Stevens Tower
1185 AVENUE OF THE AMERICAS · BIN 1083717
💬 Discuss this project
1970Year Built
42Stories
O4Building Class
C6-6Zoning
1,047,390 sfGross Floor Area
50Units
LL97 Covered12 Active Violations 9 unresolved · 3 paperwork only ▸FISP: UNSAFE
Office, 20+ stories, with or without commercial · Owner of record: SL Green Realty · 42,049 sf lot · 24.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLaura Pels Theatre, VerizonUnder Construction27p · 6 filings · 20 docs
BulkheadVerizon1p · 1 filing · 3 docs
Floor 42Sl Green Realty CORPUnder Construction7p · 2 filings · 20 docs
Floor 41
Floor 40
Floor 39
Floor 38Structural steel for movable partitionUnder Construction2p · 1 filing · 5 docs
Floor 37Sl Green Realty CORPUnder Construction13p · 10 filings · 20 docs
Floor 36Slgreen Realty CorpUnder Construction2p · 1 filing · 3 docs
Floor 35OneMainUnder Construction13p · 9 filings · 20 docs
Floor 34Sl Green Realty CORPUnder Construction39p · 8 filings · 20 docs
Floor 33MoroccanoilUnder Construction41p · 9 filings · 20 docs
Floor 32MoroccanoilUnder Construction45p · 10 filings · 20 docs
Floor 31Arentfox$chiff, Schiff HardinUnder Construction41p · 11 filings · 20 docs
Floor 30Arentfox$chiff, Schiff HardinUnder Construction38p · 7 filings · 20 docs
Floor 29
Floor 28Verizon2p · 1 filing · 3 docs
Floor 27Sl Green Realty CORP48p · 7 filings · 20 docs
Floor 26Sl Green Realty CORPUnder Construction39p · 10 filings · 20 docs
Floor 25Hartree Partners101p · 12 filings · 20 docs
Floor 24Hartree Partners98p · 9 filings · 20 docs
Floor 23Sl Green Realty CORP.48p · 8 filings · 20 docs
Floor 22Sl Green Realty CORP.31p · 5 filings · 19 docs
Floor 21LocktonUnder Construction60p · 10 filings · 20 docs
Floor 20LocktonUnder Construction51p · 8 filings · 20 docs
Floor 19Lockton, All Well GreensUnder Construction62p · 14 filings · 20 docs
Floor 18
Floor 17Industrial and Commercial Bank of ChinaUnder Construction33p · 8 filings · 20 docs
Floor 16
Floor 15Industrial and Commercial Bank of China71p · 9 filings · 20 docs
Floor 14Industrial and Commercial Bank of ChinaUnder Construction61p · 8 filings · 20 docs
Floor 1313th floor demolition1p · 1 filing · 3 docs
Floor 12Sl Green Realty CORP54p · 4 filings · 20 docs
Floor 11
Floor 10Slab infill and structural steel supports for partitionUnder Construction1 filing · 4 docs
Floor 9Hartree PartnersUnder Construction84p · 16 filings · 20 docs
Floor 8Markel5p · 1 filing · 4 docs
Floor 7Hana Bank New York AgencyUnder Construction53p · 11 filings · 20 docs
Floor 6
Floor 5Carnegie Diner18p · 6 filings · 20 docs
Floor 4Laura Pels Theatre22p · 1 filing · 7 docs
Floor 3Laura Pels Theatre43p · 3 filings · 20 docs
Floor 2Carnegie Diner3p · 1 filing · 3 docs
Floor 1Joe and the Juice, Carnegie Diner +1Under Construction127p · 21 filings · 20 docs
MezzanineCarnegie Diner, Laura Pels TheatreUnder Construction56p · 8 filings · 20 docs
CellarCarnegie Diner, Laura Pels TheatreUnder Construction112p · 19 filings · 20 docs
Sub-CellarLaura Pels Theatre, Verizon54p · 7 filings · 20 docs
BasementSl Green Realty CORP3p · 2 filings · 6 docs
Sub-BasementSl Green Realty1p · 1 filing · 7 docs
Site & exteriorJoe and the Juice, Carnegie DinerUnder Construction33p · 12 filings · 20 docs
Filed — no permit issuedTemporary chain link fence and sidewalk shed3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL Green Realty1,39510/20/2026
Reckson Associates Realty16303/21/2026
1185 Ave of Americas Associates3103/21/2026
1185 Sixth2803/21/2026
W&M Properties2503/21/2026
500-512 Seventh Ave1503/21/2026
Sichenzia Ross Ference703/22/2026
W&M Properties, Inc Agent603/21/2026
1185 Sixth LLC Newmark503/21/2026
1185 6th Ave Associates303/21/2026
1700 Broadway Co203/21/2026
1185 Company203/21/2026
M D Sass Investors Services203/21/2026
1185 Avenu203/21/2026
1185 6th L203/21/2026
1185 Compa103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen14103/21/2026
K M DOB Consulting603/21/2026
Rizzo Group3703/21/2026
Metropolis Group2203/21/2026
Louis Striar803/21/2026
EA Design Group203/21/2026
Smep Design & Consultation403/21/2026
