← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Lincoln Square Condominium
111 WEST 67TH STREET · BIN 1084564
💬 Discuss this project
1992Year Built
47Stories
RMBuilding Class
C4-7Zoning
706,837 sfGross Floor Area
279Units
LL97 CoveredRent Stabilized1 Active Violation 8 likely answered 2 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 55,462 sf lot · 12.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYUL Heath Upper West Side Ambulatory Center, MillenniumUnder Construction67p · 13 filings · 20 docs
BulkheadFacade, roof, and bulkhead enclosure restorationUnder Construction5p · 2 filings · 20 docs
PenthouseUnit PH1, Unit PH1D, Unit PH2A +22p · 2 filings · 20 docs
Floor 47Unit 47B7p · 2 filings · 18 docs
Floor 46Unit 48C, Unit 48DEUnder Construction58p · 6 filings · 20 docs
Floor 457p · 2 filings · 9 docs
Floor 44Unit 44A14p · 3 filings · 20 docs
Floor 43Unit 43A, Unit 43B, Unit 43F18p · 3 filings · 20 docs
Floor 42
Floor 41
Floor 40
Floor 39Plumbing fixture replacement, 38th and 39th floors4p · 1 filing · 2 docs
Floor 38Plumbing fixture replacement, 38th and 39th floors6p · 2 filings · 20 docs
Floor 37
Floor 36
Floor 35Plumbing work for apartment renovation3p · 1 filing · 8 docs
Floor 34
Floor 33
Floor 32
Floor 31Unit 31E, Unit 31FUnder Construction23p · 3 filings · 20 docs
Floor 30
Floor 29Unit 29E6p · 2 filings · 6 docs
Floor 28
Floor 27Unit 27C3p · 2 filings · 6 docs
Floor 26
Floor 25Unit 25B, Unit 25DUnder Construction10p · 2 filings · 11 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20Unit 20E, Unit 20F7p · 1 filing · 20 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 107p · 1 filing · 20 docs
Floor 9
Floor 8NYUL Heath Upper West Side Ambulatory Center9p · 1 filing · 20 docs
Floor 7AMC TheaterUnder Construction20p · 3 filings · 19 docs
Floor 6Mechanical ductwork demolition and installation10p · 1 filing · 13 docs
Floor 5Mechanical ductwork demolition and installation10p · 1 filing · 13 docs
Floor 4Clean Market15p · 2 filings · 20 docs
Floor 3The Wonder Brookfield PlaceUnder Construction20p · 3 filings · 18 docs
Floor 2Mechanical ductwork demolition and installation10p · 1 filing · 13 docs
Floor 1NYUL Heath Upper West Side Ambulatory Center, Millennium +1Under Construction266p · 18 filings · 20 docs
MezzanineMechanical ductwork demolition and installation12p · 1 filing · 13 docs
CellarNYUL Heath Upper West Side Ambulatory Center, MillenniumUnder Construction242p · 12 filings · 20 docs
Sub-CellarNYUL Heath Upper West Side Ambulatory Center, MillenniumUnder Construction246p · 12 filings · 20 docs
Site & exteriorEquinox, AMC TheaterUnder Construction66p · 16 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Millennium Partners7003/21/2026
W.S. Triangle5303/21/2026
BHS1307/08/2026
Lockerwood1003/21/2026
Mapp1003/21/2026
Park Mill 438603/21/2026
94th & Park Avenue603/21/2026
Equinox507/08/2026
Hamilton Investment503/21/2026
Showtrut Design403/21/2026
101 West 67 Esty203/21/2026
Lindan203/21/2026
Twig67203/21/2026
Canfield Enterprises203/21/2026
Nguyen203/21/2026
Rockport203/21/2026
Lendlease103/22/2026
Signature Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Interior ManagementGeneral Contractor1707/08/2026
S&E Bridge & ScaffoldScaffold1207/08/2026
Spring ScaffoldingScaffold1007/08/2026
Tishman ConstructionGeneral Contractor907/08/2026
King Construction GPGeneral Contractor807/08/2026
Prat EnterprisesScaffold807/08/2026
Preferred Sprinkler and MechanicalFire Protection507/08/2026
GreenlaneGeneral Contractor507/08/2026
Henry Myers P & HPlumbing407/08/2026
Baba ConstructionGeneral Contractor407/08/2026
Prat EnterprisesGeneral Contractor407/08/2026
