Whole building & multi-floor projectsProvide metal sign for storage cabinet1 filing
REMOVE FIRE HOSE RACKS AND INSTALL NEW FIRE HOSE CABINETS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
3 documents
RoofMarsh & McLennan4p · 4 filings · 20 docs
ArchitectureDMGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Interior demolition, white-box and restroom modifications on the 10th, 13th and roof as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 44th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of Skyfold partition system on the 44th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 45Marsh & McLennan1p · 1 filing · 3 docs
Plumbing
Issued Permit Scope
Plumbing
Modifications to the existing plumbing system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 44Marsh & McLennan15p · 11 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing HVAC system on the 44th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 44th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
11 documents · 5 drawing sheets
Modifications to the existing plumbing system on the 43rd and 44th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 43Marsh & McLennan12p · 8 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to the existing plumbing system on the 43rd and 44th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Modifications to the existing plumbing system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 42Marsh & McLennan12p · 6 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing plumbing system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing standpipe system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing sprinkler system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 41Marsh & McLennan10p · 6 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing plumbing system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing standpipe system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing sprinkler system (Phase 3) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 40Marsh & McLennan8p · 7 filings · 17 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Minor demolition with of interior partitions, doors, suspended ceilings and finishes on the 38-40th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 38-30th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 38-40th- floors (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 39Marsh & McLennan7p · 6 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Minor demolition with of interior partitions, doors, suspended ceilings and finishes on the 38-40th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 38-30th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 38-40th- floors (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 38Marsh & McLennan6p · 3 filings · 11 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Minor demolition with of interior partitions, doors, suspended ceilings and finishes on the 38-40th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 38-30th floor (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 38-40th- floors (Oliver Wyman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 37Marsh & McLennanUnder Construction23p · 10 filings · 17 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the 37 floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition with of interior partitions, doors, suspended ceilings and finishes on the 37 floor as per plans. No change to use, egress or occupancy.
On file for this project
5 drawing sheets
Modifications to the existing plumbing system on the 36th and 37th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 10 filings on this floor.
Floor 36Marsh & McLennan20p · 8 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 34th, 35th and 36th floors (MMC) as per plans. no change to use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Modifications to the existing HVAC system on the 36th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to the existing sprinkler system on the 36th floor (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 35Marsh & McLennan16p · 13 filings · 17 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications for new stair between the 34th and 35th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 34th, 35th and 36th floors (MMC) as per plans. no change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Structural modifications for new stair between the 34th and 35th floors (MMC Phase 4) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 4 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 34Marsh & McLennan17p · 16 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing HVAC system on the 31st and 34th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing sprinkler system on the 31st and 34th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Structural modifications for new stair between the 34th and 35th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 16 filings on this floor.
Floor 33Marsh & McLennan4p · 3 filings · 17 docs
CivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe
Modifications to the existing plumbing system on the 33rd, 34th and 35th floors (MMC Phase 4) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new plumbing fixtures and associated piping on the 30th, 31st, 32nd, 33rd and 34th floors (MMC- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Installation of new HVAC equipment and piping on the 31st, 32nd, 33rd and 34th floors (MMC- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
29 documents · 2 drawing sheets
Floor 32Cbre, INC5p · 7 filings · 17 docs
CivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Installation of new sprinkler heads and piping with removal of existing temporary loops on the 31st and 32nd floors (MMC- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 1 drawing sheet
Removal of existing sprinkler heads and piping with installation of temporary loops on the 31st, 32nd and 34th floors (MMC- Demo Phase) as per plans. No change to use, egress or occupancy.
On file for this project
11 documents
Modifications to the existing standpipe system on the 31st, 32nd and 34th floors (MMC- Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 31Marsh & McLennan, Cohen & Steers7p · 12 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing HVAC system on the 31st and 34th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 31st and 34th floors (MMC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 34th, 35th and 36th floors (MMC) as per plans. no change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 30Cohen & Steers, Marsh & McLennan12p · 13 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition associated with stair opening (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of a new HVAC system on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 13 filings on this floor.
Floor 29Cohen & Steers, Marsh & McLennan13p · 12 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition associated with stair opening (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of a new HVAC system on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 12 filings on this floor.