United Safety Consultants103/21/2026
AE Design Solution403/21/2026
Kazam Consultants603/21/2026
Milrose Consultants403/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Acc ConstructionGeneral Contractor3910/04/2026
Finaly General ContractingGeneral Contractor2610/20/2026
Supreme Construction & Maintenance CoGeneral Contractor1707/08/2026
Clune Construction CoGeneral Contractor1607/08/2026
Spring ScaffoldingScaffold1409/12/2026
Schimenti Construction CoGeneral Contractor907/08/2026
PSI PartnersFire Protection807/08/2026
Concept Construction ServiceGeneral Contractor807/08/2026
Versatile ServicesGeneral Contractor707/08/2026
A&A PlumbingPlumbing708/26/2026
Americon ConstructionGeneral Contractor707/08/2026
JGM Construction DevelopmentGeneral Contractor603/21/2026
JRM Construction ManagementGeneral Contractor507/08/2026
Expert Fire SprinklerFire Protection507/08/2026
Dependable MechanicalFire Protection507/08/2026
DPH Plumbing & HeatingPlumbing507/08/2026
ConstructomicsGeneral Contractor507/08/2026
Safepipe PlumbingPlumbing407/08/2026
Balaton ConsultingSign hanger307/08/2026
Structural Preserv SystemGeneral Contractor307/03/2026
Structure ToneGeneral Contractor310/14/2026
Bedrock Plumbing & HeatingPlumbing307/08/2026
Capitol Fire Sprinkler CoFire Protection307/09/2026
Mac FelderPlumbing307/08/2026
Ashlar MechanicalFire Protection307/08/2026
Metrotech MechanicalPlumbing307/08/2026
JT Magen & CompanyGeneral Contractor209/01/2026
A&H Express Plumbing & HeatingPlumbing207/08/2026
Polo Electric Corp D/B/AElectrical203/21/2026
Bedrock MechanicalFire Protection207/08/2026
Cma Plumbing & HeatingFire Protection207/08/2026
Donato PlumbingPlumbing207/08/2026
DGC Capital ContractingGeneral Contractor207/08/2026
DG NY ContractorsGeneral Contractor204/09/2026
Par Plumbing Co., Inc.oFire Protection203/21/2026
KG SprinklerFire Protection207/08/2026
L & M Mechanical NYPlumbing207/08/2026
Elysium ConstructionGeneral Contractor203/21/2026
EvosGeneral Contractor204/09/2026
Ferran ContractingGeneral Contractor207/08/2026
J.A. Lee Electricspecialty_contractor203/21/2026
Aggressive Fire ProtectionFire Protection207/08/2026
SKH MechanicalFire Protection207/08/2026
Universal Fire SprinklerFire Protection207/08/2026
Amsterdam ElectricElectrical203/22/2026
Five Town Neon Sign CoSign hanger207/08/2026
Signstar NYCSign hanger207/08/2026
Abco-Peerless SprinklerFire Protection207/08/2026
Blade ContractingGeneral Contractor203/21/2026
WaterfirePlumbing107/08/2026
Arbor Electric ServicesElectrical103/22/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
City Electrical Sign ErectorsElectrical103/22/2026
Denali ElectricElectrical103/22/2026
M.C. Electrical NYElectrical103/21/2026
Lmec ElectricElectrical103/22/2026
Matros Automated ElectricalElectrical103/22/2026
Star-Delta ElectricElectrical103/21/2026
R & L SystemsElectrical103/21/2026
Archstone BuildersGeneral Contractor107/08/2026
Concept Air Conditioningspecialty_contractor107/08/2026
DKT ContractorsGeneral Contractor104/10/2026
LYNX Air Conditioning ServicesGeneral Contractor107/08/2026
Mostotech ServicesGeneral Contractor107/08/2026
Unispace of BostonGeneral Contractor107/08/2026
Addison Plumbing and HeatingPlumbing106/28/2026
Anesis ServicesFire Protection107/08/2026
Aura PlumbingPlumbing107/08/2026
Copper PlumbingPlumbing107/08/2026
Courtesy PlumbingPlumbing107/08/2026
Five Borough NYCFire Protection108/26/2026
George Breslaw PlumbingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Mackler Master FireFire Protection107/08/2026
Mega PlumbingFire Protection107/08/2026
M & S Buildings ServicesFire Protection107/08/2026
NY Plumbing & HeatingPlumbing107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Parkview P&HPlumbing107/08/2026
Par Plumbing CoPlumbing107/04/2026
RRP PlumbingFire Protection107/08/2026
RRP PlumbingPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Premier ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates42310910/05/2026
Codegreen5101108/10/2026
Socotec Engineering4983308/10/2026
MEP Inspections11021406/01/2026
