Condo, residential tower (mixed-use, multi-family elevator) [derived]
Galleria
117 EAST 57TH STREET · BIN 1036926
💬 Discuss this project
1975Year Built
57Stories
RMBuilding Class
C5-3Zoning
453,533 sfGross Floor Area
231Units
LL97 CoveredRent Stabilized21 Active Violations 20 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The Galleria Condominium · 17,272 sf lot · 26.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 6 docs
PenthouseUnit PH1 filing · 2 docs
Floor 51Unit 51A10p · 2 filings · 20 docs
Floor 50
Floor 49
Floor 48Unit 48FUnder Construction5p · 1 filing · 14 docs
Floor 47
Floor 46
Floor 45Unit 45G, Unit 45H8p · 2 filings · 20 docs
Floor 44Unit 44A6p · 1 filing · 19 docs
Floor 43Unit 43CD9p · 4 filings · 20 docs
Floor 42
Floor 41
Floor 40Unit 40D, Unit 40E9p · 3 filings · 20 docs
Floor 39Unit 39C, Unit 39D4p · 1 filing · 6 docs
Floor 38
Floor 37
Floor 36Unit 36CD9p · 1 filing · 10 docs
Floor 35Unit 35A, Unit 35C, Unit 35D16p · 6 filings · 20 docs
Floor 34Unit 34C12p · 2 filings · 20 docs
Floor 33Unit 33A, Unit 33H, Unit 33CDUnder Construction17p · 5 filings · 20 docs
Floor 32Unit 32GUnder Construction7p · 1 filing · 9 docs
Floor 31
Floor 30
Floor 29
Floor 28Unit 28A, Unit 28B, Unit 28E +243p · 4 filings · 20 docs
Floor 27Unit 27A15p · 3 filings · 20 docs
Floor 26Unit 26G, Unit 26H, Unit 27BUnder Construction13p · 3 filings · 20 docs
Floor 25Unit 25A5p · 1 filing · 12 docs
Floor 24
Floor 23
Floor 22Unit 22H3p · 1 filing · 8 docs
Floor 21Unit 21FG1 filing · 4 docs
Floor 20Unit 20A10p · 1 filing · 18 docs
Floor 19Unit 19A12p · 1 filing · 20 docs
Floor 18
Floor 17
Floor 16The Moinian Group1p · 1 filing · 3 docs
Floor 15
Floor 14
Floor 13
Floor 12natology Clinic, Russak Dermatology12p · 5 filings · 20 docs
Floor 11Generation Next Fertility14p · 3 filings · 20 docs
Floor 10Northwell Health71p · 3 filings · 20 docs
Floor 9The Moinian GroupUnder Construction1p · 2 filings · 9 docs
Floor 8The Moinian GroupUnder Construction1p · 2 filings · 9 docs
Floor 7The Moinian GroupUnder Construction1p · 3 filings · 13 docs
Floor 6The Moinian Group36p · 4 filings · 20 docs
Floor 5The Moinian Group1p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1The Moinian Group7p · 4 filings · 20 docs
CellarRelocate fire department connections3p · 1 filing · 20 docs
Sub-CellarRelocate fire department connections2p · 1 filing · 20 docs
Site & exteriorRelocate fire department connections9p · 3 filings · 20 docs
Filed — no permit issuedLimited Exterior Repair4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Moinian Group14609/18/2026
Eldad Prime7003/21/2026
Eldad Realty3303/21/2026
Board of Managers, Galleria Cond2903/21/2026
Elad1503/21/2026
SKY 511207/08/2026
The Gallery 57 NYC1103/22/2026
SKY Tower803/21/2026
117 East Holding607/08/2026
SKY 4603/21/2026
Bara Holding603/21/2026
Tarbin Holdings403/21/2026
Tel Aviv Realty Holding403/21/2026
LC & LH Realty303/21/2026
SKY 48A Realty303/21/2026
Grumley Haft303/21/2026
E.S. Gordon Co303/21/2026
Wendy's203/21/2026
38CD Realty203/21/2026
110 East 58th Street203/21/2026
Efrain Jimenez JR Gen Contractor103/22/2026
Goodview Realty103/21/2026
BI 117 East 67th Street 21H103/21/2026
Laszlo N. Tauber & Associates103/21/2026
Edward S. Gordon Co103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA Design Group3403/21/2026
Custodio Consulting1603/21/2026
Youber Design403/21/2026
Idm Associates1403/21/2026
Noel Building Consulting1403/21/2026
Rip CC803/21/2026
Socotec603/21/2026
Favio Maria Barrionuevo1203/21/2026
Seay-Yarbrough403/21/2026
Municipal Building Consultants703/21/2026
Faks Group803/21/2026
A+ Expediting603/21/2026
Cornerstone Consulting103/21/2026
Richard Wainer Architect403/21/2026
Paul Fusco Consulting203/21/2026
