| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01466854 | 184 MULBERRY STREET MANHATTAN | New Job Filing | Job in process | 09/28/2026 | 09/28/2026 | — | Existing one 200amps single phase meter+new main breaker 200amps single panel +3 new lines for electric hot water heaters. |
| B01443179 | 1425 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 08/10/2026 | 08/10/2026 | — | 18 recess lights, 6 duplex outlets, 5 double duplex, two switch dimmers, |
| B01443774 | 1802 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 08/10/2026 | 08/10/2026 | — | Upgrade meter from 60a to 100a three phase |
| B01437179 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/27/2026 | 07/27/2026 | — | APT. 2A 80amps riser , one panel , two electric baseboard , one D/W outlet , one switch, two GFI outlet on counter, four GFI replace in k… |
| B01426351 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/05/2026 | 07/06/2026 | — | Apt. 3C New 80amps riser plus replacing circuit breakers panel |
| B01424950 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/01/2026 | 06/30/2026 | — | Apt. 4A New riser and circuit breaker panel |
| Name | Projects together | Most recent |
|---|---|---|
| Lendlease | 20 | — |
| David Eisenstein Real Estate | 14 | — |
| Solo Energy | 13 | — |
| Kahen Properties Llc | 7 | — |
| Pr | 7 | — |
| Cj Plaza One Llc | 6 | — |
| 17 Flatbush Llc | 5 | — |
| Pavlos Realty Inc | 5 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01466854 | 184 MULBERRY STREET MANHATTAN | New Job Filing | Job in process | 09/28/2026 | 09/28/2026 | — | Existing one 200amps single phase meter+new main breaker 200amps single panel +3 new lines for electric hot water heaters. |
| B01443179 | 1425 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 08/10/2026 | 08/10/2026 | — | 18 recess lights, 6 duplex outlets, 5 double duplex, two switch dimmers, |
| B01443774 | 1802 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 08/10/2026 | 08/10/2026 | — | Upgrade meter from 60a to 100a three phase |
| B01437179 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/27/2026 | 07/27/2026 | — | APT. 2A 80amps riser , one panel , two electric baseboard , one D/W outlet , one switch, two GFI outlet on counter, four GFI replace in k… |
| B01426351 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/05/2026 | 07/06/2026 | — | Apt. 3C New 80amps riser plus replacing circuit breakers panel |
| B01424950 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 07/01/2026 | 06/30/2026 | — | Apt. 4A New riser and circuit breaker panel |
| M01419449 | 204 WEST HOUSTON STREET MANHATTAN | New Job Filing | Job in process | 06/21/2026 | 06/22/2026 | — | Apt. 4B General wiring |
| B01409752 | 1946 EAST 34 STREET BROOKLYN | New Job Filing | Complete | 05/31/2026 | 06/02/2026 | — | Up grade service to 200a |
| B01408405 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 05/28/2026 | 06/01/2026 | — | Apt. 2B General wiring |
| M01405577 | 180 SPRING STREET MANHATTAN | New Job Filing | Complete | 05/20/2026 | 05/25/2026 | — | Installation of smoke detectors in three apartments and building hallways |
| B01390121 | 1378 EAST 12 STREET BROOKLYN | New Job Filing | Job in process | 04/20/2026 | 04/22/2026 | — | Upgrade service to 200amps single phase, wire three A/C compressors and nine split units indoor |
| B01375393 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 03/20/2026 | 03/20/2026 | — | Apt. 2C general wiring : panel, 80amps riser, two GFI outlets in the kitchen, one switch and GFI in the bathroom,replace 4 switches and 8 re… |
| B01369593 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Job in process | 03/10/2026 | 03/10/2026 | — | Apt. 1A general wiring : panel,riser,two GFI outlets in the kitchen,one switch,two lights fixtures replace, two 4` electric heaters |
| B01325715 | 1381 EAST 12 STREET BROOKLYN | New Job Filing | Job in process | 11/26/2025 | 12/02/2025 | — | Upgrade two meters and two panels to 200amps , power four A/C compressors and nine indoor split A/C units |