LCW Engineering1103204/02/2026
AK Engineering6781503/27/2026
CNY Engineering3304202/03/2026
Metric Consulting and Ins1803308/06/2025
PSI Agency254305/25/2022
Project Tactical Solution5859405/25/2021
Engineering Building Service7303303/08/2021
Sag Engineering & Consulting608210/11/2019
Scherer Design Group6303110/02/2018
Building Lifecycle
All (300)Filed (77)Permit Issued (80)Signed Off (33)Facade (FISP) (5)Violation (11)Inspection (60)Objection (4)Special Inspection (30)
10/19/2026
Permit issued — General Construction
M01403947-I1-GC
10/13/2026
Permit issued — Structural
M01442841-I1-ST
10/09/2026
Permit issued — Structural
M01403997-I1-ST
10/05/2026
Filed — Alteration
Modifications to the existing plumbing system (Retail Demo) as per plans. No change to use, egress or occupancy.
M01403959-I1
10/05/2026
Filed — Alteration
Modifications to the existing sprinkler system on the cellar and 1st floor (Retail Demo) as per plans. No change to use, egress or occupancy.
M01404711-I1
10/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/21/2026
Signed off — Alteration
Modifications to the existing sprinkler system with installation of a temporary loop on the 7th floor (Hana Bank & PreBuild) as per plans. No change to use, egress, or occupancy.
M01287702-I1
09/21/2026
Signed off — Alteration
Modifications to the existing plumbing system on the 7th floor (Hana Bank & PreBuild) as per plans. No change to use, egress or occupancy.
M01287688-I1
09/21/2026
Signed off — Alteration
M01287708-I1
09/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2026
Signed off — Alteration
Modifications and upgrade to the existing sprinkler system on the 21st floor (Lockton), as per plans. No change to use, egress, or occupancy.
M01224201-I1
09/10/2026
Permit issued — Sidewalk Shed
M01212078-I1-SH
09/08/2026
Filed — Alteration
Installation of structural steel supports for movable partition on the 37th and 38th floors as per plans. No change to use, egress or occupancy.
M01442841-I1
09/03/2026
Filed — Alteration
Slab infill on the 9th floor with installation of structural steel supports for movable partition on the 10th floor as per plans. No change to use, egress or occupancy.
M01403997-I1
09/02/2026
Signed off — Alteration
Modifications to the existing sprinkler system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
M01175589-I1
08/31/2026
Permit issued — Mechanical Systems
M01420421-I1-MS
08/31/2026
Permit issued — General Construction
M01420409-I1-GC
08/28/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
08/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
08/28/2026
Special inspection requirement — Structural Steel - Details
Young Suh
08/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01450821-I1
08/25/2026
Permit issued — Sprinklers
M01378353-I1-EW-SP
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2026
Signed off — Alteration CO
Installation of new plumbing fixtures and associated piping on the Cellar,1st, Mezz Floor as per plans. No change to use, egress or occupancy.
M01066743-S1
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/20/2026
Special inspection requirement — Post-installed Anchors
Young Suh
08/19/2026
Objection resolved — Resolved
08/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT 6TH AVE, WEST PLAZA 46TH ST, WEST PLAZA 47TH ST ELEVATIONS.
M01212078-P2
08/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/17/2026
Objection raised — Other
08/14/2026
Signed off — Alteration
Renovation of existing office space including interior partitions, doors, suspended ceilings on the 30th Floor as per plans. No change to use, egress, or occupancy.
M01293072-I1
08/14/2026
Signed off — Alteration
Modifications to the existing plumbing system on the 30th Floors as per plans. No change to use, egress or occupancy.
M01293108-I1
08/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
08/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
08/10/2026
Filed — Alteration
Modifications to the existing HVAC system on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy.
