| Owner | Filings | Most Recent |
|---|---|---|
| 69TH TENANTS | 400 | 09/23/2026 |
| FIRST SERVICE RESIDENTIAL | 20 | 07/08/2026 |
| 679TH TENANTS | 86 | 07/08/2026 |
| EBMG | 11 | 07/08/2026 |
| 69 STREET TENANTS | 27 | 07/08/2026 |
| CVS HEALTH | 3 | 07/08/2026 |
| JANOVIC PAINT & DECORATING | 5 | 03/22/2026 |
| HERBET ROSE INC | 14 | 03/22/2026 |
| 69TH TENANTS CORP/CHARLES | 12 | 03/22/2026 |
| LYTER GROUP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALTERARC ARCHITECTURE PLLC | 11 | 08/24/2026 |
| MERRITT ENGINEERING CONSULTANTS, DPC | 3 | 08/24/2026 |
| NIZA WORKS OF ARCHITECTURE PLLC | 6 | 08/21/2026 |
| RM ARCHITECT, PC | 2 | 08/05/2026 |
| EMPORIUM DESIGN LLC | 11 | 06/19/2026 |
| STEVEN MICHAEL PETERSON STUDIOS | 5 | 06/16/2026 |
| CHRISTOPHER CARSON, ARCHITECT | 2 | 06/03/2026 |
| ASHRAF CORP | 1 | 05/27/2026 |
| A2 ARCHITECT, PC | 47 | 05/08/2026 |
| DEFONSECA ARCHITECTS | 2 | 04/27/2026 |
| EMTG CONSULTANTS INC | 3 | 04/22/2026 |
| TIMOTHY LANGAN ARCHITECT | 2 | 02/12/2026 |
| JOCK DEBOER, AIA | 9 | 01/29/2026 |
| JONATHAN B. HELD AIA ARCHITECT | 5 | 11/22/2025 |
| NDKAZALAS ARCHITECTURE P.C. | 4 | 11/21/2025 |
| JMV CONSULTING ENGINEERING | 5 | 11/20/2025 |
| THE NEW BLACK ARCHITECTURE & DESIGN | 4 | 10/29/2025 |
| ACHESON DOYLE PARTNERS ARCHITECTS | 1 | 08/29/2025 |
| THOMAS W HUT ARCHITECT PLLC | 2 | 08/06/2025 |
| FARHAD BASSIRI-TEHRANI | 4 | 06/07/2025 |
| STUDIO C ARCHITECTS, PLLC | 1 | 03/12/2025 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 7 | 02/28/2025 |
| WELLS ENGINEERING, PLLC | 1 | 12/17/2024 |
| ARQUITECTURA VARELA | 4 | 12/03/2024 |
| GMH ARCHITECTURE PLLC | 4 | 10/29/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| J A EXPEDITING | 86 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 10 | 03/21/2026 |
| A+ EXPEDITING | 18 | 03/21/2026 |
| CODE | 12 | 03/21/2026 |
| KX CONSULTING | 8 | 03/21/2026 |
| COMBINED ARCHITECTURE DPC | 3 | 03/21/2026 |
| JM ZONING, LLC. | 30 | 03/21/2026 |
| ECDESIGN STUDIO | 8 | 03/21/2026 |
| CUBE DESIGN BUILD MANAGEMENT | 6 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J.G.M. DECORATING INC | General Contractor | 31 | 07/08/2026 |
| ONE TEN GROUP INC | General Contractor | 21 | 08/30/2026 |
| ASA BUILDING MAINT INC | General Contractor | 16 | 07/08/2026 |
| DEBONO BROS. BUILDERS & D | General Contractor | 13 | 09/18/2026 |
| FIVE STAR P&H CO,INC | Plumbing | 11 | 07/08/2026 |
| ZFM INC | Plumbing | 11 | 07/08/2026 |
| DYNAMIC BLUE WATER MECH | Plumbing | 11 | 08/21/2026 |
| DARTOM CABINETRY CORP | General Contractor | 8 | 07/08/2026 |
| MBQ CONTRACTING CORP | General Contractor | 7 | 07/08/2026 |
| LEWIS CONSTRUCTION NYC IN | General Contractor | 6 | 07/08/2026 |
| KALE CONSTRUCTION INC | General Contractor | 6 | 03/21/2026 |
| SJB INTERIORS INC | General Contractor | 6 | 09/22/2026 |
| CGR SYSTEMS MANAGEMENT | General Contractor | 6 | 03/21/2026 |
| L & N CONSTRUCTION INTERI | General Contractor | 4 | 07/08/2026 |
| GREAT BAY CONTRACTING INC | General Contractor | 4 | 07/03/2026 |
| LANDMARK CONTRACTING CORP. | General Contractor | 4 | 07/08/2026 |
| FORTE CONSTRUCTION CORP | General Contractor | 4 | 07/08/2026 |
| HYDROKINETIC PLBG & HTG I | Plumbing | 4 | 07/08/2026 |
| MWB ELECTRIC CORP. | Electrical | 4 | 03/22/2026 |
| FIVE STAR P AND H CO, INC | Plumbing | 4 | 09/23/2026 |
