| Owner | Filings | Most Recent |
|---|---|---|
| MOUNT SINAI HOSPITAL | 301 | 07/08/2026 |
| RELATED SERVICES | 4 | 07/08/2026 |
| MOUNT SINAI HEALTH SYSTEM | 13 | 07/08/2026 |
| MOUNT SINAI HOSPITAL 1 | 1 | 03/22/2026 |
| MT SINAIA HOSPITAL | 19 | 03/22/2026 |
| MT. SINAL HOSPITAL | 2 | 03/22/2026 |
| NT SINAI HOSPITAL | 1 | 03/22/2026 |
| 1190 5 AVE | 5 | 03/22/2026 |
| 1170 5 AVE | 1 | 03/22/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LORING CONSULTING ENGINEERS, INC. | 29 | 08/11/2026 |
| EFH ARCHITECTURE | 19 | 08/11/2026 |
| CALLISONRTKL ARCHITECTS, P.C. | 2 | 08/03/2026 |
| R.G. VANDERWEIL ENGINEERS, PC | 79 | 06/09/2026 |
| PERKINS EASTMAN | 3 | 03/28/2026 |
| SEVERUD ASSOCIATES | 3 | 03/28/2026 |
| SALVATOR A. CARADONNA JR. | 1 | 11/25/2025 |
| STUDIO A+T ARCHITECTS | 8 | 11/24/2025 |
| BRAND ACCESS SOLUTIONS | 2 | 09/22/2025 |
| EWINGCOLE | 3 | 08/21/2025 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 03/14/2025 |
| AKF ENGINEERS, LLP | 3 | 10/09/2024 |
| BURNS ENGINEERING, PC | 1 | 09/30/2024 |
| EP ENGINEERING LLC | 2 | 05/14/2024 |
| SIMPLE ARCHITECTURE PC | 3 | 04/09/2024 |
| ARIANNA BRAUN ARCHITECTS, PLLC | 4 | 04/01/2024 |
| LILKER ASSOCIATES CONSULTING ENGINE | 5 | 02/22/2024 |
| MOSTAFA OSMAN | 3 | 01/05/2024 |
| MATIZ ARCHITECTURE AND DESIGN | 1 | 07/20/2021 |
| SAFWAY ATLANTIC LLC | 3 | 08/21/2020 |
| ADVANCED ENGINEERING & INSPECT. PLL | 1 | 08/02/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 82 | 03/21/2026 |
| GIG EXPEDITING | 24 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 10 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| SIMPLE ARCHITECTURE | 4 | 03/21/2026 |
| METROPOLIS GROUP INC | 12 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 2 | 03/21/2026 |
| SME PROFESSIONAL DESIGN & CONSULTAN | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HUNTER ROBERTS CONSTRUCTION | General Contractor | 63 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 26 | 08/08/2026 |
| UNITY CONSTR. SVCS INC | General Contractor | 26 | 07/08/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 18 | 07/08/2026 |
| J & N REMODELING INC | General Contractor | 15 | 07/08/2026 |
| CONSIGLI CONSTRUCTION CO | General Contractor | 15 | 08/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 14 | 07/08/2026 |
| CURRENT FIRE PROTECTION INC | Fire Protection | 11 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 10 | 07/22/2026 |
| CAULDWELL WINGATE CO LLC | General Contractor | 8 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 7 | 07/08/2026 |
| AMF MECHANICAL SYSTEMS CO | General Contractor | 6 | 03/21/2026 |
| PSI PLUMBING INC | Plumbing | 5 | 07/08/2026 |
| MED-TEK CONTRACTING INC | General Contractor | 4 | 03/21/2026 |
| LITESPEED ELECTRIC, INC | Electrical | 4 | 03/22/2026 |
| PAUL M MAINTENANCE INC | General Contractor | 4 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 3 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 3 | 07/08/2026 |
| INTERBORO SIGN ELECL MAI | Scaffold | 2 | 07/04/2026 |
| HEMSING, ROBERT | Electrical | 2 | 03/21/2026 |
| NJS ELEC'L SERVICES CORP. | Electrical | 2 | 03/22/2026 |
| SHORT, HENRY | Electrical | 2 | 03/21/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 2 | 06/28/2026 |
| KING ROSE OF NY, INC | General Contractor | 2 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 123 | 08/11/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 24 | 08/03/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | B&A RESTORATION CONTR.INC | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/07/2026 |
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 08/07/2026 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/06/2026 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 07/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CONSIGLI CONSTRUCTION CO | 07/06/2026 |
| DOB NOW | General Construction | Signed-off | CONSIGLI CONSTRUCTION CO | 06/10/2026 |
| DOB NOW | Structural | Signed-off | CONSIGLI CONSTRUCTION CO | 06/10/2026 |
| DOB NOW | Sign | Signed-off | INTERBORO SIGN &ELECL MAI | 06/01/2026 |
| DOB NOW | Plumbing | Signed-off | ALLIANCE PLUMBING CORP | 04/24/2026 |
| DOB NOW | Plumbing | Permit Issued | CARDOZA PLUMBING WMBE | 04/03/2026 |
| DOB NOW | Plumbing | Signed-off | PSI PLUMBING INC | 03/11/2026 |
| DOB NOW | Sprinklers | Signed-off | ABSOLUTE SPECIAL INSPTN | 02/27/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PAUL M MAINTENANCE INC | 02/18/2026 |
| DOB NOW | General Construction | Signed-off | PAUL M MAINTENANCE INC | 02/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 12/19/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 12/10/2025 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 12/10/2025 |
| DOB NOW | Plumbing | Signed-off | PSI PLUMBING INC | 12/04/2025 |
| DOB NOW | Sign | Signed-off | INTERBORO SIGN &ELECL MAI | 11/28/2025 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 11/20/2025 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 11/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 11/20/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 11/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 11/19/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 11/18/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 11/18/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 11/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 11/12/2025 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 11/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 11/07/2025 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 11/07/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 10/29/2025 |
| DOB NOW | Plumbing | Permit Issued | CARDOZA PLUMBING WMBE | 10/07/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | SAFWAY ATLANTIC, LLC | 09/23/2025 |