Floor 28Cohen & Steers, Marsh & McLennan15p · 11 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition associated with stair opening (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of a new HVAC system on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 27Cohen & Steers, Marsh & McLennan14p · 12 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition associated with stair opening (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Installation of a new HVAC system on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
13 documents · 3 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 27th through 30th floors (Cohen & Steers) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 12 filings on this floor.
Floor 26Marsh & McLennan17p · 9 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on 26th floors (MMC) as per plans. no change to use, egress or occupancy.
On file for this project
5 documents · 3 drawing sheets
Removal of existing sprinkler systems with installation of temporary loops as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Modifications to the existing HVAC system as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 25Lek Consulting, Marsh & McLennan18p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the (24th and 25th floors L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Minor demolition with interior partitions, doors, suspended ceilings and finishes on the (24th-25th floors L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Modifications to the existing HVAC system on the (24th-25th floor L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 1 drawing sheet
Latest 3 of 16 filings on this floor.
Floor 24Lek Consulting, Marsh & McLennan20p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the (24th and 25th floors L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Minor demolition with interior partitions, doors, suspended ceilings and finishes on the (24th-25th floors L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Modifications to the existing HVAC system on the (24th-25th floor L.E.K.) as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 23Marsh & McLennan8p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural Modification on the 23rd floor as per plans (NERA- Stair Infill.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modification to the existing plumbing system on the 23rd floor (NERA-Buildout) as per plans. No change to use, egress or occupancy
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 23rd floor (NERA-Buildout Phase) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 9 filings on this floor.
Floor 22
Floor 211166 A Of A Condominium4p · 2 filings · 8 docs
Fire Protection
Issued Permit Scope
Standpipe
Interior renovation as per plans filed herewith.
On file for this project
5 documents · 8 drawing sheets
Modification to Mechanical Systems as per plans filed herewith.
On file for this project
3 documents · 3 drawing sheets
Floor 20William Blair10p · 3 filings · 17 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
24 documents · 6 drawing sheets
Modification to existing Sprinkler system as per plans filed herewith. Modification to existing standpipe system as per plans filed herewith.
On file for this project
12 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
21 documents · 3 drawing sheets
Floor 19William Blair10p · 10 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Sprinkler work filed in conjunction with a tenant fit out. No change to use, egress, or occupancy.
On file for this project
7 documents · 3 drawing sheets
DEMOLITION AND INSTALLATION ON INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents · 3 drawing sheets
New VAV boxes and ductwork distribution to support the new architectural program. No change to use, egress, or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 18RT Specialty1p · 7 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Installation of a new sprinkler system with removal of temporary loop on the 18th floor (RT Specialty) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Installation of new plumbing fixtures and associated piping on the 18th floor (RT Specialty) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new partitions, doors, suspended ceilings and finishes on the 18th Floor (RT Specialty) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 17Axis4p · 10 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Axis Capital) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 17th floor (Axis Capital) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Axis Capital) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 10 filings on this floor.
Floor 16Fti Consulting3p · 7 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Office Fit-out Floors 14, Partial 15, & 16 as shown on plans filed herewith no change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
7 documents
STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 15Marsh & McLennan, Fti Consulting6p · 10 filings · 17 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Replacement of air conditioning unit on 15th floor IT room. No change in use egress and occupancy.
On file for this project
9 documents
Filing an Alteration type 1 application for change of occupancy and establishment of place of assembly on the 15th floor as per plans filed herewith.
On file for this project
3 documents · 2 drawing sheets
Office Fit-out Floors 14, Partial 15, & 16 as shown on plans filed herewith no change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 14Fti Consulting8p · 10 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Office Fit-out Floors 14, Partial 15, & 16 as shown on plans filed herewith no change in use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
7 documents
STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 1310th, 13th, and 0th floor demolition and construction2 filings · 6 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Standpipe
Interior demolition, white-box and restroom modifications on the 10th, 13th and roof as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC system on the cellar, 2nd, 10th and 13th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Floor 12EJM, TD Bank14p · 22 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications & new installations to existing Plumbing, Sprinkler and Standpipe Systems on the 12th floor as per plans. No change to use, egress or occupancy.
On file for this project
14 documents
Installation of new interior partitions, doors, suspended ceilings and finishes on the 12th floor as per plans. No change to use, egress or occupancy.
