Hospital, sanitarium, mental institution
Guggenheim Pavilion
1190 FIFTH AVENUE · BIN 1083923
💬 Discuss this project
1963Year Built
14Stories
I1Building Class
R9Zoning
2,215,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized7 Active Violations 2 unresolved · 5 paperwork only 19 likely answered ▸FISP: SAFE
Hospital, sanitarium, mental institution · Owner of record: Mount Sinai Hospital · 279,985 sf lot · 7.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMount Sinai Health SystemUnder Construction1 filing
RoofMount Sinai Health SystemUnder Construction2p · 2 filings · 20 docs
Floor 24Mount Sinai Hospital2 filings · 10 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Mount Sinai Health SystemUnder Construction1p · 1 filing
Floor 11Mount Sinai Health SystemUnder Construction7p · 5 filings
Floor 10Mount Sinai Health System9p · 4 filings
Floor 9Mount Sinai Health System9p · 2 filings
Floor 8
Floor 7Mechanical system work2p · 2 filings · 17 docs
Floor 6Mount Sinai Health SystemUnder Construction4p · 4 filings · 20 docs
Floor 5Mount Sinai Health System, BurlingtonUnder Construction38p · 17 filings · 20 docs
Floor 4Mount Sinai Health SystemUnder Construction5p · 3 filings
Floor 3Mount Sinai Health System7p · 4 filings · 20 docs
Floor 2Mount Sinai Health SystemUnder Construction26p · 9 filings · 20 docs
Floor 1Mount Sinai Health System, Mount Sinai Hospital +1Under Construction31p · 15 filings · 20 docs
MezzanineStructural modifications, 2nd floor2p · 1 filing · 20 docs
CellarBurlington, Mount Sinai Health System +119p · 12 filings · 18 docs
BasementMount Sinai Health System, Burlington67p · 25 filings · 20 docs
Sub-BasementMount Sinai Health System, BurlingtonUnder Construction25 filings · 20 docs
Site & exteriorMount Sinai Health System5 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Hospital30507/08/2026
Mount Sinai School of Medicine2803/21/2026
Mount Sinai Health System1307/08/2026
Mount403/21/2026
Mount Sinai Helth Group203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants8203/21/2026
Gig Expediting2403/21/2026
A1 Expediting Service1003/21/2026
All in Permit Consultants103/21/2026
Simple Architecture403/21/2026
Metropolis Group1203/21/2026
Milrose Consultants203/21/2026
Sme Professional Design & Consultan203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hunter Roberts ConstructionGeneral Contractor6307/08/2026
Alliance PlumbingPlumbing2608/08/2026
Unity Construction ServicesGeneral Contractor2607/08/2026
Cardoza PlumbingPlumbing1807/08/2026
J & N RemodelingGeneral Contractor1507/08/2026
Consigli Construction CoGeneral Contractor1508/08/2026
Safway AtlanticScaffold1407/08/2026
Current Fire ProtectionFire Protection1107/08/2026
Sirina Fire ProtectionFire Protection1007/22/2026
Cauldwell Wingate CoGeneral Contractor807/08/2026
Aggressive Fire ProtectionFire Protection707/08/2026
PSI PlumbingPlumbing610/04/2026
Amf Mechanical Systems Cospecialty_contractor603/21/2026
Paul M MaintenanceGeneral Contractor407/08/2026
Med-Tek ContractingGeneral Contractor403/21/2026
Litespeed ElectricElectrical403/22/2026
Full Capacity FireFire Protection307/08/2026
PSI PartnersFire Protection307/08/2026
Rael Automatic Sprinkler CoFire Protection206/28/2026
Dooley Electric CoElectrical203/21/2026
Interboro Sign & Electrical MaintenanceSign hanger207/04/2026
NJS Electrical ServicesElectrical203/22/2026
King Rose of NYGeneral Contractor207/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
Diane ElectricElectrical103/22/2026
Difalzo Electric NYElectrical103/22/2026
Difazio Electric NYElectrical103/22/2026
E-J Electric Installation CoElectrical103/22/2026
Core Electric & CommunicationElectrical103/21/2026
Albin Gustafson CompanyElectrical103/21/2026
Eldor ElectricElectrical103/21/2026
Proff ElectricalElectrical103/22/2026
Scala, Jr., AnthonyElectrical103/21/2026
Rockmor Electric EnterprisesElectrical103/21/2026
AL Electrical GroupElectrical103/21/2026
Villafane JohnElectrical103/21/2026
Related ServicesScaffold107/08/2026
Absolute Special InsptnFire Protection107/08/2026
Integral Electrical PWR & CNTRElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4232509/28/2026
Outsource Special Inspection282712308/11/2026
Building Lifecycle
All (300)Filed (55)Permit Issued (76)Signed Off (50)Violation (4)Inspection (60)Objection (25)Special Inspection (30)
09/28/2026
Filed — Alteration
Herewith filing plumbing modifications for interior renovation (cardiology offices, conference, treatment/exam rooms and support areas). No change in use, egress, or occupancy.