L&K PartnersGeneral Contractor407/08/2026
Palladian ConstructionGeneral Contractor407/08/2026
Lit GroupGeneral Contractor407/08/2026
CCS. Custom ConstructionGeneral Contractor303/21/2026
Arista Air Conditioningspecialty_contractor307/08/2026
Ceprine ConstructionScaffold303/21/2026
Intersystems Installation S&SScaffold303/21/2026
Platform SolutionsScaffold303/21/2026
Berdynaj ConstructionGeneral Contractor303/21/2026
Eco Electrical ServcsElectrical303/22/2026
P.S. Marcato Elev. CoElectrical303/21/2026
Four Star Air Con'd CoGeneral Contractor207/08/2026
Frank Torrone & SonsElectrical203/21/2026
R.G.M. SignsSign hanger207/08/2026
NY City PlumberPlumbing207/08/2026
Darby Construction ServiceGeneral Contractor207/08/2026
Tri-State DismantlingScaffold203/21/2026
Five Town Neon Sign CoSign hanger210/04/2026
P.S.I. MechanicalPlumbing207/08/2026
TriworksGeneral Contractor207/08/2026
Raptor MechanicalPlumbing207/08/2026
Campa ConstructionGeneral Contractor203/21/2026
Great Interior RenovationsGeneral Contractor208/14/2026
Aqueduct MechanicalPlumbing207/08/2026
MCM Plumbing & HeatingPlumbing107/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Orbit SprinklerFire Protection107/08/2026
PSI PartnersFire Protection107/08/2026
Reliable Plumbing & HeatingPlumbing107/08/2026
Village P & H NYPlumbing107/01/2026
Ideal Electric & HVAC CoElectrical103/21/2026
WaterfirePlumbing107/08/2026
All City ElectricalElectrical103/21/2026
Aurora Electrical ContgElectrical103/22/2026
Bonaiuto AnthonyElectrical103/21/2026
Essex ElectricElectrical103/22/2026
Horsepower ElectricElectrical103/22/2026
Joseph Sgroi & SonsElectrical103/21/2026
L.J.F. & Sons Electrical ContsElectrical103/22/2026
New York Empire Electrical ConElectrical103/22/2026
Prestige Electrical ContgElectrical103/22/2026
R.C.M. ElectricElectrical103/21/2026
Star Electrical ContractorsElectrical103/22/2026
Tuxedo Electrical ContractingElectrical103/22/2026
WTG ElectricElectrical103/22/2026
Atrium ConstructionsGeneral Contractor107/08/2026
Bluetec Cabinetryspecialty_contractor107/08/2026
BNJ ConstructionGeneral Contractor104/09/2026
Chief Fire Prevention & MechanicalGeneral Contractor107/08/2026
E-Line Mechanicalspecialty_contractor107/08/2026
Fiocchi GroupGeneral Contractor110/16/2026
Frazier & Sons ConstructionGeneral Contractor106/28/2026
LW Interior RemodelingGeneral Contractor104/09/2026
Meathway ContractingGeneral Contractor104/09/2026
New Regal ConstructionGeneral Contractor110/21/2026
Silverlining InteriorsGeneral Contractor107/08/2026
Titan Industrial ServiceGeneral Contractor107/08/2026
Interboro Sign & Electrical MaintenanceSign hanger107/08/2026
Accurate MechanicalPlumbing107/08/2026
Aggressive Fire ProtectionFire Protection107/08/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Astoria P & HPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
Doval Plumbing & HeatingPlumbing108/16/2026
Master Tech PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4231409/16/2026
City-Wide Testing416109/14/2026
Ryan Special Engineering2018206/09/2026
Portell Architecture5332106/08/2026
Obaid Mian849204/21/2026
Amka & Associates8239103/25/2026
Outsource Special Inspection2827602/09/2026
EP Inspections and Commis7079408/15/2025
Urban Integrations7993607/29/2025
Rad Design & Architecture2082106/19/2025
MEP Inspections1102106/10/2025
Ancora Engineering6818106/10/2025
Spivak Architects6957206/10/2025
Catalpa Special Inspectio2004106/05/2025
New Age Engineering7746304/23/2025
Levin Engineering1267103/20/2025
TSF Engineering1274102/24/2025
EC Special Inspections8355211/06/2024
Hansen Engineering8174902/02/2024
Michael Zenreich Architects1724201/03/2024