| K & G ELECTRIC CO., INC. | Electrical | 3 | 03/22/2026 |
| RENOVATION BY MY HOME INC | General Contractor | 3 | 07/08/2026 |
| RUN RITE MECHANICAL CORP | General Contractor | 3 | 03/21/2026 |
| A.J.'S CUSTOM HOME IMPROV | General Contractor | 3 | 03/21/2026 |
| EMPIRE BUILDERS & MAINT | General Contractor | 3 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MERRITT ENGINEERING CONSU | 460 | 3 | 08/24/2026 |
| NIZA WORKS OF ARCH PLLC | 6101 | 6 | 08/21/2026 |
| COMPLY BUILDING GROUP | 8622 | 2 | 08/05/2026 |
| STEVEN MICHAEL PETERSON S | 2035 | 6 | 06/16/2026 |
| AMKA & ASSOCIATES LLC | 8239 | 2 | 06/03/2026 |
| A2 ARCHITECT, PC | 2504 | 36 | 05/08/2026 |
| EMTG CONSULTANTS | 4222 | 2 | 04/22/2026 |
| MB INSPECTIONS, CORP. | 8703 | 1 | 02/12/2026 |
| JOCK DEBOER, AIA - SIA | 7008 | 9 | 01/29/2026 |
| CONCRETE SOLUTIONS LAB CO | 5344 | 3 | 11/21/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | FIVE STAR P AND H CO, INC | 09/22/2026 |
| DOB NOW | General Construction | Permit Issued | SJB INTERIORS INC | 09/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DEBONO BROS. BUILDERS & D | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | ONE TEN GROUP INC | 08/27/2026 |
| DOB NOW | Plumbing | Permit Issued | DYNAMIC BLUE WATER MECH | 08/21/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 08/21/2026 |
| DOB NOW | General Construction | Permit Issued | ONE TEN GROUP INC | 08/18/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 08/12/2026 |
| DOB NOW | Plumbing | Permit Issued | CATALANO PLBG & HTG INC | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | P & P CONSTR & PAINTING | 07/17/2026 |
| DOB NOW | General Construction | Permit Issued | GREAT BAY CONTRACTING INC | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | GREAT BAY CONTRACTING INC | 07/01/2026 |
| DOB NOW | Plumbing | Permit Issued | DYNAMIC BLUE WATER MECH | 06/24/2026 |
| DOB NOW | Plumbing | Permit Issued | ALAFOGIANNIS PLBG & HTG | 06/15/2026 |
| DOB NOW | General Construction | Permit Issued | ONE TEN GROUP INC | 06/11/2026 |
| DOB NOW | Plumbing | Permit Issued | DYNAMIC BLUE WATER MECH | 06/09/2026 |
| DOB NOW | General Construction | Permit Issued | GREAT BAY CONTRACTING INC | 05/29/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 05/28/2026 |
| DOB NOW | General Construction | Signed-off | DEBONO BROS. BUILDERS & D | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | HERBERT ROSE INC | 05/13/2026 |
| DOB NOW | General Construction | Permit Issued | ONE TEN GROUP INC | 04/28/2026 |
| DOB NOW | Plumbing | Permit Issued | ALAFOGIANNIS PLBG & HTG | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | GREAT BAY CONTRACTING INC | 04/20/2026 |
| DOB NOW | Plumbing | Permit Issued | ZFM INC | 04/16/2026 |
| DOB NOW | Plumbing | Permit Issued | HYDROKINETIC PLBG & HTG I | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | ASA BUILDING MAINT | 04/01/2026 |
| DOB NOW | Plumbing | Permit Issued | ZEFI MECHANICAL INC | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | ASA BUILDING MAINT | 03/18/2026 |
| DOB NOW | General Construction | Signed-off | BOBBY J ENTERPRISE | 03/10/2026 |
| DOB NOW | General Construction | Permit Issued | LEWIS CONSTRUCTION NYC IN | 03/09/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | ROSENWACH TANK CO.,LLC | 01/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | ROSENWACH TANK CO.,LLC | 12/12/2025 |