M01420421-I1
08/10/2026
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Dariusz Janczak
M01200211-P2
08/10/2026
Signed off — Alteration
Modifications to the existing HVAC system on the 22nd floor as per plans. No change to use, egress or occupancy.
M00693208-I1
08/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Sullivan Jr
08/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Sullivan Jr
08/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Sullivan Jr
08/10/2026
Special inspection requirement — Ventilation and air distribution system
James Sullivan Jr
08/07/2026
Filed — Alteration
Installation of new plumbing fixtures and associated piping on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy..
M01420440-I1
08/07/2026
Filed — Alteration
Installation of new partitions, doors, ceilings and finishes on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy.
M01420409-I1
08/07/2026
Filed — Alteration
Installation of a new sprinkler system on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy.
M01420451-I1
08/07/2026
Special inspection requirement — Final
Young Suh
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT 6TH AVE, WEST PLAZA 46TH ST, WEST PLAZA 47TH ST ELEVATIONS.
M01212078-P1
08/06/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/06/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ALEXIS SCHLESSINGERMAN
07/23/2026
Signed off — Alteration
Modifications to the existing sprinkler system on the 24th & 25th floors (Hartree Partners) as per plans. No change to use, egress or occupancy
M01178796-I1
07/23/2026
Permit issued — Plumbing
M01378349-I1-PL
07/22/2026
Permit issued — General Construction
M01378337-I1-GC
07/22/2026
Permit issued — Mechanical Systems
M01378341-I1-MS
07/22/2026
Violation issued (ECB, open)
Cranes and Derricks
07/22/2026
Violation issued (ECB, open)
Construction
07/22/2026
Violation issued (ECB, open)
Unknown
07/22/2026
Violation issued (ECB, open)
Construction
07/22/2026
Violation issued (ECB, open)
Unknown
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFinaly General Contracting10/19/2026
DOB NOWStructuralPermit IssuedStructure Tone10/13/2026
DOB NOWStructuralPermit IssuedFinaly General Contracting10/09/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding09/10/2026
DOB NOWGeneral ConstructionPermit IssuedJT Magen & Company08/31/2026
DOB NOWMechanical SystemsPermit IssuedJT Magen & Company08/31/2026
DOB NOWSprinklersPermit IssuedFive Borough NYC08/25/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing07/23/2026
DOB NOWMechanical SystemsPermit IssuedStructure Tone07/22/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone07/22/2026
DOB NOWSprinklersPermit IssuedCapitol Fire Sprinkler Co07/07/2026
DOB NOWPlumbingPermit IssuedSafepipe Plumbing07/06/2026
DOB NOWMechanical SystemsPermit IssuedFinaly General Contracting07/02/2026
DOB NOWGeneral ConstructionPermit IssuedFinaly General Contracting07/02/2026
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/01/2026
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System07/01/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing07/01/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical07/01/2026
DOB NOWMechanical SystemsPermit IssuedAcc Construction06/29/2026
DOB NOWGeneral ConstructionPermit IssuedAcc Construction06/29/2026
DOB NOWPlumbingPermit IssuedCourtesy Plumbing06/01/2026
DOB NOWMechanical SystemsPermit IssuedLYNX Air Conditioning Services05/27/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding05/27/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing05/07/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing05/07/2026
DOB NOWSprinklersSigned-offPSI Partners04/23/2026
DOB NOWGeneral ConstructionPermit IssuedFinaly General Contracting04/10/2026
DOB NOWMechanical SystemsPermit IssuedFinaly General Contracting04/09/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical04/08/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating04/08/2026
DOB NOWGeneral ConstructionPermit IssuedDKT Contractors04/08/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating04/07/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating04/07/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical04/07/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical04/07/2026
DOB NOWGeneral ConstructionPermit IssuedFinaly General Contracting04/01/2026
DOB NOWMechanical SystemsPermit IssuedFinaly General Contracting04/01/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing03/31/2026
