123721035Open ↗
06/04/2019123112434Open ↗
05/17/2019123721035Open ↗
Showing 3 of 22 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
03/16/2018123198823Open ↗
03/10/2017122968930Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET12
05/17/2019123721035Open ↗
09/06/2018123400952Open ↗
01/18/2018123198823Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM10
06/04/2019123112434Open ↗
05/29/2019123112434Open ↗
04/17/2019123400952Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION9
02/09/2021123721035Open ↗
05/31/2019123721035Open ↗
05/31/2019123721035Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/03/2017140601301Open ↗
▸Other Documents4
▸DOB NOWProof of Historic Building3
09/02/2026M00638682-I1Open ↗
09/02/2026M00645836-I1Open ↗
08/13/2026M00638673-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/18/2018123112434Open ↗