Fradkin Cooper Architects9786106/30/2023
Norman C. Lok818406/30/2023
Pulltab Design3110205/31/2023
MW Professional Engineering570502/03/2023
Architecture Work2410107/06/2022
Richard H. Balser Engineering3028805/26/2022
Hottenroth & Joseph Architects1160210/25/2021
NS Engineers1442105/12/2020
B2 Engineering5433103/11/2020
Abs Engineering4835203/10/2020
Building Lifecycle
All (300)Filed (67)Permit Issued (77)Signed Off (39)Violation (2)Inspection (45)Objection (40)Special Inspection (30)
10/20/2026
Permit issued — General Construction
M01451025-I1-GC
10/15/2026
Permit issued — General Construction
M01401006-I1-GC
09/16/2026
Filed — Alteration CO
HEREWITH FILING FOR INTERIOR RENOVATIONS FOR THE CONVERSION TO A MEDICAL CARE OFFICE (B OCCUPANCY) AS PER PLANS.
M08049661-P2
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
09/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
09/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/14/2026
Filed — Alteration
RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 3RD FLOOR OF AN EXISTING COMMERCIAL BUILDING. CONSTRUCTION TO INCLUDE DEMOLITION OF NONBEARING INTERIOR WALLS, DOORSAND FINISHES AND THE CONSTRUCTION OF NONBEARING INTERIOR PARTITIONS, DOORS, FINISHES,
M01451025-I1
09/08/2026
Permit issued — Sign
M01441295-I1-SG
09/08/2026
Permit issued — Sign
M01441255-I1-SG
09/03/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED SIGN ON THE CANOPY ( NYU LANGONE HEALTH)
M01441295-I1
09/03/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED SIGN ON THE CANOPY ( NYU LANGONE HEALTH)
M01441255-I1
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/27/2026
Special inspection requirement — Interior lighting power
Benjamin Feiger
08/27/2026
Special inspection requirement — Lighting controls
Benjamin Feiger
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/25/2026
Special inspection requirement — Final
Benjamin Feiger
08/18/2026
Signed off — Alteration
Installation of a temporary work platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01336449-I1
08/14/2026
Permit issued — Plumbing
M01247854-S1-PL
08/14/2026
Inspection — Pass General Construction Non-Directive 14
Pass
View inspection ↗
08/13/2026
Permit issued — General Construction
M01247854-I1-GC
08/13/2026
Permit issued — Mechanical Systems
M01247854-S2-MS
08/05/2026
Violation issued (ECB, open)
Elevators
08/05/2026
Special inspection requirement — Final
LEON SKVIRSKY
08/05/2026
Special inspection requirement — Final
LEON SKVIRSKY
08/04/2026
Signed off — Alteration
STRUCTURAL MODIFICATIONS TO REINFORCE STRUCTURE AT LOCATION OF HATCH DOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01359296-I1
07/10/2026
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS BANNER FOR EQUINOX
M01329665-I1
07/06/2026
Permit issued — Mechanical Systems
M01180799-I1-MS
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Randall Goya
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/29/2026
Special inspection requirement — Post-installed Anchors
William Ryan
06/29/2026
Special inspection requirement — Lighting in dwelling units
Randall Goya
06/29/2026
Special inspection requirement — Final
Randall Goya
06/29/2026
Special inspection requirement — Interior lighting power
Randall Goya
06/24/2026
Signed off — Alteration
M01281315-I1
06/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Filed — Alteration
REMOVE PARTITIONS & FINISHES, INSTALL NEW PARTITIONS & FINISHES. NEW DROPPED DRYWALL CEILINGS WITH POST-INSTALLED ANCHOR SYSTEMS. KITCHEN RELOCATED TO WET BAR LOCATION. LAUNDRY ROOM TO BE MOVED TO KITCHEN LOCATION. No Change of use, egress, or occupancy.
