💬 Discuss this project
1910Year Built
12Stories
D4Building Class
C6-3XZoning
127,000 sfGross Floor Area
107Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered ▸FISP: SAFE
Elevator cooperative · Owner of record: 148 W 23 St Owners · 10,097 sf lot · 12.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSkylight protection4p · 1 filing · 3 docs
Floor 12Unit 12F, Unit 12KUnder Construction17p · 3 filings · 20 docs
Floor 11Unit 11A5p · 2 filings · 18 docs
Floor 10
Floor 9
Floor 8Unit 8A5p · 2 filings · 10 docs
Floor 7Unit 7A8p · 2 filings · 20 docs
Floor 6
Floor 5Unit 5A6p · 1 filing · 6 docs
Floor 4Unit 4C, Unit 4F7p · 2 filings · 20 docs
Floor 3
Floor 2Unit 2A, Unit 2HJ22p · 5 filings · 20 docs
Floor 1Unit 1B, Unit 1G6p · 3 filings · 20 docs
Mezzanine1p · 1 filing · 15 docs
Cellar6p · 3 filings · 20 docs
Site & exteriorSidewalk shed installation11p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
148 West 23rd Street Owners7503/21/2026
148 W 23 St Owners1703/22/2026
148 West 23nd Owners903/21/2026
Danny Forster Design Studio603/21/2026
Danny Forster & Architecture503/22/2026
148 W 23R203/21/2026
148 West 2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Falcon Associates207/02/2026
MW Professional Engineering311/10/2025
Wei Studio209/24/2025
Yao W Guo Architect1202/13/2025
Mostafa Osman212/21/2023
EP Engineering112/21/2023
Ronnette Riley Architect310/24/2023
J&R Design and Inspection402/07/2023
Glenn Fulk AIA202/09/2022
Pulltab Design109/14/2021
Enthink Engineers306/19/2021
Ashraf105/10/2021
Jack Green Associates202/01/2021
Baileys Engineering102/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Light Expediting503/21/2026
Socotec603/21/2026
Resolution Expediting403/21/2026
High Quality 338803/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold1507/08/2026
Andamio ScaffoldingScaffold807/08/2026
Rite Way ConstructionGeneral Contractor407/08/2026
LaileGeneral Contractor403/21/2026
AFA ConstructionGeneral Contractor307/08/2026
KBRNYGeneral Contractor304/09/2026
MK Construction GroupGeneral Contractor303/21/2026
Rugova GroupPlumbing207/08/2026
Delta Power ElectricalElectrical203/22/2026
G-NadoGeneral Contractor203/21/2026
High Quality ConstructionGeneral Contractor203/21/2026
Quality Building ConstrutionGeneral Contractor203/21/2026
American Standard P&H CororpPlumbing207/08/2026
Aranda Plumbing & HeatingPlumbing207/08/2026
CK Plumbing & MechanicalPlumbing207/08/2026
NYC Plumbing & HeatingPlumbing207/08/2026
MSV BuildersGeneral Contractor108/07/2026
Cosme Plumbing & HeatingPlumbing107/08/2026
AL-Wes Electric ServicesElectrical103/21/2026
Schwartz Electric ContractorsElectrical103/21/2026
Century Electric CoElectrical103/22/2026
A & E PlumbingPlumbing107/08/2026
Amsterdam ElectricElectrical103/22/2026
Power Surge ElectricElectrical103/21/2026
AmokPlumbing107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
Jtonic Design & ConstructionGeneral Contractor104/09/2026
KJK ElectricElectrical103/22/2026
J.M.C. ElectricalElectrical103/21/2026
Lights by Jay ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Falcon Engineering Co5649207/02/2026
Green River Environmental7841107/02/2026
Wei Studio7998209/24/2025
MW Professional Engineering570106/25/2025
EP Inspections and Commis7079212/21/2023
Yao W Guo Architect1754707/26/2023
Jack Green Associates422106/20/2023
J&R Design and Inspection6637402/07/2023
Building Lifecycle
All (267)Filed (39)Permit Issued (43)Signed Off (15)Facade (FISP) (15)Violation (36)Inspection (23)Objection (66)Special Inspection (30)
10/21/2026
Signed off — Alteration
INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 1) UNIT 1G PROPOSED. REMOVE AND INSTALL NON-BEARING PARTITIONS, INSTALL MINI-SPLIT AIR CONDITIONING UNIT. NO CHANGE OF USE AND OCCUPANCY UNDER THIS APPLICATION.