Gillman Consulting203/21/2026
JS Architecture Design203/21/2026
Synchron Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality Renovation IGeneral Contractor2107/08/2026
The Venetian GroupGeneral Contractor707/08/2026
Procore MechanicalPlumbing607/08/2026
Orbit Plumbing & HeatingPlumbing607/08/2026
Rinnovo ConstructionGeneral Contractor607/08/2026
Masters Renovation Group*General Contractor407/08/2026
On-Site Demo & TruckingGeneral Contractor407/08/2026
Orbit SprinklerFire Protection407/08/2026
Big Apple Designs and EnvironmentalGeneral Contractor404/09/2026
Blue Square ConstructionGeneral Contractor407/08/2026
Metrotech MechanicalPlumbing407/08/2026
G.R. & J Hub Home ImproveGeneral Contractor407/08/2026
Traditional LineGeneral Contractor307/08/2026
D. Merlo ConstructionGeneral Contractor303/21/2026
New York Park Plumbing & Heating CoPlumbing307/08/2026
CJ Heating & MechanicalPlumbing307/08/2026
Amn PlumbingPlumbing307/08/2026
Rinnovo ConstructionScaffold303/21/2026
Lex InteriorsGeneral Contractor303/21/2026
Sage BuildersGeneral Contractor304/09/2026
Premier SanitationGeneral Contractor303/21/2026
A to Z Construction GroupGeneral Contractor307/08/2026
VSP MechanicalPlumbing207/08/2026
Laredo ElectricElectrical203/22/2026
Village Electl ContractorsElectrical203/21/2026
4 Corners Construction GroupGeneral Contractor203/21/2026
Gallery Restorationspecialty_contractor208/16/2026
Merlo ConstructionGeneral Contractor204/09/2026
A&A PlumbingPlumbing207/08/2026
Copper ServicesPlumbing207/08/2026
Empire PlumbingPlumbing207/08/2026
FirequestFire Protection207/08/2026
Flow-Right Fire SuppFire Protection207/08/2026
Macreddin Plumbing & HeatingPlumbing207/08/2026
Mega PlumbingFire Protection207/08/2026
Practical Plumbing & HeatingPlumbing207/08/2026
S&H PlumbingPlumbing207/08/2026
Sound Refrigeration & Airspecialty_contractor107/08/2026
Flemington Electrical Maintenance IElectrical103/21/2026
Metro Electrical ContractorsElectrical103/22/2026
Zitan BiltGeneral Contractor107/08/2026
Everest ScaffoldingScaffold107/08/2026
Li ZhengElectrical103/21/2026
Irwin Electr'l Contractors, IElectrical103/21/2026
Absolute Plumbing & Heating & MechanicalPlumbing107/08/2026
A. Heating and Plumbing WorksPlumbing107/08/2026
Altair Plumbing and HeatingPlumbing107/08/2026
KJK ElectricElectrical103/21/2026
Aqueduct MechanicalPlumbing107/08/2026
Astoria P & HPlumbing107/08/2026
Branch PlumbingPlumbing107/08/2026
Budget Plumbing & HeatingPlumbing107/08/2026
Jorob Contracting & Electrical CoElectrical103/22/2026
CK Plumbing & MechanicalPlumbing107/08/2026
DVM Electrical ServicesElectrical103/22/2026
So Plumbing & HeatingPlumbing107/08/2026
Denmar ElectricElectrical103/22/2026
Reliable Plumbing & HeatingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/28/2026
LG Elite PlumbingPlumbing107/08/2026
Coachmen ElectricElectrical103/22/2026
SKH MechanicalFire Protection107/08/2026
Jeco Electrical ServiceElectrical103/21/2026
Dimar ServicesGeneral Contractor109/18/2026
Eis Electric Corp DbaElectrical103/21/2026
Glendale Electl ContngElectrical103/22/2026
Shally Electrical CoElectrical103/21/2026
Pebble CraftGeneral Contractor104/09/2026
A.T. Elect'l ConstructionElectrical103/21/2026
Renovation-Plus ConstructionGeneral Contractor107/08/2026
R-2 ElectricElectrical103/22/2026
RK DesignGeneral Contractor106/28/2026
Power Surge ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B World Consulting5704306/18/2026
Buildtech Engineering6369105/30/2026
Aminov Design Engineer, P9365205/27/2026
Sustainable Design Engineering1404109/12/2025
NS Engineers1442109/12/2025
Ace Structural Engineering496309/05/2025
Geiger Engineering689604/22/2025
HRF Services5616311/20/2024
Bazini Engineering1808111/07/2024
Edra Engineering & Inspec2820107/29/2024