DOB NOWMechanical SystemsPermit IssuedDG NY Contractors03/31/2026
DOB NOWSprinklersPermit IssuedRalph W. Landolfi JR03/30/2026
+ 60 more permits on file
12 projects · most recent 08/10/2026
Air Conditioning Systems Heating and Air Conditioning Systems Associated Ducts and Piping Others
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Permit IssuedJT Magen & CompanyAir Conditioning Systems
Cooling
Climatemaster SC-030 1,000 CFM · Wshp ×1
SY-024 800 CFM · Wshp ×1
04/02/2026Permit IssuedLYNX Air Conditioning ServicesAir Conditioning Systems
Cooling
Sigma SIG-SDSH036D.1 40,400 BTU · Wshp ×1
03/27/2026Permit IssuedFinaly General ContractingAir Conditioning Systems
Cooling
Bosch BOSCH CL060 2,000 CFM · Condensing Unit ×2
BOSCH CL024 800 CFM · Condensing Unit ×1
03/27/2026Permit IssuedStructure ToneAir Conditioning Systems
Cooling
Florida Heat Pump CL036 36,000 BTU · Wshp ×2
Compu-Aire HKW-3 37,700 BTU · Crac Unit ×1
03/26/2026Permit IssuedAcc ConstructionAir Conditioning Systems
Cooling
Florida Heat Pump CL012 11,200 BTU · Wshp ×2
CL018 19,700 BTU · Wshp ×1
CL030 31,100 BTU · Wshp ×1
03/25/2026Permit IssuedFinaly General ContractingAir Conditioning Systems
Cooling
Florida Heat Pump CL024 24,000 BTU · Wshp ×2
Compu-Aire CKW-3 39,300 BTU · Crac Unit ×1
03/24/2026Permit IssuedDG NY ContractorsHeating and Air Conditioning Systems
Heat / Cool
Florida Heat Pump Model #CL018 600 BTU · Wshp ×1
Model #CL060 1,990 BTU · Wshp ×1
02/25/2026Permit IssuedSupreme Construction & Maintenance CoAir Conditioning Systems
Cooling
Polartech Ploarteck ERWC-070-V8R 15,000 CFM ×1
Trane Trane SWUD50604 15,000 CFM · Wshp ×2
Heating
Poweredaire CED-2-84E 85,000 BTU · Air Curtain ×3
02/03/2026——Air Conditioning Systems
Cooling
Florida Heat Pump RL048-1VTC-LLTPDA-XAG 54,000 BTU · Wshp ×4
11/21/2025Permit IssuedFinaly General ContractingAir Conditioning Systems—
03/20/2022Signed-offConcept Construction ServiceAssociated Ducts and Piping—
12/13/2019Signed-offConcept Air ConditioningOthers
Other
Mitsubishi Electric PUHY-P360YSLMU-A 504,440 BTU · Vrf Outdoor ×1
19 projects · most recent 10/05/2026
FiledStatusContractorScope
10/05/2026———
08/07/2026——281 heads
07/20/2026Permit IssuedFive Borough NYC249 heads
07/02/2026Signed-offCma Plumbing & Heating238 heads
06/26/2026Permit IssuedA&H Express Plumbing & Heating254 heads
06/17/2026Signed-offPSI Partners383 heads
06/01/2026Signed-offPar Fire Protection953 heads
05/29/2026Signed-offPSI Partners487 heads
03/26/2026Permit IssuedA&H Express Plumbing & Heating148 heads
03/24/2026Permit IssuedA&H Express Plumbing & Heating107 heads
03/24/2026Permit IssuedRRP Plumbing195 heads
03/09/2026Permit IssuedBedrock Mechanical896 heads
02/19/2026Signed-offCma Plumbing & Heating364 heads
02/05/2026Signed-offAbco-Peerless Sprinkler37 heads
11/19/2025Permit IssuedPSI Partners7 heads
25 projects · most recent 10/05/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/05/2026——Water/Sanitary
10/05/2026———
08/07/2026———
08/07/2026——Water/Sanitary
07/20/2026Permit IssuedA&A PlumbingWater/Sanitary
06/01/2026———
04/02/2026Permit IssuedCourtesy PlumbingWater/Sanitary
03/26/2026———
03/26/2026Permit IssuedA&A PlumbingWater/Sanitary
03/25/2026Permit IssuedRRP PlumbingWater/Sanitary
03/24/2026———
03/24/2026———
03/24/2026Permit IssuedA&A PlumbingWater/Sanitary
03/11/2026Signed-offPar Plumbing CoWater/Sanitary
03/05/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
25 projects · most recent 09/25/2026
General Wiring Lighting
FiledStatusContractorScope
09/25/2026Permit IssuedLmec ElectricGeneral Wiring, Lighting
07/14/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
07/01/2026Permit IssuedAmsterdam ElectricGeneral Wiring
05/07/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
04/14/2026Permit IssuedBig Ant ElectricGeneral Wiring, Lighting
04/08/2026Permit IssuedCloonagh Electrical—
04/02/2026Permit IssuedMRD Electrical ServicesGeneral Wiring
03/27/2026Permit IssuedMetropolis ElectricGeneral Wiring
01/02/2026Permit IssuedT & R Alarm and Electrical—
12/15/2025Permit IssuedMRD Electrical ServicesGeneral Wiring
12/12/2025CompleteAmsterdam ElectricGeneral Wiring
11/19/2025CompleteProff ElectricalGeneral Wiring
11/19/2025CompleteProff Electrical—
11/19/2025CompleteProff ElectricalGeneral Wiring
11/19/2025CompleteProff Electrical—
5 projects · most recent 09/08/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/08/2026Permit IssuedStructure ToneSteel