M01088019-P3
09/17/2026
Permit issued — Suspended Scaffold
M01444737-I1-SC
09/15/2026
Signed off — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-S3
09/08/2026
Signed off — Alteration
Removal and installation of sprinkler heads as per plans
M01316410-S1
09/04/2026
Signed off — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-S2
08/27/2026
Signed off — Alteration
Removal and installation of sprinkler heads as per plans
M01316410-I1
08/26/2026
Signed off — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-S1
08/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2026
Signed off — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-I1
08/18/2026
Signed off — Alteration
installation of sp heads as per plans
M01200913-S3
08/17/2026
Signed off — Alteration
Removal and installation of sprinkler heads as per plans
M01316410-S2
08/17/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
08/14/2026
Filed — Alteration
INSTALLATION AND USE OF OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT OVER CATWALK AT MOUNT SINAI MEDICAL CENTER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01444737-I1
08/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2026
Special inspection requirement — Final
JONAR MADRIAGA
08/11/2026
Filed — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-P1
08/11/2026
Filed — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-P2
08/07/2026
Permit issued — Plumbing
M01363029-S2-PL
08/07/2026
Permit issued — Mechanical Systems
M01363029-S1-MS
08/06/2026
Permit issued — General Construction
M01363029-I1-GC
08/06/2026
Permit issued — Structural
M01363029-S4-ST
08/03/2026
Filed — Alteration
Herewith filing plumbing modifications for interior renovation (cardiology offices, conference, treatment/exam rooms and support areas). No change in use, egress, or occupancy.
M01088019-P1
08/03/2026
Signed off — Alteration
INTERIOR RENOVATION, PARTITIONS, CEILINGS, FLOORS AND FINISHES
M01316392-I1
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
08/03/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
07/22/2026
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
07/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/21/2026
Signed off — Alteration
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
M01181612-S4
07/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Permit issued — Sprinklers
M01363029-S3-EW-SP
07/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/13/2026
Special inspection requirement — Final
Young Suh
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
07/13/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/06/2026
Permit issued — Mechanical Systems
M01181612-S1-MS
07/02/2026
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY D/F BLADE SIGN FOR MOUNT SINAI EMERGENCY ROOM.
