← Back
BROOKLYN
The Front and York Condominium
95 YORK STREET · BIN 3425091
💬 Discuss this project
—Year Built
—Stories
—Building Class
R7-1Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
52,171 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionFire AlarmEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 4 docs
Floor 221p · 1 filing · 2 docs
Floor 211p · 1 filing · 5 docs
Floor 202p · 2 filings · 7 docs
Floor 192p · 1 filing · 5 docs
Floor 18Under Construction13p · 1 filing · 10 docs
Floor 17
Floor 16
Floor 15
Floor 141p · 1 filing · 5 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 92p · 2 filings · 8 docs
Floor 83p · 2 filings · 8 docs
Floor 7
Floor 62p · 2 filings · 8 docs
Floor 5
Floor 4
Floor 31p · 1 filing · 6 docs
Floor 24p · 3 filings · 16 docs
Floor 139p · 13 filings · 20 docs
Mezzanine8p · 6 filings · 20 docs
Cellar8p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIVWRK10806/27/2026
JAY STREET ASSOC C O CIM GROUP5806/27/2026
CVS HEALTH1406/27/2026
NAYA1206/27/2026
NOBODY TOLD ME DUMBO1306/27/2026
LAZY SUNDAES1006/27/2026
JAY STREET ASSOC C/O CIM GROUP3303/22/2026
CIM GROUP703/22/2026
NEW LINE STRUCTURES 1 DEV203/22/2026
85 JAY STREET BROOKLYN403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2016$345.0M—— → —— not available
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.4403/21/2026
PAUL FUSCO CONSULTING1003/21/2026
JRK CREATIVE803/21/2026
A1 EXPEDITING SERVICE603/21/2026
BURNHAM NATIONWIDE INC603/21/2026
JP EXPEDITE603/21/2026
BUILDING BROTHERS1203/21/2026
MUNICIPAL BUILDING CONSULTANTS1003/21/2026
JUST ARCHITECTURE603/21/2026
JM ZONING, LLC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATFORM SOLUTIONS, INCGeneral Contractor1606/27/2026
NEW LINE STRUCTURES & DEVGeneral Contractor1406/27/2026
TRITON CONSTRUCTION CO.,General Contractor1106/27/2026
MCALPINE CONTRACTING COGeneral Contractor806/27/2026
NAN TONG JIN YI CONSTRUCTGeneral Contractor604/09/2026
ALBA GROUP INCGeneral Contractor603/21/2026
ACTIVE SIGNSScaffold606/27/2026
PRECISION WORLDWIDEGeneral Contractor603/21/2026
ULTIMATE SIGNS DESIGNSScaffold606/27/2026
STRUCTURETECH NEW YORK INGeneral Contractor506/27/2026
OCS BUILDERS GROUP LLCGeneral Contractor506/27/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor406/27/2026
ECD NY INCGeneral Contractor403/21/2026
PARKVIEW P&H INCPlumbing406/27/2026
AERIAL DESIGN BUILD SVCSGeneral Contractor406/27/2026
RAEL AUTOMATIC SPR.CO INCFire Protection306/27/2026
EVEREST SCAFFOLDING INCGeneral Contractor306/27/2026
SIGNS CADScaffold306/27/2026
EPIC MECHANICAL CONTRACTOGeneral Contractor306/27/2026
USIS ELECTRIC INCElectrical303/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
METRO PROJECTS CONST INCGeneral Contractor303/21/2026
SIRINA FIRE PROT CORPFire Protection206/27/2026
IDDC LLCGeneral Contractor206/27/2026
SHO INTERIOR CREATES INCGeneral Contractor206/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4231010/03/2025
ALL CITY ENGINEERING PC7115309/30/2025
JEON CONSULTING5119408/21/2025
AMARACON TESTING & INSPEC5842608/21/2025
INTEGRITY CONSULTING SERV666108/13/2025
METROSPEC SIA6420507/21/2025
NKM ENGINEERING PLLC6244307/29/2024
HALO ARCHITECTURE PLLC8021204/12/2024
FACTORY ENGINEERING WORKS8855104/12/2024
RICHARD B. KORNBLAU, AIA3208401/08/2024
Building Lifecycle
All (300)Filed (46)Permit Issued (61)Signed Off (57)Violation (18)Inspection (60)Objection (28)Special Inspection (30)
09/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2026
Filed — Alteration