| B01324982 | 1388 EAST 12 STREET BROOKLYN | New Job Filing | Complete | 11/25/2025 | 11/26/2025 | — | upgrade service to 200amps , new 200amps panel. power for three A/C compressors ,nine indoor split units , two new outlets , six replace … |
| B01321999 | 838 FLATBUSH AVENUE BROOKLYN | New Job Filing | Job in process | 11/19/2025 | 11/20/2025 | — | 200amps three phase meter |
| B01309083 | 127 FALMOUTH STREET BROOKLYN | New Job Filing | Job in process | 10/27/2025 | 10/28/2025 | — | 100a service temporary |
| B01305807 | 1372 EAST 12 STREET BROOKLYN | New Job Filing | Job in process | 10/20/2025 | 10/21/2025 | — | 200amps service, General wiring first and second floors .Existing split units and compressors |
| B01283240 | 305 THROOP AVENUE BROOKLYN | New Job Filing | Complete | 09/07/2025 | 09/08/2025 | — | APT 3F Installing two electric baseboard heaters plus two GFI outlets in the kitchen |
| B01282463 | 303 THROOP AVENUE BROOKLYN | New Job Filing | Job in process | 09/04/2025 | 09/05/2025 | — | Apt. 2 R 6 Electric baseboards |
| Q01273057 | 64-35 YELLOWSTONE BLVD QUEENS | New Job Filing | Job in process | 08/18/2025 | 08/18/2025 | — | Job started by others.OATH/ECB Violation #35537478R: Work without permit entire ceiling on Apt. 2K including electrical fixtures and cables… |
| B01267299 | 2882 NOSTRAND AVENUE BROOKLYN | New Job Filing | Complete | 08/06/2025 | 08/07/2025 | — | Job started by other. one A/C compressor outdoor and three blower units indoor |
| B01259677 | 813 ROGERS AVENUE BROOKLYN | New Job Filing | Job in process | 07/22/2025 | 07/22/2025 | — | Apt. 2R General wiring: riser,panel outlets |
| Q01259351 | 189-15 73 AVENUE QUEENS | New Job Filing | Job in process | 07/22/2025 | 07/22/2025 | — | installed and wired 10 EV chargers in existing garage |
| B01254381 | 89-35 15 AVENUE BROOKLYN | New Job Filing | Job in process | 07/10/2025 | 07/11/2025 | — | Up grade two meters: owner meter to 200amps single phase , tenet meter to 100amps single phase |
| B01242943 | 1753 EAST 21 STREET BROOKLYN | New Job Filing | Job in process | 06/17/2025 | 06/18/2025 | — | Job started by others . General wiring all house |
| B01240134 | 303 THROOP AVENUE BROOKLYN | New Job Filing | Complete | 06/11/2025 | 06/12/2025 | — | -APT. 3L four electrical bass board heaters-one panel |
| B01220445 | 303 THROOP AVENUE BROOKLYN | New Job Filing | Complete | 05/04/2025 | 05/05/2025 | — | --APT. 1R four electrical bass board heaters +D/W outlet--APT. 2L four electrical bass board heaters--APT. 3R four electrical bass boar… |
| Q01207085 | 88-16 LIBERTY AVENUE QUEENS | New Job Filing | Complete | 04/07/2025 | 04/08/2025 | — | Job started by others General wiring |
| Q01204139 | 30-02 39TH AVENUE QUEENS | New Job Filing | Job in process | 04/01/2025 | 04/01/2025 | — | Installing (6) EV chargers in parking garage |
| B01196951 | 367 NEPTUNE AVENUE BROOKLYN | New Job Filing | Job in process | 03/18/2025 | 03/18/2025 | — | Up grade service to 400amps plus install 6 residential meters and one house meter PLP |
| B01194375 | 6329 AVENUE T BROOKLYN | New Job Filing | Complete | 03/12/2025 | 03/13/2025 | — | Change damage meter pen on existing over head service ,ONLY |
| Q01193242 | 148-10 ARCHER AVENUE QUEENS | New Job Filing | Complete | 03/11/2025 | 03/11/2025 | — | Fit out of Retail space, 1st and 2nd floor, new panels coming from existing retail panel, fit-out power and lighting for school use |
| M01188701 | 352 EAST 20 STREET MANHATTAN | New Job Filing | Job in process | 03/02/2025 | 03/04/2025 | — | Store : installation of single phase 200amps meter. General wiring |
| B01186775 | 305 THROOP AVENUE BROOKLYN | New Job Filing | Complete | 02/25/2025 | 02/26/2025 | — | Apts: 2R , 3R ,2F Installation of One Electric baseboard heater in the bed room and one in the bathroom (in each Apt.) Basement: One 3… |
| B01185964 | 364 KNICKERBOCKER AVENUE BROOKLYN | New Job Filing | Complete | 02/24/2025 | 02/25/2025 | — | Basement. Installing Extra meter (PLP) |
