← Back
BuildNYC
Elevator cooperative
1150 5TH AVENUE
MANHATTAN · BIN 1051437
💬 Discuss this project
1924Year Built
15Stories
D4Building Class
R10Zoning
163,969 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized29 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1150 Fifth Ave Owners · 15,138 sf lot · 10.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade inspection and repair outriggers system installationUnder Construction5p · 5 filings · 20 docs
PenthouseUnit PH, Unit PH8, Unit PHE23p · 3 filings · 20 docs
Floor 15Unit 15C11p · 2 filings · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11Unit 11A, Unit 11B, Unit 11E58p · 5 filings · 20 docs
Floor 10Unit 10A8p · 1 filing · 20 docs
Floor 9Unit 9C21p · 1 filing · 20 docs
Floor 8
Floor 7Unit 7D8p · 2 filings · 13 docs
Floor 6Unit 6A6p · 2 filings · 20 docs
Floor 5Unit 5A19p · 3 filings · 20 docs
Floor 4Unit 4D18p · 2 filings · 13 docs
Floor 3Unit 3C, Unit 3EUnder Construction20p · 2 filings · 20 docs
Floor 2Unit 2E1p · 1 filing · 5 docs
Floor 1Unit 1C8p · 3 filings · 18 docs
Mezzanine20p · 3 filings · 20 docs
CellarMechanical work for doctor's office renovation2p · 1 filing · 8 docs
BasementUnder Construction1p · 1 filing · 17 docs
Site & exteriorTemporary sidewalk shed installationUnder Construction25p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1150 Fifth Avenue Owners14603/22/2026
Mike807/08/2026
1150 Fifth Ave603/21/2026
Pomander Associates307/08/2026
1150 5th303/21/2026
1150 Owners203/21/2026
APT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Noel Building Consulting1603/21/2026
GC Expediting103/21/2026
Costa2603/21/2026
OI Architecture + Design803/21/2026
Arinnity NYC203/21/2026
Socotec203/21/2026
Amka & Associates203/21/2026
East Coast203/21/2026
Elizabeth Roberts Architecture103/21/2026
Ioad803/21/2026
KC Expediting403/21/2026
Xinos Construction203/21/2026
Code403/21/2026
Construction Permit Services203/21/2026
MK Associates403/21/2026
Permit Services203/21/2026
Node Architecture Engineering Con203/21/2026
AM Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold807/08/2026
Xinos ConstructionGeneral Contractor704/09/2026
Superior HVACspecialty_contractor507/08/2026
Hamilton Air CompanyGeneral Contractor504/09/2026
P & P Construction & PaintingGeneral Contractor507/08/2026
Euro Group Design GroupGeneral Contractor407/08/2026
Crafted Interiors DesignGeneral Contractor407/08/2026
Platinum Industries GroupGeneral Contractor303/21/2026
Abr Plumbing & Heating ContractingPlumbing307/08/2026
A&G DesignGeneral Contractor303/21/2026
Aircon Heating & CoolingGeneral Contractor307/08/2026
Gallery Restorationspecialty_contractor304/09/2026
Sagewood Construction & DGeneral Contractor307/08/2026
Ari GroupGeneral Contractor207/08/2026
Shah Group EnterprisesScaffold207/08/2026
Interperfect ConstructionGeneral Contractor207/08/2026
Joseph Weinstein ElectricElectrical203/22/2026
Ecs Electrical Contg ServiceElectrical203/22/2026
Superb Plumbing & HeatingPlumbing207/08/2026
Zatos Plumbing and HeatingPlumbing107/08/2026
Romcon ElectricElectrical103/21/2026
Applied ElectricElectrical103/21/2026
KJK ElectricElectrical103/22/2026
Lens ElectricElectrical103/22/2026
New Century Electrical ContractingElectrical103/21/2026
Slade ElectricElectrical103/21/2026
Vlashava Electric ContractingElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
Graham Plumbing CoFire Protection103/21/2026
Attic to Basement HomeGeneral Contractor107/08/2026
Bayside Refrigerationspecialty_contractor107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
NY Plumbing & HeatingPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
R.J.C. MechanicalPlumbing107/08/2026
