| Owner | Filings | Most Recent |
|---|---|---|
| SL Green Realty | 1,395 | 10/20/2026 |
| Reckson Associates Realty | 163 | 03/21/2026 |
| 1185 Ave of Americas Associates | 31 | 03/21/2026 |
| 1185 Sixth | 28 | 03/21/2026 |
| W&M Properties | 25 | 03/21/2026 |
| 500-512 Seventh Ave | 15 | 03/21/2026 |
| Sichenzia Ross Ference | 7 | 03/22/2026 |
| W&M Properties, Inc Agent | 6 | 03/21/2026 |
| 1185 Sixth LLC Newmark | 5 | 03/21/2026 |
| 1185 6th Ave Associates | 3 | 03/21/2026 |
| 1700 Broadway Co | 2 | 03/21/2026 |
| 1185 Company | 2 | 03/21/2026 |
| M D Sass Investors Services | 2 | 03/21/2026 |
| 1185 Avenu | 2 | 03/21/2026 |
| 1185 6th L | 2 | 03/21/2026 |
| 1185 Compa | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 141 | 03/21/2026 |
| K M DOB Consulting | 6 | 03/21/2026 |
| Rizzo Group | 37 | 03/21/2026 |
| Metropolis Group | 22 | 03/21/2026 |
| Louis Striar | 8 | 03/21/2026 |
| EA Design Group | 2 | 03/21/2026 |
| Smep Design & Consultation | 4 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Kazam Consultants | 6 | 03/21/2026 |
| Milrose Consultants | 4 | 03/21/2026 |
| Construction Permit Services | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Acc Construction | General Contractor | 39 | 10/04/2026 |
| Finaly General Contracting | General Contractor | 26 | 10/20/2026 |
| Supreme Construction & Maintenance Co | General Contractor | 17 | 07/08/2026 |
| Clune Construction Co | General Contractor | 16 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 14 | 09/12/2026 |
| Schimenti Construction Co | General Contractor | 9 | 07/08/2026 |
| PSI Partners | Fire Protection | 8 | 07/08/2026 |
| Concept Construction Service | General Contractor | 8 | 07/08/2026 |
| Versatile Services | General Contractor | 7 | 07/08/2026 |
| A&A Plumbing | Plumbing | 7 | 08/26/2026 |
| Americon Construction | General Contractor | 7 | 07/08/2026 |
| JGM Construction Development | General Contractor | 6 | 03/21/2026 |
| JRM Construction Management | General Contractor | 5 | 07/08/2026 |
| Expert Fire Sprinkler | Fire Protection | 5 | 07/08/2026 |
| Dependable Mechanical | Fire Protection | 5 | 07/08/2026 |
| DPH Plumbing & Heating | Plumbing | 5 | 07/08/2026 |
| Constructomics | General Contractor | 5 | 07/08/2026 |
| Safepipe Plumbing | Plumbing | 4 | 07/08/2026 |
| Balaton Consulting | Sign hanger | 3 | 07/08/2026 |
| Structural Preserv System | General Contractor | 3 | 07/03/2026 |
| Structure Tone | General Contractor | 3 | 10/14/2026 |
| Bedrock Plumbing & Heating | Plumbing | 3 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 3 | 07/09/2026 |
| Mac Felder | Plumbing | 3 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 3 | 07/08/2026 |
| Metrotech Mechanical | Plumbing | 3 | 07/08/2026 |
| JT Magen & Company | General Contractor | 2 | 09/01/2026 |
| A&H Express Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Polo Electric Corp D/B/A | Electrical | 2 | 03/21/2026 |
| Bedrock Mechanical | Fire Protection | 2 | 07/08/2026 |
| Cma Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| Donato Plumbing | Plumbing | 2 | 07/08/2026 |
| DGC Capital Contracting | General Contractor | 2 | 07/08/2026 |
| DG NY Contractors | General Contractor | 2 | 04/09/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 2 | 03/21/2026 |
| KG Sprinkler | Fire Protection | 2 | 07/08/2026 |
| L & M Mechanical NY | Plumbing | 2 | 07/08/2026 |
| Elysium Construction | General Contractor | 2 | 03/21/2026 |
| Evos | General Contractor | 2 | 04/09/2026 |
| Ferran Contracting | General Contractor | 2 | 07/08/2026 |
| J.A. Lee Electric | specialty_contractor | 2 | 03/21/2026 |
| Aggressive Fire Protection | Fire Protection | 2 | 07/08/2026 |
| SKH Mechanical | Fire Protection | 2 | 07/08/2026 |
| Universal Fire Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Amsterdam Electric | Electrical | 2 | 03/22/2026 |
| Five Town Neon Sign Co | Sign hanger | 2 | 07/08/2026 |
| Signstar NYC | Sign hanger | 2 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Blade Contracting | General Contractor | 2 | 03/21/2026 |
| Waterfire | Plumbing | 1 | 07/08/2026 |
| Arbor Electric Services | Electrical | 1 | 03/22/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/21/2026 |
| City Electrical Sign Erectors | Electrical | 1 | 03/22/2026 |
| Denali Electric | Electrical | 1 | 03/22/2026 |
| M.C. Electrical NY | Electrical | 1 | 03/21/2026 |
| Lmec Electric | Electrical | 1 | 03/22/2026 |
| Matros Automated Electrical | Electrical | 1 | 03/22/2026 |