M01289410-I1
09/16/2026
Signed off — Alteration
INTERIOR FIT-OUT OF EXISTING RESIDENTIAL UNIT 1G PROPOSED. INSTALL NEW PLUMBING FIXTURES. NO CHANGE OF USE AND OCCUPANCY UNDER THIS APPLICATION.
M01289413-I1
08/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/14/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/06/2026
Permit issued — General Construction
M01419809-I1-GC
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Scope
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/02/2026
Filed — Alteration
Installation of new VRF system to serve existing single family residence. Installation of 3 new wall units and 1 new outdoor condensing unit with associated refrigerant piping and electrical conduit. Condensate piping to route condensate to exterior roof.
M01419809-S1
07/02/2026
Filed — Alteration
Installation of new VRF system to serve existing single family residence. Installation of 3 new wall units and 1 new outdoor condensing unit with associated refrigerant piping and electrical conduit. Condensate piping to route condensate to exterior roof.
M01419809-I1
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD HAHN
07/02/2026
Special inspection requirement — Fenestration air leakage
Neeraj Chander
07/02/2026
Special inspection requirement — Insulation placement and R values
Neeraj Chander
07/02/2026
Special inspection requirement — Fenestration areas
Neeraj Chander
07/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Neeraj Chander
07/02/2026
Special inspection requirement — Air barrier - visual inspection
Neeraj Chander
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD HAHN
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Volpe
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
ROBERT MASONE
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Neeraj Chander
07/01/2026
Special inspection requirement — Final
RICHARD HAHN
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Volpe
07/01/2026
Special inspection requirement — Mechanical Systems
RICHARD HAHN
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Neeraj Chander
06/19/2026
Special inspection requirement — Final
Neeraj Chander
04/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Permit issued — Mechanical Systems
M01289410-I1-GC-CX
01/27/2026
Permit issued — Plumbing
M01289413-I1-PL
12/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Filed — Alteration
Plumbing work in conjunction to apt 2HJ renovation. No change in use, egress and occupancy
M01246524-P1
11/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Cost
10/20/2025
Objection raised — Scope
10/09/2025
Objection raised — Plumbing
10/09/2025
Objection raised — Scope
09/24/2025
Filed — Alteration
INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 1) UNIT 1G PROPOSED. REMOVE AND INSTALL NON-BEARING PARTITIONS, INSTALL MINI-SPLIT AIR CONDITIONING UNIT. NO CHANGE OF USE AND OCCUPANCY UNDER THIS APPLICATION.
M01289410-I1
09/23/2025
Filed — Alteration
INTERIOR FIT-OUT OF EXISTING RESIDENTIAL UNIT 1G PROPOSED. INSTALL NEW PLUMBING FIXTURES. NO CHANGE OF USE AND OCCUPANCY UNDER THIS APPLICATION.
M01289413-I1
09/22/2025
Special inspection requirement — Lighting controls
Ruoyu Wei
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ruoyu Wei
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Ruoyu Wei
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruoyu Wei
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMSV Builders08/06/2026
DOB NOWMechanical SystemsSigned-offJtonic Design & Construction01/27/2026
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp01/27/2026
DOB NOWGeneral ConstructionPermit IssuedLaile07/24/2025
DOB NOWPlumbingSigned-offNYC Plumbing & Heating07/24/2025
DOB NOWPlumbingSigned-offA & E Plumbing05/22/2025
DOB NOWGeneral ConstructionPermit IssuedKBRNY05/02/2025
DOB NOWGeneral ConstructionPermit IssuedKBRNY03/24/2025
DOB NOWPlumbingPermit IssuedCosme Plumbing & Heating03/06/2024
DOB NOWPlumbingSigned-offNYC Plumbing & Heating11/06/2023
DOB NOWGeneral ConstructionSigned-offLaile10/19/2023
DOB NOWPlumbingSigned-offAranda Plumbing & Heating04/27/2023
DOB NOWGeneral ConstructionPermit IssuedAFA Construction04/17/2023
DOB NOWPlumbingSigned-offAmok02/02/2023
DOB NOWGeneral ConstructionSigned-offG-Nado01/24/2023
DOB NOWGeneral ConstructionSigned-offRite Way Construction01/11/2023
DOB NOWPlumbingSigned-offAranda Plumbing & Heating01/09/2023
DOB NOWGeneral ConstructionSigned-offRite Way Construction01/06/2023
DOB NOWGeneral ConstructionPermit IssuedAFA Construction11/09/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/12/2022
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction06/23/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp06/23/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating05/02/2022
