Hospital, sanitarium, mental institution
NH Lenox Hill Hospital Campus
130 EAST 77TH STREET · BIN 1082184
💬 Discuss this project
1930Year Built
14Stories
I1Building Class
C1-8Zoning
775,241 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized10 Active Violations 2 unresolved · 8 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · Owner of record: Lenox Hill Hospital · 81,503 sf lot · 9.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNH Lenox Hill Hospital Campus1p · 1 filing · 2 docs
Floor 1NH Lenox Hill Hospital Campus16p · 1 filing · 10 docs
CellarNH Lenox Hill Hospital Campus45p · 5 filings · 17 docs
Site & exteriorNH Lenox Hill Hospital Campus4p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lenox Hill Hospital2907/08/2026
Northwell Health1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE101/05/2026
Enthink Engineers110/24/2023
Lizardos Engineering408/29/2023
Gilsanz Murray Steficek110/17/2022
Pamela A. Smith210/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Support Buildings of New York703/21/2026
Riggining Consultants103/21/2026
Louis Striar203/21/2026
Support Buildings703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK Enterprises NYScaffold603/21/2026
Central Consulting & ContGeneral Contractor407/08/2026
Capital Contracting P&HPlumbing307/08/2026
Decora Electric CoElectrical203/21/2026
Red Hook Sign and ElectricSign hanger107/08/2026
Capital Contracting P & HFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A Engineering1854508/29/2023
Gilsanz Murray Steficek240110/17/2022
Building Lifecycle
All (70)Filed (10)Permit Issued (9)Signed Off (8)Facade (FISP) (12)Violation (9)Inspection (5)Special Inspection (17)
02/09/2026
Signed off — Alteration
M01333902-I1
01/30/2026
Permit issued — Sign
M01333902-I1-SG
01/05/2026
Filed — Alteration
M01333902-I1
11/15/2024
Signed off — Alteration
M00951470-I1
10/23/2024
Permit issued — Sidewalk Shed
M00951470-I1-SH
08/26/2024
Signed off — Alteration
M01003834-I1
03/20/2024
Cycle 9 facade report submitted
03/19/2024
Cycle 9 facade report signed — SWARMP
03/18/2024
Cycle 9 facade inspection completed
03/08/2024
Permit issued — Suspended Scaffold
M01003834-I1-SC
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2024
Filed — Alteration
M01003834-I1
01/31/2024
Signed off — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-I1
10/24/2023
Filed — Alteration
M00951470-I1
10/24/2023
Permit issued — Sidewalk Shed
M00951470-I1-SH
10/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/30/2023
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
08/29/2023
Signed off — Alteration
Relocate 4 sprinkler heads within therapy vault. No change in use or egress
M08011716-I1
08/29/2023
Filed — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-P1
08/14/2023
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
08/12/2023
Signed off — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-I1
07/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2023
Signed off — Alteration
M08011173-I1
06/27/2023
Signed off — Alteration
M08011695-I1
11/09/2022
Permit issued — Structural
M08011173-I1-ST
10/31/2022
Permit issued — Mechanical Systems
M08011695-I1-MS
10/26/2022
Permit issued — General Construction
M08011154-I1-GC
10/20/2022
Permit issued — Sprinklers
M08011716-I1-EW-SP
10/20/2022
Permit issued — Plumbing
M08011747-I1-PL
10/17/2022
Filed — Alteration
M08011173-I1
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Final
Pamela Smith
10/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Structural Steel - Welding
Philip Murray
10/17/2022
Special inspection requirement — Structural Steel - Details
Philip Murray
10/17/2022
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
10/17/2022
Special inspection requirement — Post-installed Anchors
Philip Murray
10/14/2022
Filed — Alteration
M08011695-I1
10/13/2022
Filed — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-I1
10/13/2022
Filed — Alteration
Relocate 4 sprinkler heads within therapy vault. No change in use or egress
M08011716-I1
10/13/2022
Filed — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-P1