| Star-Delta Electric | Electrical | 1 | 03/21/2026 |
| R & L Systems | Electrical | 1 | 03/21/2026 |
| Archstone Builders | General Contractor | 1 | 07/08/2026 |
| Concept Air Conditioning | specialty_contractor | 1 | 07/08/2026 |
| DKT Contractors | General Contractor | 1 | 04/10/2026 |
| LYNX Air Conditioning Services | General Contractor | 1 | 07/08/2026 |
| Mostotech Services | General Contractor | 1 | 07/08/2026 |
| Unispace of Boston | General Contractor | 1 | 07/08/2026 |
| Addison Plumbing and Heating | Plumbing | 1 | 06/28/2026 |
| Anesis Services | Fire Protection | 1 | 07/08/2026 |
| Aura Plumbing | Plumbing | 1 | 07/08/2026 |
| Copper Plumbing | Plumbing | 1 | 07/08/2026 |
| Courtesy Plumbing | Plumbing | 1 | 07/08/2026 |
| Five Borough NYC | Fire Protection | 1 | 08/26/2026 |
| George Breslaw Plumbing | Plumbing | 1 | 07/08/2026 |
| Hydrokinetic Plumbing & Heating I | Plumbing | 1 | 07/08/2026 |
| Mackler Master Fire | Fire Protection | 1 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 1 | 07/08/2026 |
| M & S Buildings Services | Fire Protection | 1 | 07/08/2026 |
| NY Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Parkview P&H | Plumbing | 1 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 1 | 07/04/2026 |
| RRP Plumbing | Fire Protection | 1 | 07/08/2026 |
| RRP Plumbing | Plumbing | 1 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Premier Electric | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Alan Margolin & Associates | 423 | 109 | 10/05/2026 |
| Codegreen | 510 | 11 | 08/10/2026 |
| Socotec Engineering | 4983 | 3 | 08/10/2026 |
| MEP Inspections | 1102 | 14 | 06/01/2026 |
| LCW Engineering | 1103 | 2 | 04/02/2026 |
| AK Engineering | 678 | 15 | 03/27/2026 |
| CNY Engineering | 3304 | 2 | 02/03/2026 |
| Metric Consulting and Ins | 1803 | 3 | 08/06/2025 |
| PSI Agency | 254 | 3 | 05/25/2022 |
| Project Tactical Solution | 5859 | 4 | 05/25/2021 |
| Engineering Building Service | 7303 | 3 | 03/08/2021 |
| Sag Engineering & Consulting | 608 | 2 | 10/11/2019 |
| Scherer Design Group | 6303 | 1 | 10/02/2018 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Finaly General Contracting | 10/19/2026 |
| DOB NOW | Structural | Permit Issued | Structure Tone | 10/13/2026 |
| DOB NOW | Structural | Permit Issued | Finaly General Contracting | 10/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 08/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 08/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | Five Borough NYC | 08/25/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 07/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | Capitol Fire Sprinkler Co | 07/07/2026 |
| DOB NOW | Plumbing | Permit Issued | Safepipe Plumbing | 07/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Finaly General Contracting | 07/02/2026 |
| DOB NOW | General Construction | Permit Issued | Finaly General Contracting | 07/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | Structural Preserv System | 07/01/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 07/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 07/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Acc Construction | 06/29/2026 |
| DOB NOW | General Construction | Permit Issued | Acc Construction | 06/29/2026 |
| DOB NOW | Plumbing | Permit Issued | Courtesy Plumbing | 06/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LYNX Air Conditioning Services | 05/27/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 05/27/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 05/07/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 05/07/2026 |
| DOB NOW | Sprinklers | Signed-off | PSI Partners | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | Finaly General Contracting | 04/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Finaly General Contracting | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 04/08/2026 |
| DOB NOW | Plumbing | Permit Issued | Bedrock Plumbing & Heating | 04/08/2026 |
| DOB NOW | General Construction | Permit Issued | DKT Contractors | 04/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 04/07/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 04/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 04/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | Finaly General Contracting | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Finaly General Contracting | 04/01/2026 |
