RoofUnder Construction99p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents · 1 drawing sheet
TEMPORARY ROOF PROTECTION DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 7 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 36Under Construction2p · 1 filing · 12 docs
Plumbing
Issued Permit Scope
Plumbing
HEREBY FILING PLUMBING WORK AT 36TH FLOOR UNIT 36A AS PER PLANS
On file for this project
12 documents
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Under Construction1 filing
Architecture
Issued Permit Scope
General Construction
Project M01462816Permit Issued · 09/30/2026
HEREBY FILING GENERAL CONSTRUCTION WORK AT 30TH FLOOR UNIT 30J AS PER PLANS.
Floor 29Under Construction2 filings · 13 docs
Architecture
Issued Permit Scope
General Construction
Project M01462801Permit Issued · 09/30/2026
HEREBY FILING GENERAL CONSTRUCTION WORK AT 29TH FLOOR UNIT 29J AS PER PLANS
HEREBY FILING GENERAL CONSTRUCTION WORK AT 29TH FLOOR UNIT 29B AS PER PLANS
On file for this project
13 documents
Floor 281p · 1 filing · 9 docs
Architecture
HEREBY FILING GENERAL CONSTRUCTION TO THE 28TH FLOOR UNIT 28H AS PER PLANS
On file for this project
9 documents · 1 drawing sheet
Floor 271p · 1 filing · 9 docs
Architecture
HEREBY FILING PLUMBING WORK AT 27TH FLOOR UNIT 27H AS PER PLANS
On file for this project
9 documents · 1 drawing sheet
Floor 263p · 1 filing · 9 docs
Architecture
Issued Permit Scope
General Construction
HEREWITH FILING PLUMBING WORK TO ADDRESS ECB VIOLATION 39111007H FOR APTS 8H AND 26D PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
9 documents
Floor 25
Floor 24
Floor 23Under Construction5p · 1 filing · 14 docs
Architecture
Issued Permit Scope
General Construction
HEREBY FILING GENERAL CONSTRUCTION WORK AT 23RD FLOOR UNIT 23C AS PER PLANS.
On file for this project
14 documents
Floor 22
Floor 21
Floor 20
Floor 19Under Construction12p · 3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
HEREBY FILING PLUMBING WORK AT 19TH FLOOR UNIT 19A AS PER PLANS.
On file for this project
12 documents · 1 drawing sheet
HEREBY FILING PLUMBING WORK AS PER PLANS ON THE 19TH FLOOR UNITS 19J, 19H, 19I. NO CHANGE IN USE EGRESS, OR OCCUPANCY
On file for this project
10 documents · 1 drawing sheet
HEREBY FILING INTERIOR CONSTRUCTION TO 19TH FLOOR TO APT #19H, 19i & I9J (3 EXISTING APARTMENTS) AND INTERIOR WORK TO APT 19J - CREATING 2 TOTAL UNITS. PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
19 documents · 4 drawing sheets
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Under Construction3p · 1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
Plumbing
HEREBY FILING PLUMBING WORK AT 10TH FLOOR UNIT 10J AS PER PLANS.
On file for this project
8 documents · 1 drawing sheet
Floor 9
Floor 84p · 1 filing · 9 docs
Architecture
Issued Permit Scope
General Construction
HEREWITH FILING PLUMBING WORK TO ADDRESS ECB VIOLATION 39111007H FOR APTS 8H AND 26D PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
9 documents · 1 drawing sheet
Floor 7
Floor 6Under Construction121p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 2 drawing sheets
USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALTERATION M00930717-I1.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 5Under Construction121p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 2 drawing sheets
USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALTERATION M00930717-I1.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 4Under Construction121p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 2 drawing sheets
USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALTERATION M00930717-I1.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3Under Construction119p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 1 drawing sheet
TEMP CONSTRUCTION OFFICE IN ACCORDANCE WITH BC 3303.16.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 2Under Construction121p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 1 drawing sheet
USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALTERATION M00930717-I1.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 1Under Construction143p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
On file for this project
8 documents
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 1 drawing sheet
INTERIOR FIT OUT OF STOREFRONT FOR TEMP RELOCATION OF MUSEUM OFFICES, STORAGE AND RECEPTION. APPLICATION FILED IN CONJUNCTION WITH M00930717.
On file for this project
28 documents
Latest 3 of 8 filings on this floor.
CellarUnder Construction111p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe · Structural
USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1.
On file for this project
93 documents · 6 drawing sheets
USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALTERATION M00930717-I1.
On file for this project
11 documents · 2 drawing sheets
HEREWITH FLING TO REMOVE EXISTING FIRE PUMP AND INSTALL A NEW FIRE PUMP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.