← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
138 GRAND STREET
MANHATTAN · BIN 1091063
💬 Discuss this project
1900Year Built
6Stories
D0Building Class
M1-5/R7XZoning
71,413 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: Ironclad Artists · 12,616 sf lot · 5.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofElevator and stair bulkhead rebuild2p · 3 filings · 20 docs
Floor 6Unit 6E18p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2Interior renovation of live work loft1 filing · 14 docs
Floor 1Elevator and stair bulkhead rebuild1 filing · 16 docs
Mezzanine2p · 2 filings · 20 docs
CellarElevator and stair bulkhead rebuild1 filing · 16 docs
Sub-CellarElevator and stair bulkhead rebuild1 filing · 16 docs
Site & exteriorPipe scaffold installation15p · 2 filings · 4 docs
Filed — no permit issuedMack Edge Mgmt LLC8p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ironclad Artists5103/21/2026
Melabar Holding103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Combined Architecture604/30/2026
Jag Engineering202/19/2026
Synthesis Architecture306/03/2025
Rigid Structural Design205/07/2025
Bendix Engineering204/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1603/21/2026
Rigging Consultants403/21/2026
Rigid Structural Design403/21/2026
Can Art Change the World203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystems Installation S&SScaffold407/08/2026
A Plus PlumbingPlumbing206/28/2026
Desuze ElectricElectrical103/21/2026
Aurora Electrical ContgElectrical103/21/2026
Aore OperationsGeneral Contractor107/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hudson Peaks Consulting8381804/30/2026
Benazzi Engineering5603106/03/2025
Synthesis Architecture4252306/03/2025
Bendix Engineering4293204/04/2025
Building Lifecycle
07/27/2026
Signed off — Alteration
Interior renovation of unit 6e. No change to use, egress or occupancy. No exterior work.
M00906395-S1
05/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
04/30/2026
Filed — Alteration
Interior renovation of unit 6e. No change to use, egress or occupancy. No exterior work.
M00906395-P6
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
133 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA Plus Plumbing03/26/2026
DOB NOWSuspended ScaffoldPermit IssuedSkyhigh Murals - Colossal01/27/2026
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S05/08/2025
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S05/08/2025
DOB NOWPlumbingSigned-offA Plus Plumbing04/25/2025
DOB NOWPlumbingSigned-offArco Plumbing and Heating08/30/2024
DOB NOWGeneral ConstructionSigned-offAore Operations08/23/2024
BISOTISSUEDKing Rose of NY03/12/2021
BISOTISSUEDKing Rose of NY12/16/2020
BISOTISSUEDKing Rose of NY01/14/2020
BISPLISSUEDHertler Nadile P & H07/16/2018
BISSPISSUEDMej Plumbing11/29/2017
BISPLISSUEDHertler Nadile P & H05/08/2017
BISOTISSUEDZoon Development03/31/2017
BISOTISSUEDZoon Development03/31/2017
BISMHISSUEDZoon Development03/31/2017
BISOTISSUEDIA Construction Management08/27/2015
BISMHISSUEDIA Construction Management08/27/2015
BISOTISSUEDIA Construction Management08/14/2015
BISOTISSUEDIA Construction Management08/14/2015
BIS—ISSUEDIA Construction Management08/14/2015
BISSPISSUEDJ. Caiazzo Plumbing & Heating03/17/2015
BISOTISSUEDIA Construction Management10/06/2014
BISOTISSUEDIA Construction Management10/06/2014
BISEQISSUEDIntersystem S&S10/03/2014
BIS—ISSUEDIA Construction Management08/27/2014
BISMHISSUEDIA Construction Management08/27/2014
BISOTISSUEDIA Construction Management08/27/2014
BISMHISSUEDIA Construction Management08/14/2014
BISOTISSUEDIA Construction Management08/14/2014
BISOTISSUEDJanbar07/29/2014
BISEQISSUEDJanbar07/28/2014
BISEQISSUEDJanbar07/25/2014
BISEQISSUEDIntersystems07/24/2014
BISOTISSUEDRND Services12/04/2013
BIS—ISSUEDIA Construction Management08/26/2013
BISOTISSUEDIA Construction Management08/12/2013
BISOTISSUEDIA Construction Management08/12/2013
BISOTISSUEDIA Construction Management08/12/2013
BISMHISSUEDIA Construction Management08/12/2013
+ 17 more permits on file
1 project · most recent 06/03/2025
FiledStatusContractorScope
06/03/2025Signed-offR.J.C. Mechanical—
2 projects · most recent 04/30/2026
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
04/30/2026Signed-offA Plus PlumbingGas, Water/Sanitary
06/03/2025Signed-offR.J.C. MechanicalPlumbing-Sprinkler, Water/Sanitary
3 projects · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026CompleteDesuze ElectricGeneral Wiring
08/25/2025CompleteStellmann ElectricalGeneral Wiring
05/10/2025CompleteAurora Electrical Contg—
1 project · most recent 12/05/2024
Steel
FiledStatusContractorScope
12/05/2024Permit IssuedKing Rose of NYSteel
1 project · most recent 01/15/2026
Suspended Scaffold
FiledStatusContractorScope
01/15/2026Permit IssuedSkyhigh Murals - ColossalSuspended Scaffold
1 project · most recent 01/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/15/2026Permit IssuedSkyhigh Murals - ColossalSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
05/02/2026Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
04/27/2026Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
12/22/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
12/22/2025Structural Cold-Formed SteelGIORGI KHARDZEISHVILIspecial
12/22/2025FinalJosh Greggprogress
12/22/2025Structural Steel - WeldingGIORGI KHARDZEISHVILIspecial
12/22/2025Structural Steel - DetailsGIORGI KHARDZEISHVILIspecial
12/22/2025Structural Steel - High Strength BoltingGIORGI KHARDZEISHVILIspecial
12/22/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
05/27/2025Fire-Resistance Rated ConstructionBrian Ripelprogress
05/27/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
05/27/2025FinalBrian Ripelprogress
05/20/2025Tenant Protection Plan ComplianceDaniel Kohsspecial
05/20/2025Fire-Resistant Penetrations and JointsDaniel Kohsspecial
05/20/2025Sprinkler SystemsGregory Benazzispecial
03/14/2025Sprinkler SystemsMatthew Bendixspecial
03/14/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
03/04/2025Wood – Seismic Resistance—special
02/21/2025Structural Steel - WeldingGIORGI KHARDZEISHVILIspecial
02/21/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
02/21/2025FinalBrian Ripelprogress
02/21/2025Fire-Resistance Rated ConstructionBrian Ripelprogress
02/21/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
02/21/2025Structural Cold-Formed SteelGIORGI KHARDZEISHVILIspecial
02/21/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
Latest 25 of 44.
474 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account