Custodio Consulting1835206/27/2024
Benazzi Engineering5603705/30/2024
Technical Systems Review7409404/24/2024
AK Consulting Services, I6198601/13/2024
SPACE4ARCHITECTURE5306109/15/2023
Outsource Special Inspection2827709/01/2023
Thomas E. Haynes Architects3775407/06/2023
AA Building & Inspection1519212/12/2022
New Age Engineering7746311/04/2022
Ase Engineering5785205/26/2022
Walter T. Gorman, P.E., P268405/16/2022
Richard Kreshtool Architects2867401/03/2022
AK Engineering678111/01/2021
Yao W Guo Architect1754207/19/2021
IP Group2542111/24/2020
Lu Ning Architecture, PLL1155410/16/2020
Lawrence V McDonald Architects6039104/18/2020
Ryan Special Engineering2018101/23/2020
Building Lifecycle
All (300)Filed (59)Permit Issued (55)Signed Off (30)Violation (7)Inspection (39)Objection (80)Special Inspection (30)
09/28/2026
Signed off — Alteration
Plumbing in conjunction with M01055733-I1 for minor interior work - replace existing fixtures
M01055733-S1
09/17/2026
Permit issued — General Construction
M00828592-I1-GC
08/14/2026
Permit issued — General Construction
M01393682-I1-GC
07/27/2026
Permit issued — Plumbing
M01393682-S1-PL
07/27/2026
Permit issued — General Construction
M01393682-I1-GC
07/23/2026
Filed — Alteration
HEREBY FILING GENERAL CONSTRUCTION TO 35TH FLOOR UNIT 35D TEMPORARY PARTITION INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01425518-I1
07/21/2026
Signed off — Alteration
INTERIOR PLUMBING WORK IN UNIT 19A. REPLACEMENT OF FIXTURES IN BATHROOMS AND KITCHEN.
M01256712-I1
07/17/2026
Objection resolved — Addressed
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Esther Cheung
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARK AMINOV
07/10/2026
Special inspection requirement — Post-installed Anchors
MARK AMINOV
07/10/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
07/10/2026
Special inspection requirement — Final
Esther Cheung
07/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Esther Cheung
07/09/2026
Objection raised — Cost
06/24/2026
Objection resolved — Resolved
06/23/2026
Signed off — Alteration
APPLICATION FILED FOR PL WORK FOR BATHROOM FIXTURE REPLACEMENT & RELOCATION. NO CHAGE TO EGGRESS, USE OR OCCUPANCY
M01070147-I1
06/18/2026
Filed — Alteration
Installation of new helical ties in work areas. No change to use, egress, or occupancy.
M01414410-I1
06/18/2026
Filed — Alteration
APPLICATION FILED FOR PL WORK FOR BATHROOM FIXTURE REPLACEMENT & RELOCATION. NO CHAGE TO EGGRESS, USE OR OCCUPANCY
M01070147-P1
06/18/2026
Special inspection requirement — Final
CHARLES MALLEA
06/17/2026
Objection raised — Cost
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Accessibility
06/12/2026
Objection raised — Accessibility
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/11/2026
Special inspection requirement — Post-installed Anchors
Alexander Bomstein
06/10/2026
Objection resolved — Addressed
06/10/2026
Special inspection requirement — Post-installed Anchors
06/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/09/2026
Special inspection requirement — Final
Yakov Weinstein
06/08/2026
Objection resolved — Addressed
06/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Cost
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
06/01/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/30/2026
Filed — Alteration
INTERIOR RENOVATION IN APT. #32G. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01393682-I1
05/30/2026
Filed — Alteration
INTERIOR RENOVATION IN APT. #32G. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01393682-S1
05/28/2026
Special inspection requirement — Final
RAFFAELLA BORTOLUZZI
05/27/2026
Filed — Alteration
INTERIOR PLUMBING WORK IN UNIT 19A. REPLACEMENT OF FIXTURES IN BATHROOMS AND KITCHEN.