| DOB NOW | Supported Scaffold | Signed-off | SAFWAY ATLANTIC, LLC | 09/22/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 09/04/2025 |
| DOB NOW | General Construction | Signed-off | HUNTER ROBERTS CONSTRUCTION | 09/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HUNTER ROBERTS CONSTRUCTION | 09/04/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/11/2026 | Signed-off | CONSIGLI CONSTRUCTION CO | Generators, Ventilation Systems | |
| 03/28/2026 | Permit Issued | CONSIGLI CONSTRUCTION CO | Air Conditioning Systems | Cooling Multiaqua MHQWW-12 7,000 BTU · Fan Coil Indoor ×2 MHQWW-36-H-1 26,400 BTU · Fan Coil Indoor ×2 MHCFC4W 39,400 BTU · Fan Coil Indoor ×1 MHCFC4W-08 16,400 BTU · Fan Coil Indoor ×1 MHCFC4W-16 39,400 BTU · Fan Coil Indoor ×1 |
| 12/01/2025 | Signed-off | CAULDWELL WINGATE CO LLC | Ventilation Systems | Ventilation Titus EZTS Vav Box ×6 |
| 11/26/2025 | Signed-off | PAUL M MAINTENANCE INC | Ventilation Systems | — |
| 10/29/2025 | Permit Issued | CONSIGLI CONSTRUCTION CO | Others | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | RAEL AUTOMATIC SPR.CO INC | 43 heads |
| 08/03/2026 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 06/09/2026 | Signed-off | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 03/28/2026 | Permit Issued | SIRINA FIRE PROT CORP | Sprinkler System |
| 12/01/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | 31 heads |
| 11/26/2025 | Signed-off | ABSOLUTE SPECIAL INSPTN | 45 heads |
| 09/30/2024 | Permit Issued | SIRINA FIRE PROT CORP | 1,387 heads |
| 04/15/2024 | Signed-off | AGGRESSIVE FIRE PROT LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | CARDOZA PLUMBING WMBE | Medical Gas, Water/Sanitary |
| 08/03/2026 | Permit Issued | CARDOZA PLUMBING WMBE | Water/Sanitary |
| 06/09/2026 | Signed-off | CARDOZA PLUMBING CORP | Medical Gas, Water/Sanitary |
| 03/28/2026 | Permit Issued | CARDOZA PLUMBING CORP | Medical Gas, Water/Sanitary |
| 12/01/2025 | Signed-off | CARDOZA PLUMBING CORP | Medical Gas, Water/Sanitary |
| 11/26/2025 | Signed-off | PSI PLUMBING INC | Medical Gas, Water/Sanitary |
| 04/15/2024 | Signed-off | ALLIANCE PLUMBING CORP | Medical Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | RIGID ELECTRIC, INC. | General Wiring |
| 08/25/2026 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 06/18/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 06/08/2026 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 05/20/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 05/15/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 03/19/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/24/2026 | Complete | DIANE ELECTRIC INC. | General Wiring |
| 02/09/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 01/16/2026 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 01/16/2026 | Permit Issued | PROFF ELECTRICAL LLC | General Wiring |
| 12/08/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | — |
| 12/02/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 09/29/2025 | Permit Issued | NJS ELEC'L SERVICES CORP. | General Wiring |
| 09/22/2025 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Signed-off | CONSIGLI CONSTRUCTION CO | Steel |
| 06/09/2026 | Signed-off | CARDOZA PLUMBING CORP | Steel |
| 03/28/2026 | Permit Issued | CARDOZA PLUMBING CORP | Steel |
| 12/01/2025 | Signed-off | CARDOZA PLUMBING CORP | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2025 | Signed-off | SAFWAY ATLANTIC, LLC | Scaffold, Sidewalk Shed |
| 08/21/2020 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| 04/17/2020 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| 08/02/2019 | Permit Issued | RELATED SERVICES LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Permit Issued | B&A RESTORATION CONTR.INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/22/2026 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 07/22/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 07/22/2026 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 07/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/29/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/10/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/20/2026 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 08/12/2026 | Final | JONAR MADRIAGA | progress |
| 08/03/2026 | Final | JONAR MADRIAGA | progress |
| 08/03/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 06/12/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/12/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/12/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 03/06/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Electrical motors and elevators | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 03/06/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 03/06/2026 | Ventilation and air distribution system | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Structural Steel - Welding | JONAR MADRIAGA | special |
| 03/06/2026 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Structural Steel - High Strength Bolting | JONAR MADRIAGA | special |
| 03/06/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | Structural Steel - Details | JONAR MADRIAGA | special |
| 03/06/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 03/06/2026 | Structural Stability – Alterations of existing buildings | JONAR MADRIAGA | special |
| 03/06/2026 | Maintenance information | JONAR MADRIAGA | energy_progress |
| 03/06/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 02/20/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mount Sinai MEDICAL CENTER | Medical / Healthcare | Floor 6 | Project M00992891 |
| Gp1 Interventional Cardiology | Medical / Healthcare | Sub-basement, Basement, Floor 1 | Project M00767781 |
| Mount Sinai A.I. & Human Health | Laboratory | Floor 11 | Project M00552437 Project M00552481 |