M01311455-P1
06/09/2026
Filed — Alteration
Replace bathroom fixtures in existing locations. Relocate existing kitchen plumbing fixtures to new locations, cap and remove the gas range. No change of use, egress, or occupancy under this application
M01311945-P1
06/09/2026
Objection resolved — Addressed
06/09/2026
Special inspection requirement — Final
Randall Goya
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Randall Goya
06/09/2026
Special inspection requirement — Lighting in dwelling units
Randall Goya
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/09/2026
Special inspection requirement — Post-installed Anchors
William Ryan
06/09/2026
Special inspection requirement — Interior lighting power
Randall Goya
06/08/2026
Filed — Alteration
INTERIOR RENOVATION TO COMBINE APARTMENTS 48C &48DE ON THE 46TH FLOOR PER NYC DOB TPPN#3 OF 1997. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
M01401006-I1
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Portell
06/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/18/2026
Permit issued — Sprinklers
M00833558-I1-EW-SD
05/18/2026
Permit issued — Sprinklers
M00833558-I1-EW-SP
05/12/2026
Permit issued — Mechanical Systems
M01383192-I1-MS
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Portell
05/12/2026
Special inspection requirement — Final
Paul Portell
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNew Regal Construction10/20/2026
DOB NOWGeneral ConstructionPermit IssuedFiocchi Group10/15/2026
DOB NOWSignPermit IssuedFive Town Neon Sign Co09/08/2026
DOB NOWSignPermit IssuedFive Town Neon Sign Co09/08/2026
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating08/14/2026
DOB NOWGeneral ConstructionPermit IssuedGreat Interior Renovations08/13/2026
DOB NOWMechanical SystemsPermit IssuedGreat Interior Renovations08/13/2026
DOB NOWMechanical SystemsPermit IssuedKing Construction GP07/06/2026
DOB NOWSprinklersPermit IssuedPreferred Sprinkler and Mechanical05/18/2026
DOB NOWStandpipePermit IssuedPreferred Sprinkler and Mechanical05/18/2026
DOB NOWMechanical SystemsPermit IssuedArista Air Conditioning05/12/2026
DOB NOWGeneral ConstructionSigned-offPrat Enterprises05/08/2026
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance04/10/2026
DOB NOWStructuralSigned-offTishman Construction03/17/2026
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises03/04/2026
DOB NOWMechanical SystemsSigned-offTishman Construction02/18/2026
DOB NOWPlumbingPermit IssuedVillage P & H NY02/03/2026
DOB NOWMechanical SystemsPermit IssuedKing Construction GP02/03/2026
DOB NOWGeneral ConstructionPermit IssuedFrazier Sons Construction01/28/2026
DOB NOWProtection and Mechanical MethodsSigned-offCeprine Construction01/09/2026
DOB NOWGeneral ConstructionPermit IssuedTishman Construction12/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions09/04/2025
DOB NOWMechanical SystemsSigned-offDarby Construction Service08/22/2025
DOB NOWGeneral ConstructionSigned-offDarby Construction Service08/22/2025
DOB NOWGeneral ConstructionSigned-offKing Construction GP08/20/2025
DOB NOWMechanical SystemsPermit IssuedArista Air Conditioning08/12/2025
DOB NOWGeneral ConstructionSigned-offBNJ Construction07/30/2025
DOB NOWPlumbingSigned-offAstoria P & H07/28/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler07/10/2025
DOB NOWGeneral ConstructionSigned-offTitan Industrial Service06/26/2025