M01317430-I1
06/26/2026
Signed off — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-S3
06/12/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/12/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
06/10/2026
Permit issued — General Construction
M01181612-I1-GC
06/10/2026
Permit issued — Structural
M01181612-S4-ST
06/09/2026
Filed — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-A3
06/01/2026
Permit issued — Sign
M01317430-I1-SG
05/26/2026
Signed off — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-S2
05/26/2026
Signed off — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-S1
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/14/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01290657-S1
05/14/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01290657-I1
04/28/2026
Signed off — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-S5
04/27/2026
Signed off — Alteration
MOUNT SINAI - GUGGENHEIM GP1 CT - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M01214516-I1
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2026
Permit issued — Plumbing
M01181612-S2-PL
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedB&A Restoration Contracting09/17/2026
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co08/07/2026
DOB NOWPlumbingPermit IssuedAlliance Plumbing08/07/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co08/06/2026
DOB NOWStructuralPermit IssuedConsigli Construction Co08/06/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection07/20/2026
DOB NOWMechanical SystemsSigned-offConsigli Construction Co07/06/2026
DOB NOWStructuralSigned-offConsigli Construction Co06/10/2026
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co06/10/2026
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance06/01/2026
DOB NOWPlumbingSigned-offAlliance Plumbing04/24/2026
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe04/03/2026
DOB NOWPlumbingSigned-offPSI Plumbing03/11/2026
DOB NOWSprinklersSigned-offAbsolute Special Insptn02/27/2026
DOB NOWMechanical SystemsSigned-offPaul M Maintenance02/18/2026
DOB NOWGeneral ConstructionSigned-offPaul M Maintenance02/18/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire12/19/2025
DOB NOWGeneral ConstructionPermit IssuedUnity Construction Services12/10/2025
DOB NOWMechanical SystemsPermit IssuedUnity Construction Services12/10/2025
DOB NOWPlumbingSigned-offPSI Plumbing12/04/2025
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance11/28/2025
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co11/20/2025
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co11/20/2025
DOB NOWStructuralPermit IssuedConsigli Construction Co11/20/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/19/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection11/19/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/18/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/18/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/18/2025
DOB NOWGeneral ConstructionPermit IssuedUnity Construction Services11/12/2025
DOB NOWMechanical SystemsPermit IssuedUnity Construction Services11/12/2025
DOB NOWMechanical SystemsPermit IssuedUnity Construction Services11/07/2025
DOB NOWGeneral ConstructionPermit IssuedUnity Construction Services11/07/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe10/29/2025
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe10/07/2025
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/23/2025
DOB NOWSupported ScaffoldSigned-offSafway Atlantic09/22/2025
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction09/04/2025
DOB NOWSprinklersSigned-offAggressive Fire Protection09/04/2025
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction09/04/2025
+ 60 more permits on file
5 projects · most recent 08/11/2026
Ventilation Systems Generators Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Signed-offConsigli Construction CoGenerators, Ventilation Systems
Ventilation
— MEGAPLEAT M9 2,900 CFM ×3
N/A 2,000 CFM · Exhaust Fan ×1
N/a 300 CFM · Exhaust Fan ×1
Greenheck QEI-18 3,000 CFM ×1
Anemostat EZTS 2,900 CFM ×1
XEZTS 2,800 CFM ×1
Generators
Dristeem ULTRASORB-LV 29,000 CFM · Generator ×1
03/28/2026Permit IssuedConsigli Construction CoAir Conditioning Systems