09/03/2026Permit IssuedFinaly General ContractingSteel
03/03/2026Permit IssuedConcept Construction ServiceMasonry
01/12/2026Permit IssuedFinaly General ContractingSteel, Concrete
08/06/2025Signed-offJRM Construction ManagementSteel, Concrete
1 project · most recent 08/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/10/2026Permit IssuedStructural Preservation SystemSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 115
DateTypeResultReport
09/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/26/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/19/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/21/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 115.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/28/2026Structural Steel - DetailsYoung Suhspecial
08/28/2026Structural Steel - High Strength BoltingYoung Suhspecial
08/28/2026Structural Steel - WeldingYoung Suhspecial
08/20/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/20/2026Post-installed AnchorsYoung Suhspecial
08/14/2026Structural Steel - High Strength BoltingYoung Suhspecial
08/14/2026Structural Steel - WeldingYoung Suhspecial
08/10/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
08/10/2026Ventilation and air distribution systemJames Sullivan Jrenergy_progress
08/10/2026HVAC-R and service water heating equipmentJames Sullivan Jrenergy_progress
08/10/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
08/07/2026FinalYoung Suhprogress
08/06/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
08/06/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
07/13/2026Interior lighting powerJames Sullivan Jrenergy_progress
07/13/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
07/13/2026Lighting controlsJames Sullivan Jrenergy_progress
06/29/2026Post-installed AnchorsJames Sullivan Jrspecial
06/29/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/29/2026Post-installed AnchorsJames Sullivan Jrspecial
06/29/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/22/2026Mechanical SystemsJames Sullivan Jrspecial
06/22/2026FinalJames Sullivan Jrprogress
06/22/2026Sprinkler SystemsJames Sullivan Jrspecial
06/18/2026Post-installed AnchorsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
OneMainOfficeFloor 35
Project M01420421 Alteration · Permit Entire · 08/10/2026
Project M01420409 Alteration · Permit Entire · 08/07/2026
Project M01420440 Alteration · Approved · 08/07/2026
Project M01420451 Alteration · Approved · 08/07/2026
MoroccanoilOfficeFloors 32, 33
Project M01371460 Alteration · Permit Entire · 03/27/2026
Project M01351214 Alteration · Permit Entire · 03/26/2026
Project M01371457 Alteration · Permit Entire · 03/26/2026
Project M01371462 Alteration · Permit Entire · 03/26/2026
Project M01371466 Alteration · Permit Entire · 03/26/2026
Project M01351439 Alteration · Permit Entire · 03/24/2026
Project M01351446 Alteration · Permit Entire · 03/24/2026
Project M01351202 Alteration · Permit Entire · 03/20/2026
Industrial and Commercial Bank of ChinaOfficeFloors 14, 15, 17
Project M01331936 Alteration · Permit Entire · 03/25/2026
Project M01331729 Alteration · Permit Entire · 03/24/2026
Project M01331960 Alteration · Permit Entire · 03/24/2026
Project M01294085 Alteration · Permit Entire · 10/24/2025
Project M01294087 Alteration · Approved · 10/24/2025
Project M01294088 Alteration · Approved · 10/24/2025
Project M00996533 Alteration · LOC Issued · 03/04/2024
Project M00996542 Alteration · LOC Issued · 03/04/2024
Project M00996550 Alteration · LOC Issued · 03/04/2024
Hana Bank New York AgencyOfficeFloor 7
Project M01335288 Alteration · Approved · 01/15/2026
Project M01336433 Alteration · Approved · 01/15/2026
Joe and the JuiceRestaurant / Food ServiceFloor 1
Project M01311288 Alteration · LOC Issued · 11/18/2025
Project M01311289 Alteration · LOC Issued · 11/18/2025
Project M01297098 Alteration · LOC Issued · 10/15/2025
Project M01212143 Alteration · LOC Issued · 08/04/2025
Project M01216060 Alteration · LOC Issued · 08/04/2025
Project M01212121 Alteration · LOC Issued · 07/31/2025
Carnegie DinerRestaurant / Food ServiceCellar, Floors 1, 2, 5, Mezzanine
Project M01066755 No Work · Approved · 10/23/2025
Project M01229334 Alteration · LOC Issued · 06/04/2025
Project M01229335 Alteration · LOC Issued · 06/04/2025
Project M01021654 Alteration · LOC Issued · 09/12/2024
Project M01106511 Alteration · LOC Issued · 09/11/2024