DOB NOWGeneral ConstructionSigned-offLW Interior Remodeling06/23/2025
DOB NOWConstruction FenceSigned-offIntersystems Installation S&S06/06/2025
DOB NOWSprinklersPermit IssuedPreferred Sprinkler and Mechanical05/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrat Enterprises05/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrat Enterprises05/01/2025
DOB NOWSupported ScaffoldSigned-offPrat Enterprises05/01/2025
DOB NOWSidewalk ShedSigned-offPrat Enterprises04/30/2025
DOB NOWSuspended ScaffoldSigned-offPrat Enterprises04/25/2025
DOB NOWSuspended ScaffoldSigned-offPratt Construction & Restoration03/21/2025
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises03/11/2025
+ 60 more permits on file
4 projects · most recent 03/23/2026
Air Conditioning Systems Ventilation Systems Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026Signed-offTishman ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Liebert DME020E 825 CFM · Wshp ×24
MCS028E 1,800 CFM · Condensing Unit ×2
PX011UA1D 1,800 CFM · Fan Coil Indoor ×2
PX011UW 1,725 CFM · Wshp ×2
DME020E-PCN 825 CFM · Wshp ×8
MT060HE1A0 1,800 CFM · Fan Coil Indoor ×2
MTC65ALA21S8732 1,800 CFM · Condensing Unit ×2
PX011UW1A8S9L9 1,725 CFM · Wshp ×2
Daikin RWEQ120TAYDA 150,000 BTU · Vrf Outdoor ×6
RWEQ120TAYDA-HR 150,000 BTU · Vrf Outdoor ×2
RWEQ144TAYDA 150,000 BTU · Vrf Outdoor ×12
RWEYQ72PCTJ-HR 75,900 BTU · Vrf Outdoor ×2
RWEYQ72PCYD 75,900 BTU · Vrf Outdoor ×2
Dimplex AVO-600001-M 468,000 BTU · Chiller ×4
AVO-60001-M 560,000 BTU · Chiller ×4
Heating
Dimplex HEX00256-M 256,200 BTU · Chiller ×6
HEX00051-M 51,182 BTU · Chiller ×4
HEX00274-M 256,200 BTU · Chiller ×6
HEX00072-M 51,182 BTU · Chiller ×4
Carrier 50PSH060 2,000 CFM · Wshp ×6
50WDB060NBGE3QBA 2,000 CFM · Wshp ×6
Indeeco TSI 80 CFM ×8
__Junk__ RX-12-1 4 kW · Generator ×4
RX-216-3 72 kW · Generator ×4
— CARRIER 6,000 CFM · Wshp ×4
United Cool Air EXVZWL35-G4ATBC-C 6,000 CFM · Heat Pump Outdoor ×2
Ventilation
Daikin FXMQ30TBVJU 1,095 CFM · Vrf Indoor ×60
FXMQ15TBVJU 558 CFM · Vrf Indoor ×24
FXMQ18TBVJU 636 CFM · Vrf Indoor ×20
FXSQ12TBVJU 335 CFM · Vrf Indoor ×12
FXMQ12TBVJU 335 CFM · Vrf Indoor ×4
FXMQ36TBVJU 1,130 CFM · Vrf Indoor ×4
FXMQ48TBVJU 1,377 CFM · Vrf Indoor ×4
fxmq24tbvju 742 CFM · Vrf Indoor ×4
Greenheck SQ-160-VG 3,090 CFM · Exhaust Fan ×8
AX-72-190-0631-A100 15,000 CFM · Exhaust Fan ×4
BSQ-90 960 CFM · Exhaust Fan ×4
SQ-16-07-0700-VG 5,475 CFM · Exhaust Fan ×4
SQ-98-VG 400 CFM · Exhaust Fan ×4
Gree SQ-97-VG 100 CFM · Exhaust Fan ×4
07/23/2025Permit IssuedGreat Interior RenovationHeating and Air Conditioning Systems
Heat / Cool
Gree GREE GMV-12WP/A-T 12,000 BTU · Vrf Outdoor ×5
02/24/2025Permit IssuedKing Construction GPAir Conditioning Systems, Ventilation Systems
Cooling
Task TYC021TW-30K 3619-A 30,000 BTU · Condensing Unit ×3
Ventilation
Task TYE031 R454B TXV LAN-1200 29,900 BTU · Fan Coil Indoor ×3
03/10/2020Permit IssuedFour Star Air Con'd CoAir Conditioning Systems
Cooling
Daikin WCCH5060 2,000 CFM · Heat Pump Outdoor ×2
2 projects · most recent 02/12/2026
FiledStatusContractorScope
02/12/2026Permit IssuedPreferred Sprinkler and Mechanical368 heads, 3 outlets
03/20/2025Permit IssuedPreferred Sprinkler and Mechanical274 heads
4 projects · most recent 06/09/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/09/2026Permit IssuedParamount ServicesGas, Water/Sanitary
02/12/2026———
07/23/2025Permit IssuedDoval Plumbing & HeatingGas, Water/Sanitary