Cooling
Multiaqua MHQWW-12 7,000 BTU · Fan Coil Indoor ×2
MHQWW-36-H-1 26,400 BTU · Fan Coil Indoor ×2
MHCFC4W 39,400 BTU · Fan Coil Indoor ×1
MHCFC4W-08 16,400 BTU · Fan Coil Indoor ×1
MHCFC4W-16 39,400 BTU · Fan Coil Indoor ×1
12/01/2025Signed-offCauldwell Wingate CoVentilation Systems
Ventilation
Titus EZTS Vav Box ×6
11/26/2025Signed-offPaul M MaintenanceVentilation Systems—
10/29/2025Permit IssuedConsigli Construction CoOthers—
8 projects · most recent 09/28/2026
Sprinkler System
FiledStatusContractorScope
09/28/2026Permit IssuedFull Capacity Fire—
08/11/2026Signed-offRael Automatic Sprinkler Co43 heads
06/09/2026Signed-offRael Automatic Sprinkler CoSprinkler System
03/28/2026Permit IssuedSirina Fire ProtectionSprinkler System
12/01/2025Signed-offAggressive Fire Protection31 heads
11/26/2025Signed-offAbsolute Special Insptn45 heads
09/30/2024Permit IssuedSirina Fire Protection1,387 heads
04/15/2024Signed-offAggressive Fire Protection—
7 projects · most recent 09/28/2026
Water/Sanitary Medical Gas
FiledStatusContractorScope
09/28/2026Permit IssuedCardoza Plumbing WmbeWater/Sanitary
08/11/2026Signed-offCardoza Plumbing WmbeMedical Gas, Water/Sanitary
06/09/2026Signed-offCardoza PlumbingMedical Gas, Water/Sanitary
03/28/2026Permit IssuedCardoza PlumbingMedical Gas, Water/Sanitary
12/01/2025Signed-offCardoza PlumbingMedical Gas, Water/Sanitary
11/26/2025Signed-offPSI PlumbingMedical Gas, Water/Sanitary
04/15/2024Signed-offAlliance PlumbingMedical Gas, Water/Sanitary
25 projects · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedRigid ElectricGeneral Wiring
08/25/2026Permit IssuedE-J Electric Installation CoGeneral Wiring
06/18/2026Permit IssuedNJS Electrical ServicesGeneral Wiring
06/08/2026Permit IssuedNJS Electrical ServicesGeneral Wiring
05/20/2026CompleteNead ElectricGeneral Wiring
05/15/2026CompleteHatzel and BuehlerGeneral Wiring
03/19/2026CompleteNead ElectricGeneral Wiring
02/24/2026CompleteDiane ElectricGeneral Wiring
02/09/2026CompleteNead ElectricGeneral Wiring
01/16/2026Permit IssuedProff Electrical—
01/16/2026Permit IssuedProff ElectricalGeneral Wiring
12/08/2025Permit IssuedE-J Electric Installation Co—
12/02/2025Permit IssuedE-J Electric Installation CoGeneral Wiring
09/29/2025Permit IssuedNJS Electrical ServicesGeneral Wiring
09/22/2025Permit IssuedCorporate Electric Group—
4 projects · most recent 08/11/2026
Steel
FiledStatusContractorScope
08/11/2026Signed-offConsigli Construction CoSteel
06/09/2026Signed-offCardoza PlumbingSteel
03/28/2026Permit IssuedConsigli Construction CoSteel
12/01/2025Signed-offCardoza Plumbing1 scope_items
4 projects · most recent 09/22/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
09/22/2025Signed-offSafway AtlanticScaffold, Sidewalk Shed
08/21/2020Permit IssuedSafway AtlanticSidewalk Shed
04/17/2020Permit IssuedSafway AtlanticFence
08/02/2019Permit IssuedRelated ServicesSidewalk Shed
1 project · most recent 08/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/14/2026Permit IssuedB&A Restoration ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 131
DateTypeResultReport
08/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
07/22/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
07/22/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
07/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
01/20/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
01/20/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 131.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/17/2026Sprinkler SystemsJONAR MADRIAGAspecial
08/12/2026FinalJONAR MADRIAGAprogress
08/03/2026Sprinkler SystemsJONAR MADRIAGAspecial
08/03/2026FinalJONAR MADRIAGAprogress
07/13/2026FinalYoung Suhprogress
07/13/2026Mechanical SystemsYoung Suhspecial
07/13/2026Energy Code Compliance InspectionsYoung Suhprogress
06/12/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
06/12/2026Sprinkler SystemsJONAR MADRIAGAspecial
06/12/2026Post-installed AnchorsJONAR MADRIAGAspecial
03/31/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
03/06/2026Maintenance informationJONAR MADRIAGAenergy_progress
03/06/2026Post-installed AnchorsJONAR MADRIAGAspecial
03/06/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