Project M01070458 Alteration · LOC Issued · 07/14/2024
Project M01066743 Alteration CO · Permit Entire · 07/11/2024
Project M00998337 Alteration · LOC Issued · 02/05/2024
Project M00998376 Alteration · LOC Issued · 02/05/2024
LocktonOfficeFloors 19–21
Project M01243483 Alteration · Permit Entire · 10/21/2025
Project M01243573 Alteration · Permit Entire · 10/21/2025
Project M01243577 Alteration · Approved · 10/21/2025
Project M01243586 Alteration · Permit Entire · 10/21/2025
Project M01243597 Alteration · Permit Entire · 10/20/2025
Project M01224092 Alteration · Permit Entire · 07/10/2025
Project M01224132 Alteration · Permit Entire · 07/09/2025
Project M01224201 Alteration · LOC Issued · 07/09/2025
Project M01223754 Alteration · Permit Entire · 07/07/2025
Project M00688519 Alteration · LOC Issued · 03/16/2022
Project M00688575 Alteration · LOC Issued · 03/14/2022
Project M00688611 Alteration · LOC Issued · 03/14/2022
Hartree PartnersOfficeFloors 9, 24, 25
Project M01178743 Alteration · LOC Issued · 07/11/2025
Project M01178758 Alteration · LOC Issued · 07/11/2025
Project M01178788 Alteration · LOC Issued · 07/11/2025
Project M01178796 Alteration · LOC Issued · 07/11/2025
Project M01211795 Alteration · LOC Issued · 07/11/2025
Project M00759333 Alteration · LOC Issued · 07/05/2022
Project M00759363 Alteration · LOC Issued · 07/05/2022
Project M00759296 Alteration · LOC Issued · 06/30/2022
Project M00331978 Alteration · LOC Issued · 08/05/2021
Project M00331986 Alteration · LOC Issued · 08/05/2021
Project M00331988 Alteration · LOC Issued · 08/05/2021
Project M00549476 Alteration · LOC Issued · 08/05/2021
MarkelOfficeFloor 8
Project M00870330 Alteration · LOC Issued · 05/18/2023
Arentfox$chiffOfficeFloors 30, 31
Project M00820539 Alteration · LOC Issued · 02/13/2023
Laura Pels TheatreArts / Culture / EntertainmentSub-cellar, Cellar, Floors 1, 3, 4, Mezzanine, Roof
Project M00647586 Alteration · LOC Issued · 12/21/2021
Project M00570754 Alteration · LOC Issued · 08/20/2021
All Well GreensBase Building / Common AreasFloor 19
Project M00374654 Alteration · LOC Issued · 07/29/2020
Project M00374665 Alteration · LOC Issued · 07/29/2020
Project M00374669 Alteration · LOC Issued · 07/29/2020
Schiff HardinOfficeFloors 30, 31
Project M00237489 Alteration · LOC Issued · 10/11/2019
Project M00237525 Alteration · LOC Issued · 10/11/2019
VerizonTelecom siteFloor 28, Roof
Project M00025542 Alteration · LOC Issued · 10/02/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 4,852 on file (BIS + DOB NOW)
▸Plans & Drawings256
▸DOB NOWPlans/Sketch228
10/06/2026M01403959-I1Request digital key ↗
10/06/2026M01404711-I1Request digital key ↗
09/15/2026M01442841-I1Request digital key ↗
Showing 3 of 228 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
09/05/2026M00237489-I1Request digital key ↗
09/05/2026M00239173-I1Request digital key ↗
09/04/2026M00374654-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/05/2026M00237525-I1Request digital key ↗
09/04/2026M00364584-I1Request digital key ↗
09/04/2026M00374669-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
09/05/2026M00138982-I1Request digital key ↗
09/05/2026M00153808-I1Request digital key ↗
09/05/2026M00164571-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00364578-I1Request digital key ↗
09/04/2026M00374665-I1Request digital key ↗
09/03/2026M00331986-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/05/2026M00162698-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00449120-I1Request digital key ↗
09/04/2026M00464099-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00153013-I1Request digital key ↗
▸Applications & Permits723
▸BISPLAN / WORK APPROVAL APPLICATION386
11/07/2022123597465Open ↗
11/07/2022123406803Open ↗
04/16/2021123688571Open ↗
Showing 3 of 386 on file for this type
▸BISWORK PERMIT APPLICATION333
05/12/2022123571982Open ↗
05/04/2022123571982Open ↗
04/29/2022123571982Open ↗
Showing 3 of 333 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications1,540
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION607
11/09/2020140972794Open ↗
11/09/2020140972794Open ↗
Showing 2 of 607 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature255
10/14/2026M01403997-I1Open ↗
10/06/2026M01403959-I1Open ↗
10/06/2026M01404711-I1Open ↗
Showing 3 of 255 on file for this type
▸DOB NOWProgress Inspector Seal & Signature177
10/14/2026M01403997-I1Open ↗
10/05/2026M01351214-I1Open ↗
10/05/2026M01351214-I1Open ↗