| DOB NOW | Plumbing | Signed-off | VERTEX P & H CORP | 12/05/2025 |
| DOB NOW | Plumbing | Signed-off | ADRIATIC PLBG & HTG CORP | 12/03/2025 |
| DOB NOW | Plumbing | Permit Issued | MACREDDIN PLBG & HTG INC | 11/28/2025 |
| DOB NOW | General Construction | Permit Issued | ADDVANCED CARPENTRY | 11/12/2025 |
| DOB NOW | General Construction | Signed-off | ONE TEN GROUP INC | 10/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ONE TEN GROUP INC | 10/22/2025 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 10/21/2025 |
| DOB NOW | Plumbing | Signed-off | J&M PLUMBING OF WESTCHEST | 10/21/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/24/2026 | — | — | Air Conditioning Systems | Cooling |
| 04/22/2026 | Signed-off | ONE TEN GROUP INC | Heating Systems | Heat / Cool Heating U.S. Boiler SLENDERIZED 10,080 BTU · Radiant ×1 |
| 01/29/2026 | Permit Issued | EMPIRE BUILDERS & MAINT | Heating and Air Conditioning Systems | Heat / Cool Trane FCAB0301A- (Energy Efficiency: building systems are ETR) 300 CFM · Fan Coil Indoor ×4 FCAB0401A- (Energy Efficiency: building systems are ETR) 400 CFM · Fan Coil Indoor ×4 FCAB0301B- (Energy Efficiency: building systems are ETR) 300 CFM · Fan Coil Indoor ×2 Mitsubishi Electric MXZ-5D36NL 36,000 BTU · Vrf Outdoor ×2 |
| 12/20/2023 | — | — | Associated Ducts and Piping | Ducts & Piping N/A LAUNDRY EXHAUST DUCT 1 CFM · Ductwork ×1 |
| 04/30/2023 | Permit Issued | DEBONO BROS. BUILDERS & D | Heating and Air Conditioning Systems | Heat / Cool Trane fan coil FCAB060 13,000 BTU · Fan Coil Indoor ×2 fan coil FCU-2 & 5 6,480 BTU · Fan Coil Indoor ×2 Fan coil FACB040 9,520 BTU · Fan Coil Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | Permit Issued | HYDROKINETIC PLBG & HTG I | Gas, Water/Sanitary |
| 08/05/2026 | Permit Issued | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 06/19/2026 | Permit Issued | MACREDDIN PLBG & HTG INC | Gas, Water/Sanitary |
| 06/16/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 06/05/2026 | Permit Issued | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 06/03/2026 | Permit Issued | CATALANO PLBG & HTG INC | Gas, Water/Sanitary |
| 05/08/2026 | Signed-off | ORBIT PLBG & HTG INC | Gas, Water/Sanitary |
| 04/28/2026 | Permit Issued | ALAFOGIANNIS PLBG & HTG | Gas, Water/Sanitary |
| 04/22/2026 | Signed-off | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 03/31/2026 | Permit Issued | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 03/13/2026 | Permit Issued | ZFM INC | Gas, Water/Sanitary |
| 01/29/2026 | Signed-off | VERTEX P & H CORP | Gas, Water/Sanitary |
| 01/16/2026 | Permit Issued | ZFM INC | Gas, Water/Sanitary |
| 11/21/2025 | Signed-off | SAMUEL & SONS P & H INC | Gas, Water/Sanitary |
| 11/20/2025 | Permit Issued | G.BASSOLINO PLUMBING LTD | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Complete | NORCAL ELECTRIC LLC | General Wiring |
| 08/11/2026 | Permit Issued | TOMORROW ELECTRICAL LLC | General Wiring |
| 08/07/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 08/03/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 08/03/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 07/02/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 06/24/2026 | Permit Issued | TOMORROW ELECTRICAL LLC | General Wiring |