| Q00961709 | 26-50 1ST STREET QUEENS | Subsequent Filing | Complete | 11/13/2023 | 02/17/2025 | — | Installation of electrical for 2 saunas and sauna equipment |
| M01173564 | 140 WEST 69 STREET MANHATTAN | New Job Filing | Complete | 01/29/2025 | 01/30/2025 | — | Apt. 121A Supersede application # Z096100 started on 05/29/2003 by others |
| X01164681 | 897 FAILE STREET BRONX | New Job Filing | Job in process | 01/08/2025 | 01/13/2025 | — | Installation of new meter PLP. |
| Q01160653 | 188-02 64 AVENUE QUEENS | New Job Filing | Job in process | 12/27/2024 | 12/27/2024 | — | Installing new panel and 60amp 2pole lines in parking garage to new EV charger |
| M01159333 | 383 1 AVENUE MANHATTAN | New Job Filing | Job in process | 12/22/2024 | 12/23/2024 | — | Apt. 1 installing: new riser , panel , oven line.Apt. 2 installing: new riser , panel , oven lineApt. 3 installing: new riser , panel , o… |
| Q01157104 | 58-55 56 DRIVE QUEENS | New Job Filing | Job in process | 12/17/2024 | 12/17/2024 | — | Add new power for cooler |
| M01155399 | 383 1 AVENUE MANHATTAN | New Job Filing | Job in process | 12/12/2024 | 12/13/2024 | — | Apt.1--40a oven outletApt.2--40a oven outletApt.3--40a oven outletApt.4--40a oven outletApt.5--40a oven outletApt.7--Riser, panel, 40a oven … |
| M00654615 | 606 WEST 30TH ST MANHATTAN | New Job Filing | Job in process | 12/29/2021 | 11/20/2024 | — | Installation of temporary switchgear and temporary generator for the power of the hoist and power for general temporary lighting and power t… |
| M01143940 | 1197 PARK AVENUE MANHATTAN | New Job Filing | Complete | 11/18/2024 | 11/18/2024 | — | This application is to supersede App# M01134298 and remove Violation Replacing lights and wiring in parking garage, replacing garage panel w… |
| Q01136665 | 58-55 56 DRIVE QUEENS | New Job Filing | Job in process | 11/04/2024 | 11/04/2024 | — | Power to new cooling equipment, and upgrade service for it |
| M01134298 | 1197 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 10/29/2024 | 10/29/2024 | — | Replacing lights and wiring in parking garage, replacing garage panel with existing feeders |
| M01131347 | 307 EAST 18 STREET MANHATTAN | New Job Filing | Job in process | 10/23/2024 | 10/28/2024 | — | Apt. 3E |
| B01124579 | 2675 OCEAN AVENUE BROOKLYN | New Job Filing | Job in process | 10/09/2024 | 10/10/2024 | — | Replacing three Fuses panels to circuit breakers panels in building`s basement |
| Q01124935 | 58-80 59 STREET QUEENS | New Job Filing | Job in process | 10/09/2024 | 10/09/2024 | — | New panels and feeders from new ConEd service. this work is for work after EPR scope which is another app |
| B01118267 | 303 THROOP AVENUE BROOKLYN | New Job Filing | Complete | 09/27/2024 | 09/27/2024 | — | Apt. 1L Installing 4 electrical bass board Heaters plus one panel |
| M01101704 | 347 EAST 19 STREET MANHATTAN | New Job Filing | Complete | 08/26/2024 | 09/04/2024 | — | Apt. 4 Replace old circuit breaker panel, 5lines for baseboard heaters, one riser from basement, one line for electric oven |
| B01102994 | 1310 CONEY ISLAND AVENUE BROOKLYN | New Job Filing | Job in process | 08/27/2024 | 08/28/2024 | — | Installing 100amps single phase meter for second floor rear |
| Q01102247 | 194-05 67 AVENUE QUEENS | New Job Filing | Job in process | 08/27/2024 | 08/27/2024 | — | Installing 60amp 2pole lines in parking garage to new EV chargers |
| B01083530 | 1753 EAST 21 STREET BROOKLYN | New Job Filing | Job in process | 07/21/2024 | 07/22/2024 | — | up grade service to single phase 200amps |
| B01075122 | 365 BOND STREET BROOKLYN | New Job Filing | Job in process | 07/01/2024 | 07/01/2024 | — | Installing 6 - 60amp 2pole line from existing panel in parking garage to new EV charger |
| B00699274 | 100 FLATBUSH AVENUE BROOKLYN | New Job Filing | Complete | 03/15/2022 | 06/14/2024 | — | Installation of Temporary Switchgear and Temporary Generator for the Power of the Hoists and Power for Crane and Power for General Temporary… |
| M01056440 | 12 EAST 97 STREET MANHATTAN | New Job Filing | Job in process | 05/24/2024 | 05/24/2024 | — | Apt. 6L |