DOB NOWGeneral ConstructionSigned-offQuality Building Construt01/19/2022
DOB NOWGeneral ConstructionSigned-offMK Construction Group01/04/2022
DOB NOWPlumbingSigned-offRugova Group12/08/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/20/2021
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding09/14/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/13/2021
DOB NOWProtection and Mechanical MethodsSigned-offEverest Scaffolding05/11/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/30/2021
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical02/19/2021
DOB NOWPlumbingSigned-offRugova Group10/28/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding04/02/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/01/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/21/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding02/11/2020
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical01/31/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/21/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding02/19/2019
+ 53 more permits on file
3 projects · most recent 07/02/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Permit IssuedMSV BuildersHeating and Air Conditioning Systems—
09/24/2025Signed-offJtonic Design & ConstructionAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-2D20NL 24,000 BTU · Condensing Unit ×1
MXZ-34D30NL 28,600 BTU · Condensing Unit ×1
12/21/2023——Air Conditioning Systems
Cooling
Trane NTXMMX36A142AA 35,400 BTU · Condensing Unit ×1
5 projects · most recent 11/10/2025
Water/Sanitary Gas
FiledStatusContractorScope
11/10/2025Signed-offNYC Plumbing & HeatingGas, Water/Sanitary
09/23/2025Signed-offAmerican Standard P&HWater/Sanitary
02/13/2025Signed-offLeema Plumbing & HeatingGas, Water/Sanitary
12/21/2023Permit IssuedCosme Plumbing & HeatingGas
10/05/2022Signed-offAranda Plumbing & HeatingWater/Sanitary
23 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteKJK ElectricGeneral Wiring
02/02/2026Permit IssuedUnited Electrical Cont'gGeneral Wiring
06/02/2025CompleteAmsterdam ElectricGeneral Wiring
05/22/2025CompleteLens Electric—
02/24/2025CompleteCentury ElectricGeneral Wiring
04/25/2024CompleteKJK ElectricGeneral Wiring
02/26/2024Permit IssuedMac Elect'l ContractingGeneral Wiring
01/18/2024CompleteDelta Power ElectricalGeneral Wiring
11/14/2022CompleteRamdeen's Electric ContractingGeneral Wiring
11/10/2022Permit IssuedVillage Electl ContractorsGeneral Wiring
09/21/2022CompleteE & M Electrical NYGeneral Wiring
07/14/2022Permit IssuedKJK ElectricGeneral Wiring
07/05/2022CompleteVillage Electl ContractorsGeneral Wiring
02/16/2022Permit IssuedBruni ElectricGeneral Wiring
01/02/2022CompleteDelta Power ElectricalGeneral Wiring
1 project · most recent 10/05/2022
FiledStatusContractorScope
10/05/2022Permit IssuedAFA Construction1 scope_items
2 projects · most recent 11/10/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/10/2025Signed-offNYC Plumbing & HeatingTenant Protection Plan 72 Hour
09/24/2025Signed-offJtonic Design & ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
08/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
07/02/2026Insulation placement and R valuesNeeraj Chanderenergy_progress
07/02/2026Fenestration air leakageNeeraj Chanderenergy_progress
07/02/2026Air barrier - visual inspectionNeeraj Chanderenergy_progress
07/02/2026Fenestration areasNeeraj Chanderenergy_progress
07/02/2026Fenestration and door U-factor and product ratingsNeeraj Chanderenergy_progress
07/02/2026Energy Code Compliance InspectionsRICHARD HAHNprogress
07/02/2026Fire-Resistant Penetrations and JointsRICHARD HAHNspecial
07/01/2026Fire-Resistance Rated ConstructionNeeraj Chanderprogress
07/01/2026Mechanical SystemsRICHARD HAHNspecial
07/01/2026Energy Code Compliance InspectionsNeeraj Chanderprogress
07/01/2026Tenant Protection Plan ComplianceROBERT MASONEspecial
07/01/2026Structural Stability – Alterations of existing buildingsAnthony Volpespecial
07/01/2026Fire-Resistant Penetrations and JointsAnthony Volpespecial
07/01/2026FinalRICHARD HAHNprogress
06/19/2026FinalNeeraj Chanderprogress
09/22/2025Lighting controlsRuoyu Weienergy_progress
09/22/2025Fire-Resistant Penetrations and JointsRuoyu Weispecial
09/22/2025Tenant Protection Plan ComplianceRuoyu Weispecial
09/22/2025Energy Code Compliance InspectionsRuoyu Weiprogress
09/22/2025Interior lighting powerRuoyu Weienergy_progress
09/22/2025HVAC-R and service water piping design and insulationRuoyu Weienergy_progress
09/22/2025HVAC-R and service water heating system controlsRuoyu Weienergy_progress
09/22/2025HVAC-R and service water heating equipmentRuoyu Weienergy_progress
09/18/2025Mechanical SystemsRuoyu Weispecial
09/18/2025FinalRuoyu Weiprogress
Latest 25 of 71.