03/06/2026Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
03/06/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/06/2026Post-installed AnchorsJONAR MADRIAGAspecial
03/06/2026Structural Steel - DetailsJONAR MADRIAGAspecial
03/06/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
03/06/2026Structural Steel - WeldingJONAR MADRIAGAspecial
03/06/2026Lighting controlsJONAR MADRIAGAenergy_progress
03/06/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
03/06/2026Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
03/06/2026Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
03/06/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemMedical / HealthcareSub-basement, Floors 1–12
Project M01283368 Alteration · Permit Entire · 10/23/2025
Project M01200913 Alteration · LOC Issued · 08/13/2025
Project M01214516 Alteration · LOC Issued · 06/03/2025
Project M01088019 Alteration · Permit Entire · 10/01/2024
Project M01108285 Alteration · Permit Entire · 09/30/2024
Project M01092681 Alteration CO · Permit Entire · 09/26/2024
Project M01012634 Alteration · LOC Issued · 04/12/2024
Project M01012690 Alteration · LOC Issued · 04/01/2024
Project M00992891 Alteration · Permit Entire · 03/07/2024
Project M00992870 Alteration · LOC Issued · 02/08/2024
Project M00876532 Alteration · LOC Issued · 06/07/2023
Project M00876635 Alteration · LOC Issued · 06/07/2023
BurlingtonRetailCellar, Sub-basement, Floor 5
Project M01065721 Alteration · LOC Issued · 07/11/2024
Project M01065734 Alteration · LOC Issued · 07/10/2024
Project M00821696 Alteration · LOC Issued · 11/30/2023
Project M00821702 Alteration · LOC Issued · 11/30/2023
Project M00821713 Alteration · LOC Issued · 11/30/2023
Project M00821718 Alteration · LOC Issued · 11/30/2023
Project M00958411 Alteration · LOC Issued · 11/30/2023
Project M00820967 Alteration · LOC Issued · 10/13/2023
Project M00820970 Alteration · LOC Issued · 10/11/2023
Project M00821678 Alteration · LOC Issued · 10/11/2023
Project M00821687 Alteration · LOC Issued · 10/11/2023
Project M00905190 Alteration · LOC Issued · 08/29/2023
GP1 Interventional CardiologyMedical / HealthcareSub-basement, Floor 1
Project M00767779 Alteration · LOC Issued · 07/13/2022
Project M00767781 Alteration · LOC Issued · 07/13/2022
Project M00766616 Alteration · LOC Issued · 07/11/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,955 on file (BIS + DOB NOW)
▸Plans & Drawings178
▸DOB NOWPlans/Sketch153
09/03/2026M00489817-I1Request digital key ↗
09/03/2026M00496668-I1Request digital key ↗
09/03/2026M00528718-I1Request digital key ↗
Showing 3 of 153 on file for this type
▸DOB NOWPlans/Sketch - General Construction8
09/03/2026M00445369-P1Request digital key ↗
09/03/2026M00445369-I1Request digital key ↗
09/03/2026M00445366-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/04/2026M00366141-I1Request digital key ↗
09/04/2026M00438868-I1Request digital key ↗
09/03/2026M00439806-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/04/2026M00366108-I1Request digital key ↗
09/03/2026M00438876-P1Request digital key ↗
09/03/2026M00438876-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00199603-I1Request digital key ↗
09/05/2026M00341667-I1Request digital key ↗
09/04/2026M00386587-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00366124-I1Request digital key ↗
09/04/2026M00439798-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00341760-I1Request digital key ↗
▸Applications & Permits420
▸BISWORK PERMIT APPLICATION216
05/23/2024120697870Open ↗
08/11/2020140932720Open ↗
02/25/2020123703046Open ↗
Showing 3 of 216 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION203
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
05/06/2020123207671Open ↗
Showing 3 of 203 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications1,096
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION312
02/05/2020123703046Open ↗
01/21/2020123808424Open ↗
01/21/2020123808424Open ↗
Showing 3 of 312 on file for this type
▸DOB NOWProgress Inspector Seal & Signature248
10/05/2026M01088019-P4Open ↗
10/05/2026M01088019-P3Open ↗
10/01/2026M00491811-I1Open ↗
Showing 3 of 248 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature209
10/05/2026M01088019-P4Open ↗