Showing 3 of 177 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST149
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 149 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT138
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature126
10/14/2026M01403997-I1Open ↗
10/06/2026M01403959-I1Open ↗
10/06/2026M01404711-I1Open ↗
Showing 3 of 126 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM67
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 67 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
Showing 3 of 7 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment401
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE95
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 95 on file for this type
▸BISSELF-CERT PLUMBING NOTICE80
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 80 on file for this type
▸BISEQUIPMENT USE PERMITS67
11/06/2020123688580Open ↗
11/06/2020123688580Open ↗
11/06/2020123688580Open ↗
Showing 3 of 67 on file for this type
▸BISSCHEDULE B - PLUMBING62
04/16/2021123688571Open ↗
04/01/2021123688571Open ↗
11/18/2020123470751Open ↗
Showing 3 of 62 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA49
06/23/2023123404253Open ↗
09/20/2022123589143Open ↗
12/14/2020123422206Open ↗
Showing 3 of 49 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT35
11/06/2020123688580Open ↗
Showing 1 of 35 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8513
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos465
▸DOB NOWDEP ACP-5: Asbestos Assessment Report231
10/14/2026M01403997-I1Open ↗
10/06/2026M01403959-I1Open ↗
10/06/2026M01404711-I1Open ↗
Showing 3 of 231 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)136
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
Showing 3 of 136 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISASBESTOS INSPECTION REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance208
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS116
11/09/2020140972794Open ↗
11/09/2020140972794Open ↗
Showing 2 of 116 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS45
05/03/2021140972794Open ↗
12/14/2020123566186Open ↗
11/09/2020140931366Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
05/03/2021140972794Open ↗
12/14/2020123566186Open ↗
11/09/2020140931366Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.11
09/03/2026M00516066-I1Open ↗
09/03/2026M00577867-I1Open ↗
09/02/2026M00688575-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
10/26/2023123177622Open ↗
07/28/2022123597465Open ↗
07/28/2022123406803Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
10/26/2023123177622Open ↗
07/28/2022123597465Open ↗
07/28/2022123406803Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports55
▸BISTECHNICAL REPORT: RESPONSIBILITY37
07/28/2022123406803Open ↗
07/28/2022123406803Open ↗
09/28/2021121286198Open ↗
Showing 3 of 37 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISMECHANICAL SYSTEMS3
10/26/2023123177622Open ↗
07/28/2022123597465Open ↗
07/28/2022123406803Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs293
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST178
11/30/2022123589143Open ↗
11/09/2022123597465Open ↗
11/09/2022123406803Open ↗
Showing 3 of 178 on file for this type
▸BISADMINISTRATIVE OBJECTIONS87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
10/23/2023123177613Open ↗
07/28/2022123597465Open ↗
07/28/2022123406803Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership487
▸BISCOST AFFIDAVIT485
12/19/2022123406812Open ↗
11/30/2022123589143Open ↗
11/30/2022123406812Open ↗
Showing 3 of 485 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/28/2022123597465Open ↗
07/28/2022123406803Open ↗
▸Filing & Intake Forms373
▸BISEFILING COVER SHEET229
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 229 on file for this type
▸BISBOROUGH INTAKE FORM83
09/14/2020123688571Open ↗
09/09/2020123688571Open ↗
Showing 2 of 83 on file for this type
▸BISADDITIONAL INFORMATION48
04/16/2021123688571Open ↗
11/24/2020123470751Open ↗
Showing 2 of 48 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET13
10/30/2020140972794Open ↗
08/26/2020140943200Open ↗
07/28/2020140931366Open ↗
Showing 3 of 13 on file for this type
▸Other Documents34
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 41
09/05/2026M00162698-I1Open ↗
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 21
09/05/2026M00162698-I1Open ↗
▸DOB NOWAlternate Plan 11
09/05/2026M00162698-I1Open ↗