M01256712-P1
05/15/2026
Violation issued (ECB, closed)
Elevators
05/08/2026
Violation issued (ECB, open)
Unknown
05/06/2026
Filed — Alteration
cap and remove plumbing fixtures. relocate plumbing fixtures and install new plumbing fixtures.
M00903103-P1
05/06/2026
Filed — Alteration
cap and remove plumbing fixtures. relocate plumbing fixtures and install new plumbing fixtures.
M00903103-P2
05/01/2026
Signed off — Alteration
APPLICATION FILED FOR PL WORK FOR BATHROOM FIXTURE REPLACEMENT & RELOCATION. NO CHAGE TO EGGRESS, USE OR OCCUPANCY
M01070147-S1
04/30/2026
Special inspection requirement — Final
RAFFAELLA BORTOLUZZI
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
04/28/2026
Special inspection requirement — Lighting in dwelling units
Luis Pichardo
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Esther Cheung
04/28/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
04/28/2026
Special inspection requirement — Final
Esther Cheung
04/28/2026
Special inspection requirement — Final
RONALD VILLANO
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARK AMINOV
04/28/2026
Special inspection requirement — Post-installed Anchors
MARK AMINOV
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Esther Cheung
04/08/2026
Signed off — Alteration
INTERIOR PLUMBING WORK IN UNIT 19A. REPLACEMENT OF FIXTURES IN BATHROOMS AND KITCHEN.
M01256712-S1
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Inspection — Certified Storm Drainage-ST-Piping-Water Test
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDimar Services09/17/2026
DOB NOWGeneral ConstructionPermit IssuedGallery Restoration08/14/2026
DOB NOWGeneral ConstructionPermit IssuedGallery Restoration07/27/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I07/27/2026
DOB NOWGeneral ConstructionPermit IssuedBig Apple Designs and Environmental02/05/2026
DOB NOWGeneral ConstructionPermit IssuedMerlo Construction12/12/2025
DOB NOWGeneral ConstructionPermit IssuedPebble Craft11/14/2025
DOB NOWPlumbingPermit IssuedAstoria P & H11/14/2025
DOB NOWPlumbingSigned-offBudget Plumbing & Heating10/21/2025
DOB NOWPlumbingSigned-offCJ Heating & Mechanical10/21/2025
DOB NOWGeneral ConstructionPermit IssuedBig Apple Designs and Environmental10/16/2025
DOB NOWGeneral ConstructionSigned-offRK Design08/27/2025
DOB NOWPlumbingSigned-offPractical Plumbing & Heating08/26/2025
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical08/14/2025
DOB NOWSprinklersSigned-offFirequest07/25/2025
DOB NOWGeneral ConstructionPermit IssuedMerlo Construction05/01/2025
DOB NOWPlumbingSigned-offD.H. Eagle Plumbing04/24/2025
DOB NOWGeneral ConstructionSigned-off4 Corners Construction Group04/09/2025
DOB NOWGeneral ConstructionSigned-offSage Builders03/11/2025
DOB NOWPlumbingSigned-offCJ Heating & Mechanical12/17/2024
DOB NOWMechanical SystemsSigned-offSound Refrigeration & Air11/20/2024
DOB NOWPlumbingSigned-offCJ Heating & Mechanical11/04/2024
DOB NOWGeneral ConstructionSigned-offRenovation-Plus Construction10/31/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/27/2024
DOB NOWGeneral ConstructionSigned-offMasters Renovation Group*09/27/2024
DOB NOWStructuralSigned-offMasters Renovation Group*09/27/2024
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co08/29/2024
DOB NOWPlumbingSigned-offPractical Plumbing & Heating08/14/2024
DOB NOWGeneral ConstructionPermit IssuedD. Merlo Construction07/25/2024
DOB NOWGeneral ConstructionSigned-offSage Builders07/25/2024
DOB NOWSprinklersSigned-offFirequest07/22/2024
DOB NOWPlumbingSigned-offAltair Plumbing and Heating07/09/2024
DOB NOWMechanical SystemsSigned-offA to Z Construction Group06/04/2024
DOB NOWGeneral ConstructionSigned-offHigh Quality Renovation I12/22/2023
DOB NOWGeneral ConstructionSigned-offA to Z Construction Group12/11/2023