| 06/19/2026 | Permit Issued | EVS ELECTRIC CORP | General Wiring |
| 06/11/2026 | Permit Issued | LINA ELECTRIC, CORP | General Wiring |
| 06/01/2026 | Permit Issued | P.S. MARCATO ELEV CO INC | — |
| 05/27/2026 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 05/14/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 04/25/2026 | Permit Issued | LINA ELECTRIC, CORP | General Wiring |
| 04/20/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 04/20/2026 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/29/2026 | Signed-off | VERTEX P & H CORP | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | Permit Issued | ARSENAL SCAFFOLD INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/25/2024 | Signed-off | ONE TEN GROUP INC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/19/2025 | Permit Issued | ROSENWACH TANK CO.,LLC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/05/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/21/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 07/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/07/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/30/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/29/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 05/20/2026 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/05/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 04/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/15/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/24/2026 | Maintenance information | Christopher Krepcio | energy_progress |
| 08/13/2026 | Mechanical Systems | Christopher Krepcio | special |
| 08/13/2026 | HVAC-R and service water heating system controls | Christopher Krepcio | energy_progress |
| 08/13/2026 | HVAC-R and service water heating equipment | Christopher Krepcio | energy_progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Christopher Krepcio | special |
| 08/13/2026 | Final | — | progress |
| 08/13/2026 | Energy Code Compliance Inspections | — | progress |
| 08/13/2026 | HVAC-R and service water piping design and insulation | Christopher Krepcio | energy_progress |
| 08/13/2026 | Post-installed Anchors | Christopher Krepcio | special |
| 08/13/2026 | Tenant Protection Plan Compliance | — | special |
| 08/12/2026 | Final | Adam Alter | progress |
| 08/04/2026 | Energy Code Compliance Inspections | Nicolas Zapata | progress |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | Nicolas Zapata | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | ANA ACCETTA | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | ANA ACCETTA | special |
| 07/23/2026 | Final | Richard Massa | progress |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | Steven Peterson | special |
| 05/27/2026 | Lighting controls | Adam Alter | energy_progress |
| 05/27/2026 | Energy Code Compliance Inspections | Adam Alter | progress |
| 05/27/2026 | Interior lighting power | Adam Alter | energy_progress |
| 05/27/2026 | Lighting in dwelling units | Adam Alter | energy_progress |
| 05/26/2026 | Final | Adam Alter | progress |
| 04/27/2026 | Fire-Resistant Penetrations and Joints | Ann Macklin | special |
| 03/16/2026 | Energy Code Compliance Inspections | Adam Alter | progress |
| 03/16/2026 | Lighting in dwelling units | Adam Alter | energy_progress |