Century Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369306/15/2026
OI Architecture + Design2636610/15/2025
Charles G Michel Engineering2871510/15/2025
Queens Engineering8898304/22/2025
Costa Architects & Engineering13211202/03/2025
Amr Engineering Consultan7449112/05/2024
Urban Integrations7993112/05/2024
Amka & Associates8239109/29/2023
NY Restoration Technology6187109/29/2023
Jack Green Associates422106/06/2023
Richard H. Balser Engineering3028203/28/2023
CBA5091103/08/2023
Markanics4600208/03/2022
Crafted Architecture6642207/19/2022
Ryan Special Engineering2018402/17/2022
Ase Engineering5785211/22/2021
Fiskaa Engineering807210/11/2021
HT Engineering6274201/10/2020
Building Lifecycle
All (300)Filed (58)Permit Issued (57)Signed Off (28)Facade (FISP) (6)Violation (41)Inspection (28)Objection (52)Special Inspection (30)
08/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2020 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00928159-I1
08/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Filed — Alteration
NEW PLUMBING WORK APT #3C. IN CONJUNCTION WITH #M01334670
M01334670-P1
06/09/2026
Permit issued — Sidewalk Shed
M00928159-I1-SH
05/18/2026
Special inspection requirement — Mechanical Systems
Luis Pichardo
05/18/2026
Special inspection requirement — Lighting in dwelling units
Luis Pichardo
05/18/2026
Special inspection requirement — Final
RONALD VILLANO
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
04/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Permit issued — Plumbing
M01334670-S1-PL
03/18/2026
Violation issued (ECB, open)
Construction
03/18/2026
Violation issued (ECB, open)
Construction
03/18/2026
Violation issued (ECB, open)
Construction
03/10/2026
Permit issued — General Construction
M01066170-I1-GC
03/10/2026
Permit issued — Suspended Scaffold
M01022199-I1-SC
03/06/2026
Permit issued — Sidewalk Shed
M00928159-I1-SH
02/02/2026
Permit issued — Mechanical Systems
M01334670-I1-GC
02/02/2026
Permit issued — Mechanical Systems
M01334670-I1-MS
12/24/2025
Filed — Alteration
NEW PLUMBING WORK APT #3C. IN CONJUNCTION WITH #M01334670
M01334670-I1
12/24/2025
Filed — Alteration
NEW PLUMBING WORK APT #3C. IN CONJUNCTION WITH #M01334670
M01334670-S1
12/18/2025
Signed off — Alteration
THE INSTALLATION OF TWO SPLIT SYSTEM AC SYSTEMS TO SERVE THE APARTMENT. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01052346-I1
12/15/2025
Permit issued — Mechanical Systems
M01052346-I1-MS
11/18/2025
Signed off — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-I1
11/18/2025
Signed off — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-S1
11/18/2025
Signed off — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-S2
11/13/2025
Permit issued — General Construction
M00939520-I1-GC
11/06/2025
Signed off — Alteration
Herewith filing for interior Demo and build out of Apt. 9C. No Change in Use, Egress or Occupancy.
M01114752-I1
10/31/2025
Signed off — Alteration
Herewith filing for interior Demo and build out of Apt. 9C. No Change in Use, Egress or Occupancy.
M01114752-S2
10/21/2025
Special inspection requirement — Final
Charles Michel
10/21/2025
Special inspection requirement — Mechanical Systems
Charles Michel
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Lee
10/15/2025
Filed — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-P4
10/15/2025
Filed — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-P3
10/08/2025
Special inspection requirement — Final
Charles Michel
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Lee
10/08/2025
Special inspection requirement — Mechanical Systems
Charles Michel
09/29/2025
Signed off — Alteration
Herewith filing for interior Demo and build out of Apt. 9C. No Change in Use, Egress or Occupancy.