On file for this project
9 documents
Mechanical Modifications on the 12th floor as per plans. No change to use, egress or occupancy.
On file for this project
29 documents
Latest 3 of 22 filings on this floor.
Floor 11Cnaor6p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modification to the existing plumbing system on the 11th floor (CNA) as per plans. No change to use, egress or occupancy
On file for this project
5 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 11th Floor (CNA) as per plans. no change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing sprinkler system on the 11th floors (CNA) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 10FDIC Federal Deposit FederalDeposit Insurance, D. E. Shaw29p · 15 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition with interior partitions, doors, suspended ceilings and finishes (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
13 documents
Modifications to the existing plumbing system on the 10th floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Interior demolition, white-box and restroom modifications on the 10th, 13th and roof as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 15 filings on this floor.
Floor 9Fdic, FDIC Federal Deposit FederalDeposit Insurance +37p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications & new installations to existing Plumbing, Sprinkler and Standpipe Systems (FDIC Office Build Out) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
New Installation & Modifications to the existing HVAC system (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
59 documents
Minor demolition with interior partitions, doors, suspended ceilings and finishes (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 13 filings on this floor.
Floor 8FDIC Federal Deposit Insurance, Fdic +218p · 14 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Interior alteration to the 8th floor to include assembly space in conjunction with current business use occupancy. Filed in conjunction with PA M01334767-I1.
On file for this project
11 documents · 3 drawing sheets
Modifications & new installations to existing Plumbing, Sprinkler and Standpipe Systems (FDIC Office Build Out) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents
New Installation & Modifications to the existing HVAC system (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
59 documents
Latest 3 of 14 filings on this floor.
Floor 7Fdic, FDIC Federal Deposit FederalDeposit Insurance +26p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications & new installations to existing Plumbing, Sprinkler and Standpipe Systems (FDIC Office Build Out) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents
New Installation & Modifications to the existing HVAC system (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
59 documents
Minor demolition with interior partitions, doors, suspended ceilings and finishes (FDIC Office Build Out) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 12 filings on this floor.
Floor 6
Floor 5D. E. Shaw2p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Modifications to the existing HVAC system on the 5th FL (DESCO Restack) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 5th FL (DESCO Restack) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor demolition to the existing space, installation of new partitions, doors, ceilings and finishes on the 5th FL (DESCO Restack) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Floor 423 filings · 17 docs
ArchitectureCivilFire ProtectionGeneralLandscapeStructural
Issued Permit Scope
Standpipe
No filed description on record for this project.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
2 documents
Latest 3 of 23 filings on this floor.
Floor 3D. E. Shaw, Litinvest +126p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Plumbing Modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to existing Mechanical system. No change to use, egress, or occupancy.
On file for this project
14 documents · 4 drawing sheets
Interior Renovations as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
11 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2T-Mobile, T-mobi2p · 5 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modifications to the existing HVAC system on the cellar, 2nd, 10th and 13th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing sprinkler system (T-Mobile) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing HVAC system on the 2nd floor (T-Mobile) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 1Ground Central, Marsh & McLennan1p · 4 filings · 17 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Standpipe
FILED HEREWITH INTERIOR FIT OUT OF PARTIAL 1ST FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
install new plumbing fixtures at first floor. provide water piping underground for cafe. no change in use, egress or occupancy.
On file for this project
4 documents
cafe interior fit out including under and above ground plumbing to be filed under separate application. cabinetry and coffee shop equipment installation. new electrical & lighting throughout. no change in use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
CellarGround Central1p · 4 filings · 17 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Supported Scaffold
Modifications to the existing HVAC system on the cellar, 2nd, 10th and 13th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the cellar level (PRV Station) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
install new plumbing fixtures at first floor. provide water piping underground for cafe. no change in use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Site & exteriorMarsh & McLennanUnder Construction9 filings · 20 docs
ArchitectureElectricalGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Sign
INSTALL EXTERIOR ILLUMINATED WALL SIGN (MARSH)
On file for this project
3 documents · 1 drawing sheet
INSTALL EXTERIOR ILLUMINATED WALL SIGN (MARSH)
On file for this project
3 documents
INSTALL EXTERIOR ILLUMINATED WALL SIGN (MARSH)
On file for this project
3 documents
Latest 3 of 9 filings on this floor.