10/25/2021Permit IssuedMCM Plumbing & HeatingWater/Sanitary
25 projects · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026Permit IssuedNY City ElectricGeneral Wiring
02/09/2026Permit IssuedPrecision Electrical ContGeneral Wiring
01/28/2026Permit IssuedPrecision Electrical ContGeneral Wiring
09/11/2025CompleteT. McCaffrey-T. McGovern—
08/27/2025CompleteDanube Electric CoGeneral Wiring
08/26/2025CompleteModern Voltage NYCGeneral Wiring
07/31/2025CompleteAmsterdam ElectricGeneral Wiring
05/08/2025CompleteEco Electrical Servcs3 meters, 3 new_meters
04/21/2025Permit IssuedB & G Electrical Contracting of NY IGeneral Wiring
02/12/2025Permit IssuedZip ElectricGeneral Wiring
02/04/2025CompleteEco Electrical ServcsGeneral Wiring
01/08/2025CompleteB & G Electrical Contracting of NY I—
08/19/2024CompleteRedline ElectricGeneral Wiring
07/29/2024CancelledPrestige Electrical ContgGeneral Wiring
07/12/2024CompleteNorcal ElectricGeneral Wiring
2 projects · most recent 03/25/2026
Steel Concrete
FiledStatusContractorScope
03/25/2026Signed-offPrat EnterprisesSteel, Concrete
03/23/2026Signed-offTishman Construction1 scope_items
1 project · most recent 08/01/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/01/2023Permit IssuedSpring ScaffoldingScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 53
DateTypeResultReport
08/14/2026Pass General Construction Non-Directive 14PassView ↗
06/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 53.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/15/2026Tenant Protection Plan Compliance—special
09/15/2026Energy Code Compliance InspectionsYoung Suhprogress
09/15/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/15/2026Fire-Resistance Rated ConstructionYoung Suhprogress
08/31/2026Tenant Protection Plan Compliance—special
08/27/2026Interior lighting powerBenjamin Feigerenergy_progress
08/27/2026Lighting controlsBenjamin Feigerenergy_progress
08/25/2026FinalBenjamin Feigerprogress
08/25/2026Fire-Resistant Penetrations and Joints—special
08/05/2026FinalLEON SKVIRSKYprogress
08/05/2026FinalLEON SKVIRSKYprogress
06/29/2026Post-installed AnchorsWilliam Ryanspecial
06/29/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/29/2026FinalRandall Goyaprogress
06/29/2026Interior lighting powerRandall Goyaenergy_progress
06/29/2026Lighting in dwelling unitsRandall Goyaenergy_progress
06/29/2026Energy Code Compliance InspectionsRandall Goyaprogress
06/09/2026Lighting in dwelling unitsRandall Goyaenergy_progress
06/09/2026Post-installed AnchorsWilliam Ryanspecial
06/09/2026FinalRandall Goyaprogress
06/09/2026Energy Code Compliance InspectionsRandall Goyaprogress
06/09/2026Interior lighting powerRandall Goyaenergy_progress
06/09/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/05/2026Fire-Resistance Rated ConstructionPaul Portellprogress
05/12/2026Fire-Resistant Penetrations and JointsPaul Portellspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Wonder Brookfield PlaceFitness / RecreationFloor 3
Project M01451025 Alteration · Permit Entire · 09/14/2026
AMC TheaterArts / Culture / EntertainmentFloors 1, 7
Project M01383192 Alteration · Permit Entire · 04/21/2026
Project M00083276 Alteration · Permit Entire · 11/14/2018
Project M00083291 Alteration · Permit Entire · 11/14/2018
EquinoxFitness / RecreationFloors 2–4
Project M01329665 Alteration · LOC Issued · 04/01/2026
Clean MarketRetailFloor 4