M01114752-S1
09/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Special inspection requirement — Final
Steven Lee
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Lee
08/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2025
Permit issued — Sidewalk Shed
M00928159-I1-SH
07/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Filed — Alteration
THE INSTALLATION OF TWO SPLIT SYSTEM AC SYSTEMS TO SERVE THE APARTMENT. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01052346-P1
06/27/2025
Permit issued — General Construction
M01119289-I1-GC
05/23/2025
Permit issued — General Construction
M01119289-I1-GC
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2025
Filed — Alteration
Outriggers system installation for inspection of facade and repairs.
M01022199-P2
04/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Lee
04/04/2025
Filed — Alteration
Interior renovation to existing dwelling unit on 11th floor Apt. 11B. Work includes but not limited to removal & installation of non-load bearing partitions, cosmetic upgrades as per plans, replaced finishes, etc. No change in use, egress, or occupancy.
M01119289-P2
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Lee
03/31/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
03/31/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
03/21/2025
Permit issued — Suspended Scaffold
M01022199-I1-SC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offXinos Construction06/09/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I03/18/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction03/10/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction03/10/2026
DOB NOWSidewalk ShedSigned-offXinos Construction03/06/2026
DOB NOWMechanical SystemsPermit IssuedGallery Restoration02/02/2026
DOB NOWMechanical SystemsPermit IssuedGallery Restoration02/02/2026
DOB NOWMechanical SystemsSigned-offAircon Heating Cooling12/15/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction11/13/2025
DOB NOWSidewalk ShedSigned-offXinos Construction08/15/2025
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D06/27/2025
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D05/23/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction03/21/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction03/21/2025
DOB NOWMechanical SystemsSigned-offHamilton Air Company02/18/2025
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting02/13/2025
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group02/10/2025
DOB NOWMechanical SystemsSigned-offAircon Heating Cooling01/10/2025
DOB NOWPlumbingSigned-offM&G Plumbing and Heating01/09/2025
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D12/23/2024
DOB NOWGeneral ConstructionPermit IssuedXinos Construction12/12/2024
DOB NOWMechanical SystemsSigned-offHamilton Air Company12/11/2024
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group09/03/2024
DOB NOWSidewalk ShedSigned-offXinos Construction08/29/2024
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group04/25/2024
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting04/25/2024
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction03/26/2024
DOB NOWMechanical SystemsSigned-offInterperfect Construction01/31/2024
DOB NOWGeneral ConstructionPermit IssuedXinos Construction12/12/2023
DOB NOWMechanical SystemsSigned-offInterperfect Construction10/03/2023
DOB NOWGeneral ConstructionPermit IssuedHamilton Air Company09/07/2023
DOB NOWSidewalk ShedSigned-offXinos Construction09/01/2023
DOB NOWGeneral ConstructionSigned-offAri Group04/06/2023
DOB NOWMechanical SystemsSigned-offAri Group04/06/2023