| DOB NOW | Plumbing | Permit Issued | RRP Plumbing | 03/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DG NY Contractors | 03/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ralph W. Landolfi JR | 03/30/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/10/2026 | Permit Issued | JT Magen & Company | Air Conditioning Systems | Cooling |
| 04/02/2026 | Permit Issued | LYNX Air Conditioning Services | Air Conditioning Systems | Cooling Sigma SIG-SDSH036D.1 40,400 BTU · Wshp ×1 |
| 03/27/2026 | Permit Issued | Finaly General Contracting | Air Conditioning Systems | Cooling |
| 03/27/2026 | Permit Issued | Structure Tone | Air Conditioning Systems | Cooling Florida Heat Pump CL036 36,000 BTU · Wshp ×2 Compu-Aire HKW-3 37,700 BTU · Crac Unit ×1 |
| 03/26/2026 | Permit Issued | Acc Construction | Air Conditioning Systems | Cooling |
| 03/25/2026 | Permit Issued | Finaly General Contracting | Air Conditioning Systems | Cooling Florida Heat Pump CL024 24,000 BTU · Wshp ×2 Compu-Aire CKW-3 39,300 BTU · Crac Unit ×1 |
| 03/24/2026 | Permit Issued | DG NY Contractors | Heating and Air Conditioning Systems | Heat / Cool |
| 02/25/2026 | Permit Issued | Supreme Construction & Maintenance Co | Air Conditioning Systems | Heating Poweredaire CED-2-84E 85,000 BTU · Air Curtain ×3 |
| 02/03/2026 | — | — | Air Conditioning Systems | Cooling Florida Heat Pump RL048-1VTC-LLTPDA-XAG 54,000 BTU · Wshp ×4 |
| 11/21/2025 | Permit Issued | Finaly General Contracting | Air Conditioning Systems | — |
| 03/20/2022 | Signed-off | Concept Construction Service | Associated Ducts and Piping | — |
| 12/13/2019 | Signed-off | Concept Air Conditioning | Others | Other Mitsubishi Electric PUHY-P360YSLMU-A 504,440 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | — | — | — |
| 08/07/2026 | — | — | 281 heads |
| 07/20/2026 | Permit Issued | Five Borough NYC | 249 heads |
| 07/02/2026 | Signed-off | Cma Plumbing & Heating | 238 heads |
| 06/26/2026 | Permit Issued | A&H Express Plumbing & Heating | 254 heads |
| 06/17/2026 | Signed-off | PSI Partners | 383 heads |
| 06/01/2026 | Signed-off | Par Fire Protection | 953 heads |
| 05/29/2026 | Signed-off | PSI Partners | 487 heads |
| 03/26/2026 | Permit Issued | A&H Express Plumbing & Heating | 148 heads |
| 03/24/2026 | Permit Issued | A&H Express Plumbing & Heating | 107 heads |
| 03/24/2026 | Permit Issued | RRP Plumbing | 195 heads |
| 03/09/2026 | Permit Issued | Bedrock Mechanical | 896 heads |
| 02/19/2026 | Signed-off | Cma Plumbing & Heating | 364 heads |
| 02/05/2026 | Signed-off | Abco-Peerless Sprinkler | 37 heads |
| 11/19/2025 | Permit Issued | PSI Partners | 7 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | — | — | Water/Sanitary |
| 10/05/2026 | — | — | — |
| 08/07/2026 | — | — | — |
| 08/07/2026 | — | — | Water/Sanitary |
| 07/20/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 06/01/2026 | — | — | — |
| 04/02/2026 | Permit Issued | Courtesy Plumbing | Water/Sanitary |
| 03/26/2026 | — | — | — |
| 03/26/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/25/2026 | Permit Issued | RRP Plumbing | Water/Sanitary |
| 03/24/2026 | — | — | — |
| 03/24/2026 | — | — | — |
| 03/24/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/11/2026 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 03/05/2026 | Permit Issued | Bedrock Plumbing & Heating | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Permit Issued | Lmec Electric | General Wiring, Lighting |
| 07/14/2026 | Permit Issued | Titan Electrical & Elev Contracting | General Wiring |
| 07/01/2026 | Permit Issued | Amsterdam Electric | General Wiring |
| 05/07/2026 | Permit Issued | Titan Electrical & Elev Contracting | General Wiring |
| 04/14/2026 | Permit Issued | Big Ant Electric | General Wiring, Lighting |
| 04/08/2026 | Permit Issued | Cloonagh Electrical | — |
| 04/02/2026 | Permit Issued | MRD Electrical Services | General Wiring |
| 03/27/2026 | Permit Issued | Metropolis Electric | General Wiring |
| 01/02/2026 | Permit Issued | T & R Alarm and Electrical | — |
| 12/15/2025 | Permit Issued | MRD Electrical Services | General Wiring |
| 12/12/2025 | Complete | Amsterdam Electric | General Wiring |
| 11/19/2025 | Complete | Proff Electrical | General Wiring |
| 11/19/2025 | Complete | Proff Electrical | — |
| 11/19/2025 | Complete | Proff Electrical | General Wiring |
| 11/19/2025 | Complete | Proff Electrical | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2026 | Permit Issued | Structure Tone | Steel |
| 09/03/2026 | Permit Issued | Finaly General Contracting | Steel |
| 03/03/2026 | Permit Issued | Concept Construction Service | Masonry |