Project M01263755 Alteration · LOC Issued · 08/15/2025
NYUL Heath Upper West Side Ambulatory CenterMedical / HealthcareSub-cellar, Cellar, Floors 1, 8
Project M00833538 Alteration · LOC Issued · 04/21/2023
Project M00829202 Alteration · LOC Issued · 04/20/2023
Project M00828940 Alteration · Permit Entire · 04/07/2023
Project M00833558 Alteration · Permit Entire · 04/07/2023
MillenniumOfficeSub-cellar, Cellar, Floor 1, Roof
Project M00800020 Alteration · LOC Issued · 01/13/2023
Project M00800062 Alteration · LOC Issued · 01/12/2023
Project M00800069 Alteration · LOC Issued · 01/12/2023
Latham & WatkinsOfficeFloor 1
Project M00200947 Alteration · Permit Entire · 07/30/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,206 on file (BIS + DOB NOW)
▸Plans & Drawings118
▸DOB NOWPlans/Sketch103
10/13/2026M01441255-I1Request digital key ↗
10/04/2026M01451025-I1Request digital key ↗
09/06/2026M00083291-I1Request digital key ↗
Showing 3 of 103 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00234231-P1Request digital key ↗
09/05/2026M00234231-I1Request digital key ↗
09/05/2026M00236389-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00214446-I1Request digital key ↗
09/05/2026M00236136-P1Request digital key ↗
09/05/2026M00298748-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00166994-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00260011-I1Request digital key ↗
▸Applications & Permits621
▸BISWORK PERMIT APPLICATION300
12/28/2020123529119Open ↗
03/06/2020123745180Open ↗
03/06/2020123745199Open ↗
Showing 3 of 300 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION292
01/10/2023123917315Open ↗
04/27/2022123745199Open ↗
11/10/2021123906684Open ↗
Showing 3 of 292 on file for this type
▸BISPLACE OF ASSEMBLY19
05/10/2021120606451Open ↗
Showing 1 of 19 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
10/14/2026M08049661-P2Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications926
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION349
03/25/2020123250089Open ↗
03/25/2020123250089Open ↗
03/10/2020123081921Open ↗
Showing 3 of 349 on file for this type
▸DOB NOWProgress Inspector Seal & Signature162
10/18/2026M00868111-I1Open ↗
10/14/2026M08049661-P2Open ↗
10/14/2026M08049661-P2Open ↗
Showing 3 of 162 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature122
10/14/2026M08049661-P2Open ↗
10/06/2026M00200947-I1Open ↗
10/06/2026M00200947-I1Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature114
10/14/2026M08049661-P2Open ↗
10/04/2026M01451025-I1Open ↗
09/10/2026M01441255-I1Open ↗
Showing 3 of 114 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST68
03/13/2020123250089Open ↗
Showing 1 of 68 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Trade Schedules & Equipment264
▸BISSELF-CERT PLUMBING NOTICE84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 84 on file for this type
▸BISSCHEDULE B - PLUMBING69
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 69 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE49
02/24/2020123716844Open ↗
10/17/2019104095630Open ↗
Showing 2 of 49 on file for this type
▸BISEQUIPMENT USE PERMITS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
01/08/2021123667905Open ↗
Showing 1 of 12 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection37
▸BISTenant Protection Plan and Notes25
01/13/2020123794983Open ↗
09/18/2019123745199Open ↗