DOB NOWPlumbingSigned-offP.S.I. Mechanical09/02/2022
DOB NOWGeneral ConstructionSigned-offA&G Design09/01/2022
DOB NOWMechanical SystemsSigned-offBayside Refrigeration06/27/2022
DOB NOWMechanical SystemsSigned-offP & P Construction & Painting10/18/2021
DOB NOWGeneral ConstructionSigned-offP & P Construction & Painting10/18/2021
DOB NOWPlumbingSigned-offR.J.C. Mechanical10/15/2021
+ 60 more permits on file
1 project · most recent 06/15/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Permit IssuedGallery RestorationAir Conditioning Systems
Cooling
— FJMA4X24L0 24,000 BTU · Ahu ×5
FMC4X2400AL 24,000 BTU · Ahu ×5
National Comfort NCP4244000 23,000 BTU · Condensing Unit ×10
2 projects · most recent 06/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/15/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
01/10/2020Signed-offZatos Plumbing and HeatingWater/Sanitary
21 projects · most recent 02/24/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedNion ElectricGeneral Wiring
01/12/2026CompleteTotal Electric SolutionsGeneral Wiring
06/10/2025Permit IssuedTower Electric—
06/01/2025CompleteHigh Impact ElectricGeneral Wiring
02/24/2025CompleteVlashava Electric Contracting—
01/31/2025CompleteMolloy ElectricHVAC Wiring
04/30/2024CompleteVlashava Electric Contracting—
03/05/2024CompleteAmsterdam ElectricGeneral Wiring
08/21/2023Permit IssuedEcs Electrical Contg ServiceGeneral Wiring
09/05/2022CompleteCresco ElectricalGeneral Wiring
10/17/2021CompleteVlashava Electric Contracting—
09/22/2021CompleteSolas Electrical ContractingGeneral Wiring
08/02/2021CompleteJoseph Weinstein ElectricGeneral Wiring
07/07/2021CompleteGsa ElectricGeneral Wiring
02/26/2020Permit IssuedE & M Electrical NYGeneral Wiring
1 project · most recent 09/06/2024
Sidewalk Shed
FiledStatusContractorScope
09/06/2024Signed-offXinos ConstructionSidewalk Shed
1 project · most recent 04/22/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/22/2025Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
08/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
05/18/2026HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
05/18/2026Energy Code Compliance InspectionsLuis Pichardoprogress
05/18/2026FinalRONALD VILLANOprogress
05/18/2026Lighting in dwelling unitsLuis Pichardoenergy_progress
05/18/2026Mechanical SystemsLuis Pichardospecial
10/21/2025FinalCharles Michelprogress
10/21/2025Mechanical SystemsCharles Michelspecial
10/21/2025Fire-Resistant Penetrations and JointsSteven Leespecial
10/08/2025Mechanical SystemsCharles Michelspecial
10/08/2025Fire-Resistant Penetrations and JointsSteven Leespecial
10/08/2025FinalCharles Michelprogress
09/03/2025FinalSteven Leeprogress
09/03/2025Fire-Resistant Penetrations and JointsSteven Leespecial
04/15/2025Fire-Resistant Penetrations and JointsSteven Leespecial
04/01/2025Fire-Resistant Penetrations and JointsSteven Leespecial
03/31/2025Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
03/31/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
01/30/2025HVAC-R and service water heating system controlsPaul Antonioenergy_progress
01/30/2025HVAC-R and service water heating equipmentPaul Antonioenergy_progress
01/30/2025HVAC-R and service water piping design and insulationPaul Antonioenergy_progress
01/30/2025Fire-Resistance Rated ConstructionPaul Antonioprogress
01/30/2025Fire-Resistant Penetrations and JointsPaul Antoniospecial
01/30/2025Energy Code Compliance InspectionsPaul Antonioprogress
01/30/2025Permanent certificatePaul Antonioenergy_progress
01/30/2025Maintenance informationPaul Antonioenergy_progress
Latest 25 of 133.