B01451179-I1
07/06/2026
Permit issued — Plumbing
B01269306-S1-PL
06/30/2026
Permit issued — Sprinklers
B01269306-S2-EW-SP
05/27/2026
Permit issued — General Construction
B01269306-I1-GC
03/19/2026
Violation issued (ECB, open)
Elevators
03/04/2026
Violation issued (FDNY_NOV, closed)
03/04/2026
Violation issued (FDNY_NOV, closed)
02/05/2026
Signed off — Alteration
B08052644-I1
02/02/2026
Special inspection requirement — Lighting controls
CONNIE PISANI
02/02/2026
Special inspection requirement — Mechanical Systems
CONNIE PISANI
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
02/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
02/02/2026
Special inspection requirement — Shutoff dampers
CONNIE PISANI
02/02/2026
Special inspection requirement — Interior lighting power
CONNIE PISANI
02/02/2026
Special inspection requirement — Maintenance information
CONNIE PISANI
02/02/2026
Special inspection requirement — Final
CASS SMITH
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
02/02/2026
Special inspection requirement — Post-installed Anchors
BENJAMIN JEON
01/20/2026
Signed off — Alteration
Install raised platform as per plan. No change in use, egress, occupancy.
B01031157-I1
01/20/2026
Signed off — Alteration
Proposed new mechanical system for commercial space on partial 1st floor (Retail G) of an existing mixed used building. Install exhaust hood work for commercial kitchen of eating and drinking establishment. No change in use, egress, or occupancy.
B01012526-I1
01/09/2026
Signed off — Alteration
B01266657-I1
12/23/2025
Signed off — Alteration
Proposed sprinkler work took place at partial 1st floor as per plans filed. No change in use, bulk, egress or occupancy.
B01015243-I1
12/18/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
12/05/2025
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH TENANT-FIT-OUT RENOVATIONS, INCLUDING COMMERCIAL KITCHEN COOKING EQUIPMENT, EXHAUST SYSTEM INCLUDING HOOD, MAKE-UP AIR FAN, EXHAUST FAN, DIFFUSERS/GRILLES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01153479-I1
11/12/2025
Objection resolved — Addressed
10/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/28/2025
Violation issued (FDNY_NOV, closed)
10/23/2025
Objection resolved — Addressed
10/23/2025
Objection resolved — Addressed
10/21/2025
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR NAYA. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01239558-I1
10/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/20/2025
Signed off — Alteration
GENERAL CONSTRUCTION FOR INTERIOR TENANT FIT OUT RENOVATIONS OF COMMERCIAL SPACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01153461-I1
10/09/2025
Objection raised — Scope
10/03/2025
Signed off — Alteration
Proposed new mechanical system for commercial space on partial 1st floor (Retail G) of an existing mixed used building. Install exhaust hood work for commercial kitchen of eating and drinking establishment. No change in use, egress, or occupancy.
B01012526-S2
10/03/2025
Filed — Alteration
Relocation of (1) sidewall sprinkler head. Cap/Removal of (1) concealed pendant sprinkler. No change to sprinkler system.
B01269306-S2
10/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/30/2025
Filed — Alteration
Proposed new mechanical system for commercial space on partial 1st floor (Retail G) of an existing mixed used building. Install exhaust hood work for commercial kitchen of eating and drinking establishment. No change in use, egress, or occupancy.