DOB NOWGeneral ConstructionSigned-offA to Z Construction Group11/21/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/05/2023
DOB NOWGeneral ConstructionSigned-offHigh Quality Renovation I09/21/2023
DOB NOWPlumbingPermit IssuedA&A Plumbing06/26/2023
DOB NOWGeneral ConstructionPermit IssuedKai Consulting05/03/2023
+ 60 more permits on file
2 projects · most recent 05/16/2022
Associated Ducts and Piping Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/16/2022Signed-offThe Venetian GroupAssociated Ducts and Piping
Ducts & Piping
N/A n/a Ductwork ×1
11/01/2021Permit IssuedRinnovo ConstructionAir Conditioning Systems, Associated Ducts and Piping
Cooling
Berner AHC10-2048E 1,896 CFM · Air Curtain ×1
Ducts & Piping
N/A N/A Ductwork ×1
2 projects · most recent 11/04/2022
FiledStatusContractorScope
11/04/2022Permit IssuedOrbit Sprinkler2 heads, 2 outlets
05/13/2022Permit IssuedSKH Mechanical—
9 projects · most recent 05/30/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/30/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
05/06/2026Permit IssuedAstoria P & HGas, Water/Sanitary
09/12/2025Signed-offBudget Plumbing & HeatingWater/Sanitary
11/20/2024Signed-offCJ Heating & MechanicalGas, Water/Sanitary
01/13/2024Signed-offNew York Park Plumbing & Heating CoWater/Sanitary
05/16/2023——Gas, Water/Sanitary
05/13/2022——Water/Sanitary
04/18/2020Permit IssuedProcore MechanicalGas, Water/Sanitary
09/17/2019Permit IssuedAqueduct MechanicalGas, Water/Sanitary
25 projects · most recent 10/20/2026
General Wiring Lighting
FiledStatusContractorScope
10/20/2026CompleteElectrician NYC—
10/15/2026Permit IssuedBruni ElectricGeneral Wiring
10/12/2026Permit IssuedBruni ElectricGeneral Wiring
10/12/2026Permit IssuedBruni ElectricGeneral Wiring
10/08/2026Permit IssuedBruni ElectricGeneral Wiring
10/08/2026Permit IssuedBruni ElectricGeneral Wiring
10/08/2026Permit IssuedBruni ElectricGeneral Wiring
10/08/2026Permit IssuedBruni ElectricGeneral Wiring
09/28/2026Permit IssuedDaven ElectricGeneral Wiring
09/25/2026Permit IssuedBruni ElectricGeneral Wiring
09/25/2026Permit IssuedBruni ElectricGeneral Wiring
09/24/2026Permit IssuedBruni ElectricGeneral Wiring
09/23/2026Permit IssuedBruni ElectricGeneral Wiring
09/22/2026Permit IssuedBruni ElectricGeneral Wiring
09/22/2026Permit IssuedBruni ElectricGeneral Wiring
1 project · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026——1 scope_items
▾Field Inspections (DOB CAP) — 65
DateTypeResultReport
06/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 65.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/10/2026Post-installed AnchorsMARK AMINOVspecial
07/10/2026Fire-Resistant Penetrations and JointsMARK AMINOVspecial
07/10/2026Lighting in dwelling unitsEsther Cheungenergy_progress
07/10/2026Fire-Resistance Rated ConstructionEsther Cheungprogress
07/10/2026FinalEsther Cheungprogress
07/10/2026Energy Code Compliance InspectionsEsther Cheungprogress
06/18/2026FinalCHARLES MALLEAprogress
06/11/2026Post-installed AnchorsAlexander Bomsteinspecial
06/11/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
06/10/2026Post-installed Anchors—special
06/10/2026Tenant Protection Plan Compliance—special
06/09/2026FinalYakov Weinsteinprogress
05/28/2026FinalRAFFAELLA BORTOLUZZIprogress
04/30/2026FinalRAFFAELLA BORTOLUZZIprogress
04/28/2026FinalRONALD VILLANOprogress
04/28/2026Fire-Resistant Penetrations and JointsMARK AMINOVspecial
04/28/2026Post-installed AnchorsMARK AMINOVspecial
04/28/2026Energy Code Compliance InspectionsEsther Cheungprogress
04/28/2026FinalEsther Cheungprogress
04/28/2026Fire-Resistance Rated ConstructionEsther Cheungprogress
04/28/2026Lighting in dwelling unitsEsther Cheungenergy_progress
04/28/2026Lighting in dwelling unitsLuis Pichardoenergy_progress
04/28/2026Energy Code Compliance InspectionsLuis Pichardoprogress
09/22/2025Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
