Roof2 filings · 4 docs
ArchitectureGeneralPlumbingStructural
Issued Permit Scope
General Construction · Structural
Removal of facade panels at the roof level and reinstallation of aluminum louvers to allow airflow of the mechanical units at the roof level.
On file for this project
4 documents
Replace first floor exterior bearing walls, replace existing first floor roof beams. Filed in conjunction with Alt Type I # 123520243 (126 Madison Avenue)
On file for this project
3 documents
Penthouse7p · 3 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
sprinkler work
On file for this project
5 documents · 3 drawing sheets
plumbing
On file for this project
11 documents · 2 drawing sheets
mechanical work to modify ductwork for revised apartment layout
On file for this project
4 documents · 2 drawing sheets
Floor 562p · 2 filings · 12 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Relocating a branch exhaust duct; duct shall tap back into same riser at higher elevation
On file for this project
5 documents · 2 drawing sheets
General construction associated with the interior renovation of an existing apartment. There is no change to use, egress, or occupancy.
On file for this project
7 documents
Floor 55
Floor 541 filing
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Supported Scaffold
INSTALL TEN (10) HEATING HOT WATER BOILERS PER PLANS. ALL PLUMBING, MECHANICAL AND GENERAL CONSTRUCTION IS FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 535 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
structural work for new mezzanine level and convenience stair
On file for this project
4 documents
sprinkler work
On file for this project
5 documents
plumbing
On file for this project
11 documents
Latest 3 of 5 filings on this floor.
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 471 filing · 4 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Plumbing work associated with the interior renovation of an existing apartment.
On file for this project
4 documents
Floor 46
Floor 451 filing · 5 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
APPLICATION FILING FOR GENERAL CONSTRUCTION WORK AT APARTMENT 45-B. REMOVAL OF NON LOAD BEARING WALL, CLOSET AND MILLWORK. CONSTRUCT A NEW NON STRUCTURAL WALL OF GLASS AND METAL AND CLOSET. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 351p · 1 filing · 7 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
INTERIOR RENOVATION OF EXISTING APARTMENT 35B ON 35TH FLOOR. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this project
7 documents · 1 drawing sheet
Floor 34
Floor 33
Floor 321 filing · 2 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
Architectural changes on the 32nd floor (apt. 32C) as indicated on drawings.
On file for this project
2 documents
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 2 filings · 10 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
plumbing work to replace gas fireplace on existing roughing
On file for this project
7 documents · 2 drawing sheets
Remove/cap plumbing fixtures, remove/cap sprinkler fixtures connected to domestic water, remove/cap gas piping and gas fixtures during alteration of existing 5 story building (126 Madison Avenue) to remove floors 2,3,4 & 5 filed under Alt I # 123520243.
On file for this project
3 documents
Floor 42p · 2 filings · 3 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Remove/cap plumbing fixtures, remove/cap sprinkler fixtures connected to domestic water, remove/cap gas piping and gas fixtures during alteration of existing 5 story building (126 Madison Avenue) to remove floors 2,3,4 & 5 filed under Alt I # 123520243.
On file for this project
3 documents
Installation of temporary supported scaffold construction equipment as per plans filed herewith.
On file for this project
26 documents · 2 drawing sheets
Floor 34 filings · 5 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing · Supported Scaffold
Remove/cap plumbing fixtures, remove/cap sprinkler fixtures connected to domestic water, remove/cap gas piping and gas fixtures during alteration of existing 5 story building (126 Madison Avenue) to remove floors 2,3,4 & 5 filed under Alt I # 123520243.
On file for this project
3 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Installation of temporary supported scaffold construction equipment as per plans filed herewith.
On file for this project
26 documents
Latest 3 of 4 filings on this floor.
Floor 24 filings · 5 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Supported Scaffold
Remove/cap plumbing fixtures, remove/cap sprinkler fixtures connected to domestic water, remove/cap gas piping and gas fixtures during alteration of existing 5 story building (126 Madison Avenue) to remove floors 2,3,4 & 5 filed under Alt I # 123520243.
On file for this project
3 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Installation of temporary supported scaffold construction equipment as per plans filed herewith.
On file for this project
26 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction14p · 10 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Mechanical modifications to the existing system. No change in use, egress or occupancy.
On file for this project
6 documents
sprinkler/standpipe work for retail buildout for Hastens on cellar & 1st floor (aka 132 Madison Avenue)
On file for this project
5 documents · 1 drawing sheet
Plumbing work for retail buildout for Hastens on cellar & 1st floor (aka 132 Madison Avenue)
On file for this project
5 documents · 4 drawing sheets
Latest 3 of 10 filings on this floor.
Mezzanine3p · 3 filings · 19 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
structural work for new mezzanine level and convenience stair
On file for this project
4 documents · 1 drawing sheet
sprinkler work
On file for this project
5 documents
general construction
On file for this project
10 documents · 2 drawing sheets
CellarUnder Construction15p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Support of Excavation
Mechanical modifications to the existing system. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
sprinkler/standpipe work for retail buildout for Hastens on cellar & 1st floor (aka 132 Madison Avenue)
On file for this project
5 documents · 2 drawing sheets
Plumbing work for retail buildout for Hastens on cellar & 1st floor (aka 132 Madison Avenue)
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 10 filings on this floor.
Site & exterior14 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
ERECT NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, NO CHANGE TO USE, EGRESS OR OCCUPATION
On file for this project
3 documents · 2 drawing sheets
ERECT NON-ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-B, NO CHANGE TO USE, EGRESS OR OCCUPATION
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 4 drawing sheets
Latest 3 of 14 filings on this floor.