▾Documents — 840 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch34
09/06/2026M00001466-I1Request digital key ↗
09/03/2026M00518698-I1Request digital key ↗
09/03/2026M00538765-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00283288-P1Request digital key ↗
09/05/2026M00283288-I1Request digital key ↗
09/04/2026M00327323-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00128141-I1Request digital key ↗
▸Applications & Permits144
▸BISPLAN / WORK APPROVAL APPLICATION72
06/21/2023110352939Open ↗
03/21/2023123552299Open ↗
03/15/2023123552299Open ↗
Showing 3 of 72 on file for this type
▸BISWORK PERMIT APPLICATION72
02/09/2023123552299Open ↗
12/29/2021123764578Open ↗
07/13/2021123200838Open ↗
Showing 3 of 72 on file for this type
▸Seals & Professional Certifications197
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
02/03/2020123588885Open ↗
01/31/2020123846561Open ↗
01/27/2020123588885Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/06/2026M00001466-I1Open ↗
09/05/2026M00128141-I1Open ↗
09/05/2026M00283288-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/07/2026M00612911-P2Open ↗
10/07/2026M00612911-P2Open ↗
10/07/2026M00612911-P2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/07/2026M00612911-P2Open ↗
09/02/2026M01289410-I1Open ↗
09/02/2026M01289410-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/04/2020140932766Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/21/2020140937182Open ↗
08/04/2020140932766Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment74
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING26
03/21/2023123552299Open ↗
03/15/2023123552299Open ↗
03/13/2023123552299Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
08/20/2019102627123Open ↗
Showing 1 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
02/08/2023123552299Open ↗
▸BISPLUMBING (PL) SIGNOFF1
08/11/2022123764578Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
09/21/2020140937182Open ↗
11/29/2019123846561Open ↗
06/30/2021140932766Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00327323-P1Open ↗
08/13/2026M00327323-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos70
▸DOB NOWDEP ACP-5: Asbestos Assessment Report35
09/05/2026M00128141-I1Open ↗
09/05/2026M00283288-P1Open ↗
09/05/2026M00283288-I1Open ↗
Showing 3 of 35 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
09/21/2020140937182Open ↗
01/23/2020123846561Open ↗
11/29/2019123846561Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/12/2021140932766Open ↗
▸Energy Compliance72
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
02/03/2020123588885Open ↗
01/24/2020123588885Open ↗
11/29/2019123846561Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS17
10/28/2022140932766Open ↗
05/25/2022140937182Open ↗
03/12/2021123551566Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
10/28/2022140932766Open ↗
05/25/2022140937182Open ↗
11/16/2021123200838Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
12/06/2023123552299Open ↗
08/11/2022123764578Open ↗
11/15/2021123200838Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
12/06/2023123552299Open ↗
08/10/2022123764578Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/04/2020140932766Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/10/2022123764578Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/10/2022123764578Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00612911-I1Open ↗
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY28
07/18/2023110352939Open ↗
02/06/2023103052526Open ↗
10/28/2022140932766Open ↗
Showing 3 of 28 on file for this type
▸BISMECHANICAL SYSTEMS2
12/06/2023123552299Open ↗
07/18/2023110352939Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
08/10/2022123764578Open ↗
11/15/2021123200838Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
02/06/2023103052526Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/15/2021123200838Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
02/13/2024123552299Open ↗
07/19/2023110352939Open ↗
10/31/2022140932766Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFINAL5
12/06/2023123552299Open ↗
07/18/2023110352939Open ↗
08/10/2022123764578Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
12/29/2021123764578Open ↗
03/31/2021123200838Open ↗
09/25/2020123764578Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/03/2020123588885Open ↗
Showing 1 of 4 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership62
▸BISCOST AFFIDAVIT56
10/28/2022140932766Open ↗
10/28/2022140932766Open ↗
10/28/2022140932766Open ↗
Showing 3 of 56 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/12/2024123552299Open ↗
07/18/2023110352939Open ↗
08/10/2022123764578Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
01/31/2020123846561Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms72
▸BISEFILING COVER SHEET28
08/03/2020140932766Open ↗
07/31/2020140932766Open ↗
11/29/2019123846561Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION25
09/27/2022140932766Open ↗
09/27/2022140932766Open ↗
08/10/2021123200838Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM15
02/08/2023123552299Open ↗
07/13/2021123200838Open ↗
01/19/2021123846561Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/21/2020140937182Open ↗
08/04/2020140932766Open ↗
Showing 2 of 4 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type