← Back
Two family brick
138 PACIFIC STREET
BROOKLYN · BIN 3003030
💬 Discuss this project
1842Year Built
3Stories
B1Building Class
R6Zoning
3,679 sfGross Floor Area
2Units
Rent Stabilized0 Open Violations
Two family brick · Owner of record: EDGE ASSOCIATES PACIFIC LLC · 2,000 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof6p · 1 filing · 20 docs
Floor 322p · 2 filings · 20 docs
Floor 233p · 2 filings · 20 docs
Floor 123p · 1 filing · 16 docs
Cellar31p · 2 filings · 20 docs
Basement26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EDGE ASSOCIATES PACIFIC LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2021$3.5M—— → —$951/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R.J. MCGEE ENGINEERING, PLLC712/27/2023
PVE ENGINEERING211/06/2023
SA-DA ARCHITECTURE210/18/2023
HAMANN ENGINEERING, PLLC1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XIA CONSTRUCTION MNGMT*General Contractor807/08/2026
S & L PLUMBING INCPlumbing307/08/2026
CASE PLUMBING LLCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R.J. MCGEE ENGINEERING, P7878612/27/2023
VIBRANALYSIS INC., DBA VT6864211/06/2023
SA-DA ARCHITECTURE2640410/18/2023
Building Lifecycle
All (92)Filed (10)Permit Issued (9)Signed Off (3)Violation (10)Inspection (13)Objection (22)Special Inspection (25)
05/31/2024
Signed off — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH THE CONVERSION OF 4 FAMILY BUILDING TO TWO FAMILY AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY PRPOSED UNDER THIS APPLICATION.
B00719728-I1
05/01/2024
Signed off — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-I1
04/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2024
Violation issued (HPD, closed)
A
01/22/2024
Permit issued — Plumbing
B93797235-I1-EW-SP
01/22/2024
Permit issued — Sprinklers
B42641593-I1-PL
01/08/2024
Signed off — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-S1
12/27/2023
Filed — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-P7
12/27/2023
Special inspection requirement — Mechanical Systems
Robert McGee
12/27/2023
Special inspection requirement — Final
Robert McGee
12/27/2023
Special inspection requirement — Heating Systems
Robert McGee
12/20/2023
Special inspection requirement — Final
Robert McGee
12/20/2023
Special inspection requirement — Mechanical Systems
Robert McGee
12/20/2023
Special inspection requirement — Heating Systems
Robert McGee
11/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN GOMEZ
11/20/2023
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
11/20/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
alon egozi
11/20/2023
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
11/20/2023
Special inspection requirement — Footing and Foundation
alon egozi
11/20/2023
Special inspection requirement — Final
alon egozi
11/20/2023
Special inspection requirement — Structural Cold-Formed Steel
JUAN GOMEZ
11/20/2023
Special inspection requirement — Masonry
JUAN GOMEZ
11/20/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JUAN GOMEZ
11/20/2023
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
11/20/2023
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
11/20/2023
Special inspection requirement — Subgrade Inspections
JUAN GOMEZ
11/17/2023
Violation issued (HPD, closed)
I
11/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/09/2023
Permit issued — Mechanical Systems
B00794194-S1-MS
11/06/2023
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH THE CONVERSION OF 4 FAMILY BUILDING TO TWO FAMILY AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY PRPOSED UNDER THIS APPLICATION.
B00719728-P1
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Scope
10/25/2023
Objection raised — Scope
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
10/25/2023
Objection raised — Other
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
10/18/2023
Filed — Alteration CO
ALTERATION TYPE 1 FILED TO CONVERT 4-FAMILY BUILDING TO 2-FAMILY BUILDING. NEW CERTIFICATE OF OCCUPANCY REQUESTED. ALTERATIONS TO CONSIST OF NEW AND RELOCATED PARTITIONS AND NEW REAR DECK. NO CHANGE TO ZONING OR BUILDING BULK UNDER THIS APPLICATION.
B00719435-P1
09/18/2023
Filed — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-S1
08/18/2023
Special inspection requirement — Sprinkler Systems
Robert McGee
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert McGee
08/17/2023
Filed — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-P3
08/07/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/28/2023
Filed — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-P2
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert McGee
07/27/2023
Special inspection requirement — Post-installed Anchors
Alexander Stoltz
07/27/2023
Special inspection requirement — Sprinkler Systems
Robert McGee
07/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2023
Filed — Alteration
Mechanical job as per plans filled herewith, No change in use, egress and occupancy under this application.