B01012526-P1
09/29/2025
Permit issued — General Construction
B01266657-I1-GC
09/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/16/2025
Special inspection requirement — Sprinkler Systems
Young Suh
09/02/2025
Objection raised — Plumbing
09/02/2025
Objection raised — Scope
09/02/2025
Objection raised — Mechanical
09/02/2025
Objection raised — Plumbing
09/02/2025
Objection raised — Scope
09/02/2025
Objection raised — Plumbing
08/21/2025
Filed — Alteration
B08052644-P1
08/21/2025
Signed off — Alteration
Plumbing and Sprinkler works filed in conjunction with GC application to renovate an existing retail space
B08052625-I1
08/15/2025
Filed — Alteration
Relocation of (1) sidewall sprinkler head. Cap/Removal of (1) concealed pendant sprinkler. No change to sprinkler system.
B01269306-S1
08/15/2025
Signed off — Alteration
Interior renovation of an existing retail space. No change in use, egress and occupancy.
B08051092-I1
08/15/2025
Filed — Alteration
Relocation of (1) sidewall sprinkler head. Cap/Removal of (1) concealed pendant sprinkler. No change to sprinkler system.
B01269306-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG07/06/2026
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBING &06/30/2026
DOB NOWGeneral ConstructionPermit Issued1625 DB INC05/27/2026
DOB NOWGeneral ConstructionSigned-offRADIUS CONSTRUCTION INC09/29/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC07/08/2025
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.04/07/2025
DOB NOWMechanical SystemsSigned-offIDDC LLC03/10/2025
DOB NOWSignSigned-offCAPITOL DESIGN & MAINT IN02/27/2025
DOB NOWPlumbingPermit IssuedN&K PLMBNG AND HTNG CORP02/11/2025
DOB NOWGeneral ConstructionSigned-offIDDC LLC01/16/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH09/04/2024
DOB NOWMechanical SystemsSigned-offPRECISION WORLDWIDE08/23/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/23/2024
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC06/05/2024
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC05/07/2024
DOB NOWStructuralSigned-offNAN TONG JIN YI CONSTRUCT04/24/2024
DOB NOWGeneral ConstructionSigned-offNAN TONG JIN YI CONSTRUCT03/21/2024
DOB NOWMechanical SystemsSigned-offNAN TONG JIN YI CONSTRUCT03/21/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO03/21/2024
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP01/25/2024
DOB NOWMechanical SystemsSigned-offPRECISION WORLDWIDE01/18/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG.CORP08/22/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG08/21/2023
DOB NOWGeneral ConstructionSigned-offMCALPINE CONTRACTING CO05/09/2023
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO05/09/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO04/28/2023
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO04/28/2023
DOB NOWMechanical SystemsSigned-offSHO INTERIOR CREATES INC04/12/2023
DOB NOWGeneral ConstructionSigned-offSHO INTERIOR CREATES INC03/07/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP02/25/2023
DOB NOWSprinklersSigned-offA&A PLUMBING CORP02/01/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP11/15/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/11/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/10/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/10/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/10/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/10/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO11/10/2022
DOB NOWStructuralSigned-offOCS BUILDERS GROUP LLC11/04/2022
DOB NOWPlumbingSigned-offFULL CAPACITY FIRE CORP10/31/2022
+ 60 more permits on file
2 projects · most recent 10/03/2025
FiledStatusContractorScope
10/03/2025Permit IssuedAMERICAN STANDARD PLUMBIN2 heads
01/07/2025Permit IssuedRRP PLUMBING CORP38 heads
3 projects · most recent 10/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/03/2025Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
07/21/2025Permit IssuedN&K PLMBNG AND HTNG CORPWater/Sanitary
04/04/2023——Gas
25 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedAE ELECTRIC INCGeneral Wiring
07/06/2026CompleteAMSTERDAM ELECTRIC CORP—
04/09/2026CompleteHI-RITE ELECTRIC CORPGeneral Wiring