08/05/2025Fire-Resistance Rated ConstructionKenny Makprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
natology ClinicMedical / HealthcareFloor 12
Project M00842402 Alteration · LOC Issued · 04/24/2024
Project M00842425 Alteration · LOC Issued · 04/24/2024
Project M00844623 Alteration · LOC Issued · 04/24/2024
Russak DermatologyMedical / HealthcareFloor 12
Project M00842072 Alteration · LOC Issued · 10/04/2023
Northwell HealthMedical / HealthcareFloor 10
Project M08033154 Alteration · Permit Entire · 11/22/2022
Project M08033177 Alteration · Permit Entire · 11/22/2022
Project M08033201 Alteration · Permit Entire · 11/22/2022
Generation Next FertilityMedical / HealthcareFloor 11
Project M00305933 Alteration · LOC Issued · 02/03/2020
Project M00305938 Alteration · LOC Issued · 02/03/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,617 on file (BIS + DOB NOW)
▸Plans & Drawings113
▸DOB NOWPlans/Sketch89
09/06/2026M00097167-I1Request digital key ↗
09/03/2026M00542858-I1Request digital key ↗
09/03/2026M00542833-I1Request digital key ↗
Showing 3 of 89 on file for this type
▸DOB NOWPlans/Sketch - Plumbing18
09/05/2026M00206478-P1Request digital key ↗
09/05/2026M00206478-P2Request digital key ↗
09/05/2026M00223888-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00305938-I1Request digital key ↗
09/04/2026M00419518-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00305927-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00397704-I1Request digital key ↗
▸Applications & Permits631
▸BISWORK PERMIT APPLICATION325
12/23/2021123819984Open ↗
08/26/2021140948250Open ↗
03/03/2021123802224Open ↗
Showing 3 of 325 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION302
02/06/2024140910913Open ↗
09/08/2023120598763Open ↗
08/04/2023123189290Open ↗
Showing 3 of 302 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications891
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION388
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 388 on file for this type
▸DOB NOWProgress Inspector Seal & Signature137
09/25/2026M00828592-I1Open ↗
09/12/2026M00575086-I1Open ↗
09/12/2026M00575086-I1Open ↗
Showing 3 of 137 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature113
09/06/2026M00097167-I1Open ↗
09/05/2026M00206478-I1Open ↗
09/05/2026M00206478-P1Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature86
10/07/2026M00690656-P2Open ↗
10/07/2026M00690656-P2Open ↗
10/07/2026M00690656-P2Open ↗
Showing 3 of 86 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 71 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT28
09/02/2020140948250Open ↗
Showing 1 of 28 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
06/30/2020140910913Open ↗
Showing 1 of 7 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/02/2020140948250Open ↗
06/30/2020140910913Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/02/2020140948250Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment255
▸BISSELF-CERT PLUMBING NOTICE87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISSCHEDULE B - PLUMBING55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISEQUIPMENT USE PERMITS11
08/04/2023123189290Open ↗
08/04/2023123189290Open ↗
07/28/2023123189290Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
08/04/2023123189290Open ↗
07/28/2023123189290Open ↗
09/17/2020123844073Open ↗
Showing 3 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLUMBING (PL) SIGNOFF3
06/15/2021123572455Open ↗
06/11/2021140862216Open ↗
05/18/2021123767986Open ↗
▸Safety & Tenant Protection66
▸BISTenant Protection Plan and Notes41
07/09/2020140910913Open ↗
09/02/2020140948250Open ↗
Showing 2 of 41 on file for this type
▸DOB NOWTenant Protection Plan20
09/05/2026M00206478-P1Open ↗
09/05/2026M00206478-P2Open ↗
09/04/2026M00238444-I1Open ↗
Showing 3 of 20 on file for this type
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos269