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/11/2022
Special inspection requirement — Final
10/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
10/11/2022
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
10/11/2022
Special inspection requirement — Energy Code Compliance Inspections
10/04/2022
Filed — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-I1
09/28/2022
Special inspection requirement — Sprinkler Systems
CHAROULIS CHARALAMBOUS
09/27/2022
Special inspection requirement — Final
Philip Murray
05/26/2017
Cycle 8 facade report signed — SAFE
05/11/2017
Cycle 8 facade report submitted
05/01/2017
Cycle 8 facade inspection completed
01/04/2016
Violation issued (ECB, closed)
Construction
03/20/2015
Violation issued (ECB, closed)
Local Law
02/13/2015
Cycle 7 facade report submitted
02/10/2015
Cycle 7 facade report signed — SWARMP
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offRed Hook Sign and Electric01/30/2026
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY10/23/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System03/08/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY10/24/2023
DOB NOWStructuralSigned-offCentral Consulting & Cont11/09/2022
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont10/31/2022
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont10/26/2022
DOB NOWSprinklersSigned-offCapital Contracting P & H10/20/2022
DOB NOWPlumbingSigned-offCapital Contracting P&H10/20/2022
BISEQISSUEDSpring Scaffolding03/01/2016
BISOTISSUEDB & A Restoration Contracting11/12/2015
BISEQISSUEDSpring Scaffolding03/17/2015
BISSPISSUEDPace Plumbing09/15/2014
BIS—ISSUEDAxis Construction08/05/2014
BISSPISSUEDSirina Fire Protection05/29/2014
BISSPISSUEDSirina Fire Protection02/26/2014
BISSDISSUEDApproved Fire Prevention01/23/2014
BISPLISSUEDMac Felder11/18/2013
BISOTISSUEDAxis Construction11/07/2013
BISOTISSUEDAxis Construction10/17/2013
BISOTISSUEDAxis Construction10/10/2013
BISMHISSUEDAxis Construction10/10/2013
BISSPISSUEDSirina Fire Protection09/24/2013
BISMHISSUEDAxis Construction04/19/2013
BISOTISSUEDAxis Construction04/19/2013
BISMHISSUEDAxis Construction03/12/2013
BISOTISSUEDAxis Construction03/12/2013
BISSDISSUEDApproved Fire Prevention01/14/2013
BISOTISSUEDAxis Construction02/21/2012
BISMHISSUEDAxis Construction02/21/2012
BISSPISSUEDSirina Fire Protection10/27/2011
BISPLISSUEDPar Plumbing Co10/21/2011
BISOTISSUEDAxis Construction10/20/2011
BISMHISSUEDAxis Construction10/20/2011
BISPLISSUEDAljer Plumbing & Heating10/08/2009
BISOTISSUEDB & A Restoration Contracting07/17/2006
BISEQISSUEDCentral Consulting & Cont06/12/2006
BISOTISSUEDCentral Consulting & Cont06/12/2006
BISEQISSUEDPerimeter Bridge & Scaffold05/25/2006
BISEQISSUEDCentral Consulting & Cont12/30/2005
+ 12 more permits on file
1 project · most recent 10/24/2023
FiledStatusContractorScope
10/24/2023Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/30/2023Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
08/14/2023Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
10/17/2022Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
10/17/2022Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
10/17/2022FinalPamela Smithprogress
10/17/2022Fire-Resistance Rated ConstructionCHAROULIS CHARALAMBOUSprogress
10/17/2022Structural Steel - WeldingPhilip Murrayspecial
10/17/2022Structural Steel - DetailsPhilip Murrayspecial
10/17/2022Concrete - Cast-In-PlacePhilip Murrayspecial
10/17/2022Post-installed AnchorsPhilip Murrayspecial
10/11/2022Fire-Resistant Penetrations and Joints—special
10/11/2022Final—progress
10/11/2022Fire-Resistance Rated Construction—progress
10/11/2022Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
10/11/2022Energy Code Compliance Inspections—progress
09/28/2022Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
09/27/2022FinalPhilip Murrayprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NH Lenox Hill Hospital CampusMedical / HealthcareEntire building
Project M01333902 Alteration · LOC Issued · 01/05/2026
Project M01003834 Alteration · LOC Issued · 02/16/2024
Project M00951470 Alteration · LOC Issued · 10/24/2023