| M01053556 | 12 EAST 97 STREET MANHATTAN | New Job Filing | Job in process | 05/19/2024 | 05/21/2024 | — | Apt.6J |
| B01049230 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Complete | 05/09/2024 | 05/10/2024 | — | Apt. 3B |
| M01044156 | 347 EAST 19 STREET MANHATTAN | New Job Filing | Complete | 05/01/2024 | 05/01/2024 | — | Apt. 3 Replace old circuit breaker panel, 5lines for baseboard heaters, one riser from basement, one line for electric oven |
| M01005049 | 341 8TH AVENUE MANHATTAN | New Job Filing | Job in process | 03/13/2024 | 04/18/2024 | — | Installation of temporary switchgear and power for general temporary lighting and power throughout the building. Power for hoists, crane, an… |
| B01036447 | 1421 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 04/16/2024 | 04/16/2024 | — | Adding extra meter for house PLP |
| Q01030960 | 58-55 56 DRIVE QUEENS | New Job Filing | Job in process | 04/04/2024 | 04/04/2024 | — | This application is to supersede App # Q00984492, for the EPR work done in EPR#QN01404A3The scope is exact the same, just the address is cha… |
| B01019850 | 1217 FLATBUSH AVENUE BROOKLYN | New Job Filing | Complete | 03/18/2024 | 03/14/2024 | — | Correction Violation #39107151K |
| B01010469 | 1368 EAST 9 STREET BROOKLYN | New Job Filing | Job in process | 02/25/2024 | 02/26/2024 | — | job started by others. general wiring all house |
| B01010480 | 3001 AVENUE S BROOKLYN | New Job Filing | Job in process | 02/25/2024 | 02/26/2024 | — | 200amps service upgrade |
| M01007334 | 537 3 AVENUE MANHATTAN | New Job Filing | Job in process | 02/18/2024 | 02/21/2024 | — | Apt 9C + replacing circuit breaker panel |
| M01006641 | 307 EAST 18 STREET MANHATTAN | New Job Filing | Job in process | 02/15/2024 | 02/20/2024 | — | Apt. 4FE general wiring |
| B01004774 | 1215 FULTON STREET BROOKLYN | New Job Filing | Job in process | 02/13/2024 | 02/13/2024 | — | Installation of switchgear EPR# BK02342A2 and installation of electrical for 240 units, retail spaces, and mechanical back of house areas. I… |
| M00967701 | 300 EAST 50 STREET MANHATTAN | New Job Filing | Job in process | 11/27/2023 | 02/09/2024 | — | Installation of temporary switchgear and power for general temporary lighting and power throughout the building. Wiring of temporary Power f… |
| M00999074 | 51 AVENUE A MANHATTAN | New Job Filing | Complete | 01/31/2024 | 02/05/2024 | — | Apt. 3D all new wiring per nyc code plus replacing old fuse box to new circuit breakers panel |
| Q00990275 | 224-01 HILLSIDE AVENUE QUEENS | New Job Filing | Job in process | 01/14/2024 | 01/16/2024 | — | Replacement circuit breaker panel ,new oven line,, two GFI outlets over counter, three smoke alarm, 8 recess lights in living room, one new … |
| Q00984492 | 58-80 59 STREET QUEENS | New Job Filing | Cancelled | 01/02/2024 | 01/02/2024 | — | This application is for the EPR work done in EPR#QN01404A3 |
| B00979155 | 1013 AVENUE K BROOKLYN | New Job Filing | Job in process | 12/18/2023 | 12/19/2023 | — | Upgrade to 200amps service. Two meters 200amps single phase. two central A/C units |
| Q00968782 | 88-16 LIBERTY AVENUE QUEENS | New Job Filing | Job in process | 11/28/2023 | 12/05/2023 | — | Upgrade service to three phase 200amps |
| B00970846 | 315 93 STREET BROOKLYN | New Job Filing | Job in process | 12/03/2023 | 12/04/2023 | — | Store: meter service plus general wiring |
| B00961545 | 1357 ATLANTIC AVENUE BROOKLYN | New Job Filing | Job in process | 11/12/2023 | 11/19/2023 | — | Replacing: damaged Coned end box,200amps three phase meter pen , 200amps three phase main cut off switch |
| B00671431 | 955 STERLING PLACE BROOKLYN | New Job Filing | Job in process | 01/31/2022 | 11/15/2023 | — | Installation of temporary switchgear and temporary generator for the temp power of the hoist general temporary lighting and power during con… |
| B00956896 | 30 FRONT STREET BROOKLYN | New Job Filing | Complete | 11/03/2023 | 11/03/2023 | — | Indoor and outdoor pool, with pool equipment 1 floor below. |