02/10/2026Permit IssuedV.R. ELECTRICAL CORPGeneral Wiring
02/10/2026Permit IssuedV.R. ELECTRICAL CORPGeneral Wiring
12/23/2025CompleteDAVEN ELECTRIC CORP—
09/22/2025CompleteELECL POWER LIGHT & MECHGeneral Wiring
05/02/2025Permit IssuedGILSTON BROTHERS ELECT'LGeneral Wiring
07/16/2024CompleteACCURATE ELEC'L CORP.—
07/02/2024CompleteJONG HYUN KIM—
06/18/2024CompleteKYL ELECTRIC LLCGeneral Wiring
03/15/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
03/23/2023CompleteALLSTATE ELECTRIC CORPGeneral Wiring
03/20/2023CompleteALLSTATE ELECTRIC CORPGeneral Wiring
02/08/2023CompleteNGM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 70
DateTypeResultReport
09/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/15/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
10/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2025Pass-Final SD - Fire PumpPassView ↗
01/30/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/06/2025Pass-Final Sign Permit InspectionPassView ↗
12/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/28/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 70.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
02/02/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
02/02/2026Post-installed AnchorsBENJAMIN JEONspecial
02/02/2026Maintenance informationCONNIE PISANIenergy_progress
02/02/2026FinalCASS SMITHprogress
02/02/2026HVAC-R and service water heating system controlsCONNIE PISANIenergy_progress
02/02/2026Mechanical SystemsCONNIE PISANIspecial
02/02/2026Tenant Protection Plan ComplianceCONNIE PISANIspecial
02/02/2026Lighting controlsCONNIE PISANIenergy_progress
02/02/2026HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
02/02/2026Shutoff dampersCONNIE PISANIenergy_progress
02/02/2026Interior lighting powerCONNIE PISANIenergy_progress
02/02/2026HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
02/02/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
09/25/2025Tenant Protection Plan Compliance—special
09/16/2025Sprinkler SystemsYoung Suhspecial
08/11/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/11/2025Energy Code Compliance InspectionsYoung Suhprogress
08/11/2025Fire-Resistance Rated ConstructionYoung Suhprogress
08/11/2025Interior lighting powerYoung Suhenergy_progress
08/11/2025Lighting in dwelling unitsYoung Suhenergy_progress
08/10/2025FinalYoung Suhprogress
08/05/2025FinalGABRIEL HODGEprogress
08/05/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/22/2025Post-installed AnchorsJOSEPH YOUNGspecial
07/22/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
Latest 25 of 150.
▾Documents — 1,088 on file (BIS + DOB NOW)
▸Plans & Drawings124
▸DOB NOWPlans/Sketch101
09/03/2026B00015860-I1Request digital key ↗
09/03/2026B00015973-I1Request digital key ↗
09/03/2026B00015844-I1Request digital key ↗
Showing 3 of 101 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold5
09/02/2026B00373817-I1Request digital key ↗
09/01/2026B00297483-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00472431-I1Request digital key ↗
09/01/2026B00472431-P1Request digital key ↗
09/01/2026B00472431-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence3
09/01/2026B00093971-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00462186-I1Request digital key ↗
09/01/2026B00457345-I1Request digital key ↗
09/01/2026B00457288-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/01/2026B00457360-I1Request digital key ↗
09/01/2026B00457295-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00105174-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/31/2026B00634292-I1Request digital key ↗
08/31/2026B00634292-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00472454-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00472436-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00462200-I1Request digital key ↗
▸Applications & Permits163
▸BISPLAN / WORK APPROVAL APPLICATION117
10/03/2025321188415Open ↗
09/18/2025321188415Open ↗
06/26/2025340566346Open ↗
Showing 3 of 117 on file for this type
▸BISWORK PERMIT APPLICATION46
09/07/2022321188415Open ↗
08/30/2022321188415Open ↗
07/27/2022321188415Open ↗
Showing 3 of 46 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/11/2024321188415Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications338