09/18/2019123745180Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWTenant Protection Plan6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStreet Tree Checklist3
10/14/2026M08049661-P2Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos143
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
10/14/2026M08049661-P2Open ↗
09/03/2026M00601767-I1Open ↗
09/01/2026M00800069-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)35
10/17/2019104095630Open ↗
Showing 1 of 35 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance211
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS123
03/25/2020123250089Open ↗
03/25/2020123250089Open ↗
03/10/2020123081921Open ↗
Showing 3 of 123 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS47
09/30/2025123390035Open ↗
01/28/2021123529119Open ↗
01/13/2021123253200Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
01/28/2021123529119Open ↗
01/13/2021123253200Open ↗
10/01/2020123794983Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
09/30/2025123390035Open ↗
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER2
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
▸BISLIGHTING IN DWELLING UNITS2
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/03/2026M00595837-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY17
09/30/2025123390035Open ↗
01/28/2021123529119Open ↗
01/28/2021123529119Open ↗
Showing 3 of 17 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
03/10/2020123081921Open ↗
Showing 1 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
▸Approvals, Objections & Sign-offs241
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST119
09/30/2025123390035Open ↗
02/13/2023123745180Open ↗
02/13/2023123745199Open ↗
Showing 3 of 119 on file for this type
▸BISADMINISTRATIVE OBJECTIONS72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION31
08/24/2021123906684Open ↗
08/24/2021123906684Open ↗
Showing 2 of 31 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL3
09/30/2025123390035Open ↗
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership286
▸BISCOST AFFIDAVIT263
01/28/2021123529119Open ↗
10/01/2020123794983Open ↗
07/22/2020123038104Open ↗
Showing 3 of 263 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
09/30/2025123390035Open ↗
02/10/2023123745180Open ↗
02/10/2023123745199Open ↗
Showing 3 of 7 on file for this type
▸BISDEPT OF FINANCE VERIFICATION5
01/11/2023123917315Open ↗
01/11/2023123917315Open ↗
01/11/2023123917315Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms278
▸BISEFILING COVER SHEET154
01/10/2023123917315Open ↗
08/19/2021123906684Open ↗
01/13/2020123794983Open ↗
Showing 3 of 154 on file for this type
▸BISADDITIONAL INFORMATION71
05/31/2022123745199Open ↗
07/13/2021120606451Open ↗
01/07/2021123529119Open ↗
Showing 3 of 71 on file for this type
▸BISBOROUGH INTAKE FORM38
01/10/2023123917315Open ↗
03/11/2020123250089Open ↗
03/10/2020123081921Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Other Documents36
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
11/16/2021123906684Open ↗
09/10/2019123253200Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWCalculations7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWManufacturer's Specifications7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification3
10/14/2026M08049661-P2Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPW1 (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type