10/05/2026M01088019-P3Open ↗
10/03/2026M01214516-A2Open ↗
Showing 3 of 209 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature176
09/05/2026M00341667-I1Open ↗
09/04/2026M00366141-I1Open ↗
09/04/2026M00366108-I1Open ↗
Showing 3 of 176 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST56
05/06/2019123808424Open ↗
05/03/2019123731989Open ↗
06/27/2018123419899Open ↗
Showing 3 of 56 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT50
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
05/06/2019123808424Open ↗
Showing 3 of 50 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
Showing 2 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment154
▸BISSELF-CERT PLUMBING NOTICE61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISSCHEDULE B - PLUMBING47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
05/06/2019123808424Open ↗
05/03/2019123731989Open ↗
06/27/2018123419899Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-857
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
02/18/2020122139202Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos271
▸DOB NOWDEP ACP-5: Asbestos Assessment Report145
09/04/2026M00366141-I1Open ↗
09/04/2026M00366108-I1Open ↗
09/03/2026M00445369-I1Open ↗
Showing 3 of 145 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)38
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
02/05/2020123703046Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)7
01/17/2020123808424Open ↗
06/04/2019123731989Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
03/11/2021123419880Open ↗
02/24/2021123419899Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance114
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS53
02/05/2020123703046Open ↗
01/21/2020123808424Open ↗
01/17/2020123808424Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.16
09/03/2026M00528598-I1Open ↗
09/02/2026M00445373-I1Open ↗
09/02/2026M00711844-I1Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
04/07/2021123703046Open ↗
03/22/2021140932720Open ↗
03/16/2021140933630Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
04/07/2021123703046Open ↗
03/22/2021140932720Open ↗
03/11/2021123419880Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
Showing 2 of 3 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/24/2020122062221Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
03/22/2021140932720Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY21
04/07/2021123703046Open ↗
03/22/2021140932720Open ↗
03/16/2021140933630Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/05/2018122672027Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs283
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter176
09/05/2026M00341667-I1Open ↗
09/04/2026M00366141-I1Open ↗
09/04/2026M00366108-I1Open ↗
Showing 3 of 176 on file for this type
▸BISADMINISTRATIVE OBJECTIONS65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
04/07/2021123703046Open ↗
03/22/2021140932720Open ↗
03/16/2021140933630Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFINAL1
11/24/2020122062221Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
05/23/2024120697870Open ↗
▸Cost, Insurance & Ownership180
▸BISCOST AFFIDAVIT179
04/07/2021123703046Open ↗
03/22/2021140932720Open ↗
03/16/2021140933630Open ↗
Showing 3 of 179 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/24/2020122062221Open ↗
▸Filing & Intake Forms177
▸BISEFILING COVER SHEET143
02/05/2020123703046Open ↗
05/06/2019123808424Open ↗
05/06/2019123808424Open ↗
Showing 3 of 143 on file for this type
▸BISBOROUGH INTAKE FORM14
05/23/2024120697870Open ↗
05/06/2020123207671Open ↗
01/21/2020123808424Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION12
03/16/2020123435078Open ↗
08/13/2018123100045Open ↗
Showing 2 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
Showing 2 of 8 on file for this type
▸Other Documents45
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION31
08/05/2020140933630Open ↗
08/05/2020140933630Open ↗
08/06/2018123419880Open ↗
Showing 3 of 31 on file for this type
▸BISSupporting Document: Fee Exempt6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION4
08/05/2020140933630Open ↗
07/30/2020140932720Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type