▸DOB NOWDPL-1: Design Professional Seal & Signature122
09/03/2026B00015860-I1Open ↗
09/03/2026B00015973-I1Open ↗
09/03/2026B00015844-I1Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWProgress Inspector Seal & Signature101
09/02/2026B08052644-I1Open ↗
09/02/2026B08052644-I1Open ↗
09/02/2026B08052644-I1Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature67
09/28/2026B00748228-P1Open ↗
09/23/2026B01269306-S2Open ↗
09/02/2026B08052644-I1Open ↗
Showing 3 of 67 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment68
▸BISEQUIPMENT USE PERMITS31
08/16/2022321188415Open ↗
07/29/2022321188415Open ↗
07/29/2022321188415Open ↗
Showing 3 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING24
09/29/2023321188415Open ↗
10/07/2021322027766Open ↗
Showing 2 of 24 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
07/29/2022321188415Open ↗
07/29/2022321188415Open ↗
07/29/2022321188415Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISTENANT PROTECTION PLAN AND NOTES4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE CHECKLIST4
11/12/2025340566346Open ↗
10/15/2021340566346Open ↗
Showing 2 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos1
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/21/2022340699792Open ↗
▸Energy Compliance37
▸DOB NOWEN2: As Built Energy Analysis16
08/29/2026B00748206-I1Open ↗
08/29/2026B00742953-I1Open ↗
09/01/2026B00462186-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
05/13/2022321188415Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/13/2022321188415Open ↗
▸BISELECTRIC MOTORS1
05/13/2022321188415Open ↗
▸BISLIGHTING CONTROLS1
05/13/2022321188415Open ↗
▸Inspections & Test Reports91
▸BISTECHNICAL REPORT: RESPONSIBILITY49
09/01/2022321986847Open ↗
08/18/2022321986847Open ↗
08/18/2022322008215Open ↗
Showing 3 of 49 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFUEL-GAS PIPING (WELDING)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/02/2022321188415Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
08/01/2022321188415Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/02/2022321188415Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs66
▸BISSCHEDULE A - OCCUPANCY / USE36
10/03/2025321188415Open ↗
09/18/2025321188415Open ↗
11/20/2024321188415Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/12/2025340815158Open ↗
12/23/2024340588983Open ↗
09/02/2022321986847Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/02/2022321986847Open ↗
08/22/2022322008215Open ↗
Showing 2 of 8 on file for this type
▸BISFINAL3
10/22/2024340815158Open ↗
03/28/2022340713259Open ↗
01/21/2022340699792Open ↗
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSWIMMING POOL: DEP APPROVAL1
06/17/2025321188415Open ↗
▸Cost, Insurance & Ownership32
▸BISPROJECT-SPECIFIC GL INSURANCE11
09/07/2022321188415Open ↗
07/27/2022321188415Open ↗
07/08/2022321188415Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT10
08/18/2022321986847Open ↗
08/18/2022322008215Open ↗
01/06/2022340725638Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
11/19/2024340815158Open ↗
11/19/2024340815158Open ↗
01/11/2022340725638Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)4
09/07/2022321188415Open ↗
08/30/2022321188415Open ↗
12/03/2021321188415Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
08/30/2022321188415Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms89
▸BISADDITIONAL INFORMATION58
10/28/2025340566346Open ↗
03/10/2025340815158Open ↗
11/03/2022322025759Open ↗
Showing 3 of 58 on file for this type
▸BISEFILING COVER SHEET13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
09/07/2022321188415Open ↗
08/30/2022321188415Open ↗
12/03/2021321188415Open ↗
Showing 3 of 7 on file for this type
▸Other Documents21
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMAINTENANCE INFORMATION1
05/13/2022321188415Open ↗
▸BISFIREPLACES1
05/13/2022321188415Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
05/13/2022321188415Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
11/01/2021321188415Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDoc 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type