▸BISASBESTOS: CERTIFICATION (DEP ACP5)95
09/02/2020140948250Open ↗
Showing 1 of 95 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report81
09/05/2026M00305938-I1Open ↗
09/05/2026M00305927-I1Open ↗
09/04/2026M00419518-I1Open ↗
Showing 3 of 81 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form15
09/05/2026M00204132-I1Open ↗
09/04/2026M00238444-I1Open ↗
09/03/2026M00542833-I1Open ↗
Showing 3 of 15 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)6
08/07/2020140896939Open ↗
06/30/2020140910913Open ↗
Showing 2 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance299
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS158
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 158 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS67
01/03/2023123681444Open ↗
10/05/2020123824291Open ↗
06/24/2020122193606Open ↗
Showing 3 of 67 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY30
03/14/2025121681929Open ↗
01/03/2023123681444Open ↗
03/11/2022123802224Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)11
02/26/2024140910913Open ↗
07/28/2023123189290Open ↗
03/11/2022123802224Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.9
09/03/2026M00575086-I1Open ↗
09/03/2026M00647839-I1Open ↗
09/02/2026M00680288-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
09/02/2020140948250Open ↗
06/30/2020140910913Open ↗
Showing 2 of 5 on file for this type
▸BISLIGHTING IN DWELLING UNITS4
02/26/2024140910913Open ↗
07/26/2023123189290Open ↗
02/02/2022123787697Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports56
▸BISTECHNICAL REPORT: RESPONSIBILITY45
03/14/2025121681929Open ↗
02/28/2024140910913Open ↗
02/28/2024140910913Open ↗
Showing 3 of 45 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION4
02/28/2024140910913Open ↗
07/26/2023123189290Open ↗
02/02/2022123787697Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
02/26/2024140910913Open ↗
07/26/2023123189290Open ↗
01/03/2022123744939Open ↗
Showing 3 of 4 on file for this type
▸BISPOST-INSTALLED ANCHORS3
02/26/2024140910913Open ↗
07/26/2023123189290Open ↗
01/03/2022123744939Open ↗
▸Approvals, Objections & Sign-offs317
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST156
02/29/2024140910913Open ↗
09/18/2023120598763Open ↗
08/03/2023123189290Open ↗
Showing 3 of 156 on file for this type
▸BISADMINISTRATIVE OBJECTIONS70
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 70 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION47
12/23/2021123819984Open ↗
09/17/2020123844073Open ↗
07/31/2020140896939Open ↗
Showing 3 of 47 on file for this type
▸BISSUPERSEDING LETTER18
03/03/2021123802224Open ↗
Showing 1 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISFINAL6
02/27/2024140910913Open ↗
09/15/2023120598763Open ↗
07/26/2023123189290Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership294
▸BISCOST AFFIDAVIT277
01/03/2023123681444Open ↗
06/17/2021123572455Open ↗
06/15/2021123572455Open ↗
Showing 3 of 277 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW310
02/26/2024140910913Open ↗
09/11/2023120598763Open ↗
07/28/2023123189290Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Filing & Intake Forms334
▸BISEFILING COVER SHEET154
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 154 on file for this type
▸BISADDITIONAL INFORMATION117
07/26/2022123681444Open ↗
07/26/2022123681444Open ↗
04/20/2021123572455Open ↗
Showing 3 of 117 on file for this type
▸BISBOROUGH INTAKE FORM53
12/23/2021123819984Open ↗
Showing 1 of 53 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
09/02/2020140948250Open ↗
06/30/2020140910913Open ↗
Showing 2 of 10 on file for this type
▸Other Documents41
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWApproved Plans with no change in layout3
09/05/2026M00206478-P1Open ↗
09/05/2026M00206478-P2Open ↗
Showing 2 of 3 on file for this type