▾Documents — 1,579 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch53
09/06/2026M00001832-I1Request digital key ↗
09/06/2026M00053662-I1Request digital key ↗
09/03/2026M00543554-I1Request digital key ↗
Showing 3 of 53 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00280897-I1Request digital key ↗
09/04/2026M00378630-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00266450-I1Request digital key ↗
08/31/2026M00308355-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸Applications & Permits324
▸BISPLAN / WORK APPROVAL APPLICATION140
11/06/2023122691587Open ↗
09/11/2023122691587Open ↗
09/08/2023122691587Open ↗
Showing 3 of 140 on file for this type
▸BISWORK PERMIT APPLICATION132
01/05/2024122691587Open ↗
03/01/2023102594060Open ↗
10/16/2020122691587Open ↗
Showing 3 of 132 on file for this type
▸DOB NOWLPC Approval/Permit51
09/03/2026M00543554-I1Open ↗
09/03/2026M00556372-I1Open ↗
09/03/2026M00580519-P1Open ↗
Showing 3 of 51 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications361
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION133
01/29/2020123797962Open ↗
01/29/2020123797962Open ↗
12/11/2019123694519Open ↗
Showing 3 of 133 on file for this type
▸DOB NOWProgress Inspector Seal & Signature78
09/02/2026M01114752-I1Open ↗
09/02/2026M01114752-I1Open ↗
09/01/2026M00963236-P1Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/06/2026M00001832-I1Open ↗
09/04/2026M00378630-I1Open ↗
09/03/2026M00543554-I1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/02/2026M01114752-I1Open ↗
09/02/2026M01022199-P1Open ↗
09/02/2026M01022199-P1Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
01/29/2020123797962Open ↗
Showing 1 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/29/2020123797962Open ↗
Showing 1 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Trade Schedules & Equipment101
▸BISSELF-CERT PLUMBING NOTICE41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISSCHEDULE B - PLUMBING30
11/06/2023122691587Open ↗
02/23/2023102594060Open ↗
02/03/2023102594060Open ↗
Showing 3 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
06/07/2019101224006Open ↗
04/16/2019101224006Open ↗
04/01/2019122691587Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection31
▸BISTenant Protection Plan and Notes18
01/29/2020123797962Open ↗
10/04/2019140597771Open ↗
08/01/2019123689393Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos93
▸DOB NOWDEP ACP-5: Asbestos Assessment Report40
09/04/2026M00378630-I1Open ↗
09/03/2026M00543554-I1Open ↗
09/03/2026M00534085-I1Open ↗
Showing 3 of 40 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
01/29/2020123797962Open ↗
07/01/2019123689393Open ↗
Showing 2 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00580519-I1Open ↗
09/03/2026M00580478-I1Open ↗
09/03/2026M00580381-I1Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance106
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS53
01/29/2020123797962Open ↗
01/29/2020123797962Open ↗
10/23/2019140825276Open ↗
Showing 3 of 53 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
03/29/2021123797962Open ↗
10/23/2019140825276Open ↗
09/17/2019122978475Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
09/03/2026M00543554-I1Open ↗
09/03/2026M00580478-I1Open ↗
Showing 2 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/29/2021123797962Open ↗
03/25/2021123797962Open ↗
03/25/2021123797962Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY18
04/19/2023102594060Open ↗
04/19/2023102594060Open ↗
10/22/2021123689393Open ↗
Showing 3 of 18 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs159
▸BISLANDMARKS APPROVAL60
07/13/2020123689393Open ↗
01/29/2020123797962Open ↗
01/15/2020123694519Open ↗
Showing 3 of 60 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
04/19/2023102594060Open ↗
11/19/2021123694519Open ↗
10/22/2021123689393Open ↗
Showing 3 of 49 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
08/29/2019140597771Open ↗
08/29/2019140597771Open ↗
05/31/2019101224006Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSUPERSEDING LETTER6
03/01/2023102594060Open ↗
10/16/2020122691587Open ↗
05/13/2019122978475Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
10/22/2021123689393Open ↗
07/20/2021103523572Open ↗
03/29/2021123797962Open ↗
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership111
▸BISCOST AFFIDAVIT100
04/19/2023102594060Open ↗
10/22/2021123689393Open ↗
07/16/2021103523572Open ↗
Showing 3 of 100 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/19/2021123694519Open ↗
▸Filing & Intake Forms178
▸BISADDITIONAL INFORMATION79
11/13/2023122691587Open ↗
02/28/2023102594060Open ↗
11/06/2020122691587Open ↗
Showing 3 of 79 on file for this type
▸BISEFILING COVER SHEET49
01/29/2020123797962Open ↗
12/11/2019123694519Open ↗
07/01/2019123689393Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM41
01/05/2024122691587Open ↗
03/01/2023102594060Open ↗
02/07/2023102594060Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
06/27/2019101224006Open ↗
06/27/2019101224006Open ↗
Showing 2 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProof of Historic Building3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type