| 01/12/2026 | Permit Issued | Finaly General Contracting | Steel, Concrete |
| 08/06/2025 | Signed-off | JRM Construction Management | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/10/2026 | Permit Issued | Structural Preservation System | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/21/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/17/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/26/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 06/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/25/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/19/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 06/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/21/2026 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 04/21/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/21/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/28/2026 | Structural Steel - Details | Young Suh | special |
| 08/28/2026 | Structural Steel - High Strength Bolting | Young Suh | special |
| 08/28/2026 | Structural Steel - Welding | Young Suh | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 08/20/2026 | Post-installed Anchors | Young Suh | special |
| 08/14/2026 | Structural Steel - High Strength Bolting | Young Suh | special |
| 08/14/2026 | Structural Steel - Welding | Young Suh | special |
| 08/10/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 08/10/2026 | Ventilation and air distribution system | James Sullivan Jr | energy_progress |
| 08/10/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 08/10/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| 08/07/2026 | Final | Young Suh | progress |
| 08/06/2026 | Alternative Materials - OTCR Buildings Bulletin Number | ALEXIS SCHLESSINGERMAN | special |
| 08/06/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/13/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 07/13/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 07/13/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 06/29/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/29/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/22/2026 | Mechanical Systems | James Sullivan Jr | special |
| 06/22/2026 | Final | James Sullivan Jr | progress |
| 06/22/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 06/18/2026 | Post-installed Anchors | Young Suh | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| OneMain | Office | Floor 35 | Project M01420421 Project M01420409 Project M01420440 Project M01420451 |
| Moroccanoil | Office | Floors 32, 33 | Project M01371460 Project M01351214 Project M01371457 Project M01371462 Project M01371466 Project M01351439 Project M01351446 Project M01351202 |
| Industrial and Commercial Bank of China | Office | Floors 14, 15, 17 | Project M01331936 Project M01331729 Project M01331960 Project M01294085 Project M01294087 Project M01294088 Project M00996533 Project M00996542 Project M00996550 |
| Hana Bank New York Agency | Office | Floor 7 | Project M01335288 Project M01336433 |
| Joe and the Juice | Restaurant / Food Service | Floor 1 | Project M01311288 Project M01311289 Project M01297098 Project M01212143 Project M01216060 Project M01212121 |
| Carnegie Diner | Restaurant / Food Service | Cellar, Floors 1, 2, 5, Mezzanine | Project M01066755 Project M01229334 Project M01229335 Project M01021654 Project M01106511 Project M01070458 Project M01066743 Project M00998337 Project M00998376 |
| Lockton | Office | Floors 19–21 | Project M01243483 Project M01243573 Project M01243577 Project M01243586 Project M01243597 Project M01224092 Project M01224132 Project M01224201 Project M01223754 Project M00688519 Project M00688575 Project M00688611 |
| Hartree Partners | Office | Floors 9, 24, 25 | Project M01178743 Project M01178758 Project M01178788 Project M01178796 Project M01211795 Project M00759333 Project M00759363 Project M00759296 Project M00331978 Project M00331986 Project M00331988 Project M00549476 |
| Markel | Office | Floor 8 | Project M00870330 |
| Arentfox$chiff | Office | Floors 30, 31 | Project M00820539 |
| Laura Pels Theatre | Arts / Culture / Entertainment | Sub-cellar, Cellar, Floors 1, 3, 4, Mezzanine, Roof | Project M00647586 Project M00570754 |
| All Well Greens | Base Building / Common Areas | Floor 19 | Project M00374654 Project M00374665 Project M00374669 |
| Schiff Hardin | Office | Floors 30, 31 | Project M00237489 Project M00237525 |
| Verizon | Telecom site | Floor 28, Roof | Project M00025542 |