| M00956265 | 147 WEST 14 STREET MANHATTAN | New Job Filing | Job in process | 10/31/2023 | 11/01/2023 | — | Up grate service to 800amps three phase |
| B00940006 | 1179 FLATBUSH AVE BROOKLYN | New Job Filing | Job in process | 09/26/2023 | 09/27/2023 | — | Replacing four circuit breakers panels and main feeder from end Coned box to metersRewire 5 A/C compressors and 5 indoor units.Basement gene… |
| B00935976 | 1413 KINGS HIGHWAY BROOKLYN | New Job Filing | Job in process | 09/19/2023 | 09/19/2023 | — | --Up grade three single phase meters and combo panel and a store three phase meter and combo panel--Two risers #4 and replace four sub panel… |
| M00652403 | 511 THIRD AVENUE MANHATTAN | New Job Filing | Job in process | 12/22/2021 | 08/30/2023 | — | Installation of temporary switchgear and temporary generator for the power of the hoist and power for general temporary lighting and power t… |
| M00920007 | 205 EAST 69 STREET MANHATTAN | New Job Filing | Complete | 08/15/2023 | 08/16/2023 | — | General wiring Apt. 1B |
| M00919343 | 515 WEST 36 STREET MANHATTAN | New Job Filing | Complete | 08/14/2023 | 08/14/2023 | — | This application is not for any work, the application is to update the floor numbers of the existing work of the pool and Spa of App#M009109… |
| B00917211 | 1764 EAST 18 STREET BROOKLYN | New Job Filing | Complete | 08/09/2023 | 08/10/2023 | — | General wiring: Apt. 1B |
| B00912675 | 498 SACKETT STREET BROOKLYN | New Job Filing | Complete | 08/01/2023 | 08/01/2023 | — | General wiring for Temp power for construction use |
| M00910905 | 515 WEST 36 STREET MANHATTAN | New Job Filing | Job in process | 07/27/2023 | 07/27/2023 | — | This application is not for any work, the application is to update the floor numbers of the existing work of the pool and Spa of App#M000290… |
| B00904222 | 1215 FULTON STREET BROOKLYN | New Job Filing | Job in process | 07/19/2023 | 07/19/2023 | — | Installation of Temporary Switchgear and Power for General Temporary Lighting and Power throughout the Building. Power for Hoists, Crane, Te… |
| M00904861 | 159 EAST 106 STREET MANHATTAN | New Job Filing | Job in process | 07/16/2023 | 07/17/2023 | — | Installing two new meters in Apts : 2A and Apt. 3A General wiring Apts: 2A ,2B ,3A , 3B |
| M00887869 | 307 EAST 18 STREET MANHATTAN | New Job Filing | Complete | 06/08/2023 | 06/09/2023 | — | Job started by others.General wiring Apt. 5F Change of apartment name #5D to Apt. #5F |
| B00887578 | 522 PACIFIC STREET BROOKLYN | New Job Filing | Job in process | 06/08/2023 | 06/08/2023 | — | Adding new 400amp and new 800amp service switch and meter for retail use according to approved Electrical Plan Review Results Job#BK01892A1 |
| B00882305 | 1215 AVENUE M BROOKLYN | New Job Filing | Complete | 05/30/2023 | 05/30/2023 | — | Replace defective meter pan and installation of new three phase 200amps circuit breaker panel |
| Q00877451 | 3-24 27TH AVENUE QUEENS | New Job Filing | Job in process | 05/18/2023 | 05/18/2023 | — | This application is to add the Residential meters to the existing signed-off application of this new project. the signed of applications are… |
| B00872117 | 315 93 STREET BROOKLYN | New Job Filing | Job in process | 05/09/2023 | 05/09/2023 | — | General wiring 40 Apartments+ PLPOne store |
| B00858133 | 544 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 04/11/2023 | 04/11/2023 | — | Power and grounding of Pool on the 5th floor Roof and pool room with equipment for pool on the same floor |
| M00850813 | 521 EAST 81 STREET MANHATTAN | New Job Filing | Complete | 03/27/2023 | 03/29/2023 | — | Apt. 1B General wiring all the Apt. |
| Q00849481 | 26-50 1ST STREET QUEENS | New Job Filing | Cancelled | 03/24/2023 | 03/24/2023 | — | New 3000Amps Temp Service for Construction, temp power and light for the entire building, power for temp tower crane and power for temp hois… |
| B00846221 | 1433 EAST 10TH STREET BROOKLYN | New Job Filing | Job in process | 03/19/2023 | 03/20/2023 | — | job started by others. service work plus general wiring, basement to third floor |