| Owner | Filings | Most Recent |
|---|---|---|
| 140 BW | 596 | 09/29/2026 |
| CBRE | 147 | 09/13/2026 |
| JLL | 41 | 07/08/2026 |
| JONES LANG LASALLE | 135 | 07/08/2026 |
| 140 8W LLC | 1 | 03/22/2026 |
| HINES AS MANAGER FOR 140 | 1 | 03/22/2026 |
| 140 BROADWAY | 34 | 03/22/2026 |
| 140 B W LLC | 1 | 03/22/2026 |
| HINES | 275 | 03/22/2026 |
| SCOTT P. MURRAY (PROPERTY | 9 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| OGP ARCHITECTS, LLP | 2 | 08/19/2026 |
| AKF ENGINEERS, LLP | 1 | 08/12/2026 |
| WARE MALCOMB ARCH AND ENG P.C. | 8 | 07/09/2026 |
| TPG ARCHITECTURE, LLP | 36 | 07/08/2026 |
| ROBERT DERECTOR ASSOCIATES | 108 | 06/11/2026 |
| ALWAYS FAST SERVICES CORP | 1 | 06/05/2026 |
| VERDERAME-CALE ARCHITECTURE | 5 | 03/17/2026 |
| MG ENGINEERING D.P.C. | 12 | 03/11/2026 |
| SHMERYKOWSKY CONSULTING ENGINEERS | 12 | 03/03/2026 |
| STARK CONSULTING, LLC | 4 | 01/28/2026 |
| EJZ ENGINEERING | 1 | 12/21/2025 |
| GREEN DESIGN | 1 | 11/20/2025 |
| AM ARCHITECT P.C. | 2 | 09/22/2025 |
| RUSSELL BAUMANN | 1 | 08/21/2025 |
| ARMOUR UNSDERFER ENGINEERING INC, P | 1 | 08/20/2025 |
| COLLADO ENGINEERING | 2 | 04/16/2025 |
| VERONA CARPENTER ARCHITECTS | 1 | 02/24/2025 |
| OF POSSIBLE | 1 | 02/19/2025 |
| PERKINS and WILL | 1 | 10/03/2024 |
| MARGULIES HOELZLI ARCHITECTURE PLLC | 1 | 10/02/2024 |
| AREZOU ATTAR | 1 | 09/24/2024 |
| FACADE MD ARCHITECTURE AND ENGINEER | 2 | 09/18/2024 |
| HALSEY MCCORMACK HELMER INC | 13 | 07/15/2024 |
| WILLIAM GRAHAM RICE | 12 | 05/15/2024 |
| PERKINS EASTMAN | 2 | 03/29/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 204 | 03/21/2026 |
| METROPOLIS GROUP INC | 68 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 77 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| DOMANI CONSULTING | 3 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| RIZZO GROUP | 5 | 03/21/2026 |
| MICHAEL ZENREICH ARCHITECT | 4 | 03/21/2026 |
| LEVERICH DESIGN STUDIO INC. | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| THEODORE WILLIAMS CONSTR | General Contractor | 50 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 33 | 07/08/2026 |
| SWINERTON BUILDERS | General Contractor | 29 | 07/16/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 24 | 07/15/2026 |
| STRUCTURE TONE, LLC | General Contractor | 23 | 09/29/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 15 | 07/08/2026 |
| L&K PARTNERS, INC | General Contractor | 15 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 12 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 11 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 10 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 9 | 07/08/2026 |
| PENGUIN AIR CONDITIONING | General Contractor | 8 | 03/21/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 8 | 07/08/2026 |
| GEOFFREY A. LAGAS & ASSOC | Plumbing | 8 | 08/20/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 7 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 7 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 6 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 5 | 04/09/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 5 | 07/08/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 5 | 07/08/2026 |
| WOLF CONSTRUCTION CORP 20 | General Contractor | 4 | 07/08/2026 |
| HEAVY DUTY BUILDERS LLC | General Contractor | 4 | 08/27/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 3 | 07/08/2026 |
| CANNON MECHANICAL INC | General Contractor | 3 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ASDA ARCHITECTURE + DESIG | 2015 | 2 | 08/19/2026 |
| CODEGREEN | 510 | 6 | 08/12/2026 |
| SOCOTEC ENGINEERING | 4983 | 42 | 07/09/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 28 | 03/17/2026 |
| ENGINEERING BUILDING SERV | 7303 | 16 | 03/03/2026 |
| OPERA STUDIO ARCHITECTURE | 5970 | 1 | 02/19/2025 |
| DNA CONTROLLED INSPECTION | 554 | 7 | 12/10/2024 |
| SAG ENGINEERING & CONSULT | 608 | 2 | 09/18/2024 |
| ETI CONSULTANTS LLC | 7694 | 27 | 05/15/2024 |
| COASTAL CONSTRUCTION SERV | 3827 | 31 | 01/25/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 09/28/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 09/28/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | HEAVY DUTY BUILDERS LLC | 08/26/2026 |
| DOB NOW | Plumbing | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 08/18/2026 |
| DOB NOW | Plumbing | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 07/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SWINERTON BUILDERS | 07/14/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 07/14/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 07/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SWINERTON BUILDERS | 07/10/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 07/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SWINERTON BUILDERS | 07/07/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 07/07/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 07/02/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SWINERTON BUILDERS | 06/15/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 06/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 06/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 06/05/2026 |
| DOB NOW | General Construction | Permit Issued | AMERICON CONSTRUCTION INC. | 06/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AMERICON CONSTRUCTION INC. | 06/04/2026 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 03/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 03/27/2026 |
| DOB NOW | Structural | Permit Issued | KING ROSE OF NY, INC | 03/11/2026 |
| DOB NOW | Structural | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | Plumbing | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 01/20/2026 |
| DOB NOW | Plumbing | Signed-off | ABCO-PEERLESS SPRKLR CORP | 01/20/2026 |
| DOB NOW | Plumbing | Signed-off | GEOFFREY A. LAGAS & ASSOC | 01/15/2026 |
| DOB NOW | General Construction | Signed-off | THEODORE WILLIAMS CONSTR | 01/15/2026 |
| DOB NOW | General Construction | Signed-off | THEODORE WILLIAMS CONSTR | 01/14/2026 |
| DOB NOW | Mechanical Systems | Signed-off | THEODORE WILLIAMS CONSTR | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 10/29/2025 |
