Roof1p · 1 filing
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of new emergency/standby power generator as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 271 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new boiler system as per plans. No change to use, egress or occupancy.
On file for this project
18 documents
Floor 261 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new boiler system as per plans. No change to use, egress or occupancy.
On file for this project
18 documents
Floor 25
Floor 241 filing · 9 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Replacement of existing exterior terrace fence on the 6th and 24th floors as per plans. No change to use, egress or occupancy.
On file for this project
9 documents
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Floor 114p · 3 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS DURING BUILDING DEMOLITION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
7 documents · 1 drawing sheet
Floor 103p · 2 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Floor 94p · 3 filings · 7 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
7 documents · 1 drawing sheet
Floor 85p · 3 filings · 9 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INTERIOR RENOVATIONS TO 8TH FLOOR CLASSROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 2 drawing sheets
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Floor 73p · 2 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Floor 65p · 5 filings · 14 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Replacement of existing exterior terrace fence on the 6th and 24th floors as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 52p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Exterior supported working and loading platform to be used on the 2nd to 5th floor for loading large Unitized Curtainwall crates to their desired floors. No changes to the use or to the egress.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 42p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Exterior supported working and loading platform to be used on the 2nd to 5th floor for loading large Unitized Curtainwall crates to their desired floors. No changes to the use or to the egress.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 33p · 5 filings · 7 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Exterior supported working and loading platform to be used on the 2nd to 5th floor for loading large Unitized Curtainwall crates to their desired floors. No changes to the use or to the egress.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 22p · 6 filings · 5 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural modifications (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 6 filings on this floor.
Floor 14p · 7 filings · 6 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL BE CANTILEVERED OVER CON ED VAULT & SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Cellar4p · 6 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Underground Plumbing work in conjunction with New Building.
On file for this project
4 documents
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Installation of new boiler system as per plans. No change to use, egress or occupancy.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-Cellar2p · 2 filings
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Underground Plumbing work in conjunction with New Building.
On file for this project
4 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents
Site & exterior12 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
Installation of a temporarily system scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 4 drawing sheets
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING SCHOOL MARQUEE FOR PACE ACADEMIC CENTER - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 6 drawing sheets
Latest 3 of 12 filings on this floor.