B00794194-P1
03/24/2023
Violation issued (HPD, closed)
A
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC01/22/2024
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/22/2024
DOB NOWMechanical SystemsSigned-offXIA CONSTRUCTION MNGMT*11/09/2023
DOB NOWPlumbingSigned-offS & L PLUMBING INC01/09/2023
DOB NOWFoundationSigned-offXIA CONSTRUCTION MNGMT*09/20/2022
DOB NOWPlumbingSigned-offS & L PLUMBING INC09/13/2022
DOB NOWPlumbingSigned-offS & L PLUMBING INC09/13/2022
DOB NOWGeneral ConstructionPermit IssuedXIA CONSTRUCTION MNGMT*08/25/2022
DOB NOWGeneral ConstructionPermit IssuedXIA CONSTRUCTION MNGMT*07/26/2022
1 project
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
———Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUNO38GSS4 38,000 BTU · Vrf Outdoor ×4
3 projects · most recent 05/25/2024
General Wiring
FiledStatusContractorScope
05/25/2024CompleteCL ELECTRICAL CORPGeneral Wiring
06/15/2023CompleteA ELECTRICAL MAIN SVC INC3 meters, 3 new_meters
11/23/2022CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
12/27/2023Mechanical SystemsRobert McGeespecial
12/27/2023FinalRobert McGeeprogress
12/27/2023Heating SystemsRobert McGeespecial
12/20/2023FinalRobert McGeeprogress
12/20/2023Mechanical SystemsRobert McGeespecial
12/20/2023Heating SystemsRobert McGeespecial
11/20/2023Structural Stability – Alterations of existing buildingsJUAN GOMEZspecial
11/20/2023Structural Steel - WeldingJUAN GOMEZspecial
11/20/2023Subsurface Investigations (Borings/Test Pits)alon egozispecial
11/20/2023Structural Steel - DetailsJUAN GOMEZspecial
11/20/2023Footing and Foundationalon egoziprogress
11/20/2023Finalalon egoziprogress
11/20/2023Structural Cold-Formed SteelJUAN GOMEZspecial
11/20/2023MasonryJUAN GOMEZspecial
11/20/2023Structural Steel - High Strength BoltingJUAN GOMEZspecial
11/20/2023Concrete - Cast-In-PlaceJUAN GOMEZspecial
11/20/2023Post-installed AnchorsJUAN GOMEZspecial
11/20/2023Subgrade InspectionsJUAN GOMEZspecial
08/18/2023Sprinkler SystemsRobert McGeespecial
08/18/2023Fire-Resistant Penetrations and JointsRobert McGeespecial
07/27/2023Fire-Resistant Penetrations and JointsRobert McGeespecial
07/27/2023Post-installed AnchorsAlexander Stoltzspecial
07/27/2023Sprinkler SystemsRobert McGeespecial
09/08/2022Subgrade Inspections—special
09/08/2022Concrete - Cast-In-Place—special
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B00719728-P1Request digital key ↗
08/28/2026B00794194-P1Request digital key ↗
08/28/2026B00794194-P7Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/28/2026B00794194-I1Open ↗
08/28/2026B00794194-S1Open ↗
08/28/2026B00794194-P2Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00719435-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWSpecial Inspector Seal & Signature19
08/31/2026B00794194-P2Open ↗
08/31/2026B00794194-P2Open ↗
08/31/2026B00794194-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00719728-I1Open ↗
08/28/2026B00719728-P1Open ↗
08/28/2026B00794194-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00719728-I1Open ↗
08/25/2026B00794194-P7Open ↗
08/23/2026B00794194-S1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00719435-P1Open ↗
08/13/2026B00719435-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00719435-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B00719728-P1Open ↗
08/28/2026B00794194-P1Open ↗
08/28/2026B00794194-I1Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00719728-I1Open ↗
08/13/2026B00719728-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00719728-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00719728-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00719435-P1Open ↗
▸Other Documents13
▸DOB NOWProof of Historic Building9
08/28/2026B00794194-P2Open ↗
08/28/2026B00794194-P1Open ↗
08/28/2026B00794194-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification2
08/15/2026B00719435-P1Open ↗
08/15/2026B00719435-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00719728-I1Open ↗
08/13/2026B00719744-I1Open ↗