Project M08011173 Alteration · LOC Issued · 10/17/2022
Project M08011695 Alteration · LOC Issued · 10/14/2022
Project M08011716 Alteration · LOC Issued · 10/13/2022
Project M08011747 Alteration · LOC Issued · 10/13/2022
Project M08011154 Alteration · LOC Issued · 10/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 304 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026M08011716-I1Request digital key ↗
09/01/2026M08011154-P1Request digital key ↗
09/01/2026M08011154-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION35
02/19/2016121720085Open ↗
02/19/2016121718230Open ↗
12/02/2015121971517Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION27
03/18/2016122338078Open ↗
12/02/2015121971517Open ↗
03/23/2015122338078Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/16/2014121185047Open ↗
08/16/2014121185047Open ↗
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
05/17/2017121971517Open ↗
01/12/2016121718230Open ↗
12/05/2014121543311Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08011154-P1Open ↗
09/01/2026M08011154-I1Open ↗
09/01/2026M08011695-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M08011154-I1Open ↗
09/02/2026M08011716-I1Open ↗
09/02/2026M08011716-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
02/21/2013121508314Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M08011154-I1Open ↗
09/02/2026M08011154-I1Open ↗
09/02/2026M08011154-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/21/2013121508314Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE16
09/26/2014121543311Open ↗
09/11/2014121543295Open ↗
09/05/2014121543295Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING10
11/05/2013121543302Open ↗
07/26/2013121718230Open ↗
04/15/2013121543311Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/25/2014121543295Open ↗
05/16/2014121563414Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
03/17/2014121543311Open ↗
03/17/2014120798654Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
09/05/2014121543295Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
05/22/2014121185047Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08011154-P1Open ↗
09/01/2026M08011154-I1Open ↗
09/01/2026M08011695-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
10/23/2015121971517Open ↗
08/05/2014121185047Open ↗
11/11/2013121824687Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
09/13/2013121543311Open ↗
07/26/2013121718230Open ↗
07/23/2013121543295Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/17/2017121971517Open ↗
09/26/2014121185047Open ↗
08/16/2014121185047Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/17/2017121971517Open ↗
09/26/2014121185047Open ↗
▸BISTR8: Energy Code Progress Inspections2
01/21/2015121971517Open ↗
08/25/2014121508314Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
05/01/2014121543295Open ↗
▸Approvals, Objections & Sign-offs37
▸BISADMINISTRATIVE OBJECTIONS11
04/15/2013121512602Open ↗
04/15/2013121543295Open ↗
04/15/2013121543311Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
05/17/2017121971517Open ↗
10/03/2016122338078Open ↗
07/21/2016122338078Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/01/2026M08011695-I1Open ↗
08/13/2026M08011154-I1Open ↗
08/13/2026M08011173-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/17/2017121971517Open ↗
07/21/2016122338078Open ↗
08/27/2014121718230Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPRVD FAB CERT-COMPLIANCE1
10/03/2016122338078Open ↗
▸BISSHED LETTER1
03/18/2016122338078Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
05/17/2017121971517Open ↗
12/02/2015121971517Open ↗
09/15/2015121971517Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET18
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
07/30/2013121720085Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION9
01/21/2015121971517Open ↗
09/03/2014121185047Open ↗
08/06/2014121508314Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet2
01/21/2015121971517Open ↗
Showing 1 of 2 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/02/2014121971517Open ↗
11/09/2013121824687Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01003834-I1Open ↗