| DOB NOW | Plumbing | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 10/28/2025 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 10/28/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAB PLBG & HTG CO INC | 10/28/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/12/2026 | — | — | Others | Other N/A na |
| 04/17/2026 | Permit Issued | AMERICON CONSTRUCTION INC | Air Conditioning Systems | Cooling Water Furnace V5AV024 RR 23,970 BTU · Heat Pump Outdoor ×1 |
| 03/11/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Water Furnace V5AH024BD3AG1DERBANN312SSS 24,880 BTU · Wshp ×2 V5AH024BD4AG4DERBANN312SSS 18,670 BTU · Wshp ×2 V5AH036BD3AG2DERBANN312SSS 37,900 BTU · Wshp ×2 V5AH036BD3AG2DSRBANN312SSS 37,900 BTU · Wshp ×2 V5AH048BD3AG2DERBANN312SSS 47,550 BTU · Wshp ×2 Wa ×2 |
| 12/21/2025 | — | — | Heating and Air Conditioning Systems | Heat / Cool Daikin RXTQ36TAVJU 36,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 07/08/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 07/01/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 06/11/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 04/17/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 03/11/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 810 heads |
| 01/12/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 09/11/2025 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 09/09/2025 | Signed-off | CMP PIPING INC | Sprinkler System |
| 04/30/2025 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 14 heads |
| 04/16/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 03/27/2025 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 03/10/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 12/11/2024 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 08/15/2024 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Permit Issued | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 07/08/2026 | Permit Issued | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 07/01/2026 | Permit Issued | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 06/11/2026 | Permit Issued | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 03/11/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 01/12/2026 | Permit Issued | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 01/07/2026 | Signed-off | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 09/11/2025 | Signed-off | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 09/09/2025 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 04/30/2025 | Signed-off | PREFERRED MECHANICAL INC | Water/Sanitary |
| 03/10/2025 | Signed-off | PSI PLUMBING INC | Water/Sanitary |
| 12/11/2024 | Signed-off | LAB PLBG & HTG CO INC | Water/Sanitary |
| 08/15/2024 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | FRED GELLER ELEC'L INC. | General Wiring |
| 06/22/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 06/08/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 04/27/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 03/26/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/26/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/26/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/26/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/26/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 01/21/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 01/14/2026 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 01/07/2026 | Complete | SCHLESINGER ELECT'L CONTR | General Wiring |
| 11/05/2025 | Permit Issued | PREMIER ELECTRIC, INC | General Wiring |
| 10/14/2025 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 10/02/2025 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/03/2026 | Permit Issued | KING ROSE OF NY, INC | Steel |
| 12/18/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 09/11/2025 | Signed-off | SWINERTON BUILDERS | Steel |
| 09/09/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/27/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 05/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/05/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/01/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/06/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/19/2026 | Lighting controls | Alfonso DElia | energy_progress |
| 08/19/2026 | Energy Code Compliance Inspections | Alfonso DElia | progress |
| 08/19/2026 | Interior lighting power | Alfonso DElia | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Alfonso DElia | special |
| 07/24/2026 | Final | Alfonso DElia | progress |
| 07/09/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 07/09/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| 07/07/2026 | High-Pressure Steam Piping (Welding) | James Sullivan Jr | special |
| 07/07/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 07/06/2026 | Final | James Sullivan Jr | progress |
| 07/06/2026 | Mechanical Systems | James Sullivan Jr | special |
| 06/22/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 05/22/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 05/22/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 05/22/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 05/22/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 04/01/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 04/01/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 04/01/2026 | Exhaust and Vent Systems in Plenums and Ducts | ALEXIS SCHLESSINGERMAN | special |
| 03/31/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Lenovo | Office | Floors 42, 45 | Project M01208221 Project M01207671 |
| Lenovo | Office | Floor 42 | Project M01244160 |
| Crunch Fitness | Fitness / Recreation | Floor 1 | Project M01148548 |
| Morningstar Red Cube | Office | Floor 43 | Project M01091533 |
| Brown Brothers Harriman | Office | Cellar, Ground, Floors 1–3, 8 | Project M00958721 Project M00911864 Project M00915825 Project M00911876 Project M00915820 Project M00922918 Project M00885633 Project M00894060 Project M00895477 Project M00896269 Project M00645740 Project M00591261 |
| Labaton Sucharow | Office | Floors 23, 33, 34 | Project M00820796 |
| Bank of Japan | Office | Floor 22 | Project M00707965 |
| Canopius | Office | Floor 22 | Project M00612273 Project M00612297 |
| The Wallace Foundation | Office | Floor 49 | Project M00208308 |