| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01422554 | 121 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 06/25/2026 | 06/25/2026 | — | In Apt 33, Install a new 200-amp 84-circuit-breaker panel at same location to replace existing 2 old breaker panels using existing feeders. … |
| M01268386 | 2800 BROADWAY MANHATTAN | Subsequent Filing | Complete | 01/30/2026 | 01/30/2026 | — | Replace existing panel with larger panel in existing location. Install branch circuits to kitchen appliances and countertop receptacles + ba… |
| M01318452 | 1328 2 AVENUE MANHATTAN | New Job Filing | Job in process | 11/13/2025 | 11/13/2025 | — | Replace existing panel with new panel using existing feeders. rewire kitchen and 2 bathrooms, replace existing receptacles with new tamper-r… |
| M01266414 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 08/05/2025 | 08/05/2025 | — | In Apt 19R, Install 2 LED track fixtures in living room and bed room using existing AF-protected circuits and install 3 dimmers |
| M01094009 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Job in process | 07/30/2025 | 07/30/2025 | — | Rewire of entire Apt 10C, new 3-phase service from existing meterpan + fuseblock in basement, new rooftop heatpump. Maintain temp lighting &… |
| M01163852 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Complete | 07/30/2025 | 07/30/2025 | — | Install 3-phase 150-amp feeders from existing fuseblock in basement to existing panel in Apt 6C, Contact ConEd for new meter. Install 3-phas… |
| Name | Projects together | Most recent |
|---|---|---|
| Century Condominuim | 3 | — |
| Valroge Corporation | 1 | — |
| The Century Condominium | 1 | — |
| 79Th Street & East End Ave Corp | 1 | — |
| Representative | 1 | — |
| 2317 96Th Street Llc | 1 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01422554 | 121 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 06/25/2026 | 06/25/2026 | — | In Apt 33, Install a new 200-amp 84-circuit-breaker panel at same location to replace existing 2 old breaker panels using existing feeders. … |
| M01268386 | 2800 BROADWAY MANHATTAN | Subsequent Filing | Complete | 01/30/2026 | 01/30/2026 | — | Replace existing panel with larger panel in existing location. Install branch circuits to kitchen appliances and countertop receptacles + ba… |
| M01318452 | 1328 2 AVENUE MANHATTAN | New Job Filing | Job in process | 11/13/2025 | 11/13/2025 | — | Replace existing panel with new panel using existing feeders. rewire kitchen and 2 bathrooms, replace existing receptacles with new tamper-r… |
| M01266414 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 08/05/2025 | 08/05/2025 | — | In Apt 19R, Install 2 LED track fixtures in living room and bed room using existing AF-protected circuits and install 3 dimmers |
| M01094009 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Job in process | 07/30/2025 | 07/30/2025 | — | Rewire of entire Apt 10C, new 3-phase service from existing meterpan + fuseblock in basement, new rooftop heatpump. Maintain temp lighting &… |
| M01163852 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Complete | 07/30/2025 | 07/30/2025 | — | Install 3-phase 150-amp feeders from existing fuseblock in basement to existing panel in Apt 6C, Contact ConEd for new meter. Install 3-phas… |
| M01256644 | 1115 5 AVENUE MANHATTAN | New Job Filing | Job in process | 07/16/2025 | 07/16/2025 | — | Install new 3-phase, 4-wire service from new 200-amp disconnect with 150-amp fuses in basement electrical room distribution board to new pan… |
| M01255156 | 1115 5 AVENUE MANHATTAN | New Job Filing | Complete | 07/14/2025 | 07/14/2025 | — | Extend available dedicated circuit from basement workshop via new GFCI to feed sidewalk shed lighting filed by others under app# M01247256 |
| M01247784 | 1115 5 AVENUE MANHATTAN | New Job Filing | Job in process | 06/26/2025 | 06/26/2025 | — | Install new 3-phase service from existing 200-amp gap with existing 150-amp fuses in basement electrical room distribution board to new pane… |
| Q01240261 | 64-25 65 LANE QUEENS | New Job Filing | Job in process | 06/12/2025 | 06/12/2025 | — | Add PLP meter and MB panel. Replace 2 existing Federal Pacific MB panels with 2 new MB panels |
| M01228564 | 505 GREENWICH STREET MANHATTAN | New Job Filing | Job in process | 05/20/2025 | 05/20/2025 | — | IN APARTMENT PHD INSTALL NEW WIRING FOR NEW KITCHEN COOKING APPLIANCES. REPLACE EXISTING MLO PANEL WITH LARGER TO ACCOMODATE ADDITIONAL CIRC… |
| M01225496 | 505 GREENWICH STREET MANHATTAN | New Job Filing | Job in process | 05/13/2025 | 05/13/2025 | — | IN APARTMENT PHC INSTALL NEW WIRING FOR ELECTRIC COOKTOP IN KITCHEN. INSTALL NEW 30 CKT MLO PANEL IN PLACE OF EXISTING 20 CKT MLO PANEL USIN… |
| M00763096 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Job in process | 04/28/2025 | 04/28/2025 | — | Install GFCI-protected receptacles and switch thruout Apt PH-A. Install temporary lighting stringers |
| M01169253 | 1115 5 AVENUE MANHATTAN | Subsequent Filing | Job in process | 04/10/2025 | 04/10/2025 | — | Install GFCI-protected receptacles and switch next to existing panel for temporary power in Apt 5B |
| M01183908 | 1153 PARK AVENUE MANHATTAN | New Job Filing | Complete | 02/20/2025 | 02/20/2025 | — | Extend existing dedicated branch circuit from one window to another window within the same room |
| M01154913 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 12/12/2024 | 12/12/2024 | — | Install 2 new 400-amp panels with 1 set feeders from North MDB on load side of existing fuses |
| M01093049 | 433 EAST 57 STREET MANHATTAN | Subsequent Filing | Job in process | 12/10/2024 | 12/10/2024 | — | Wire/install 2 ceiling fixtures, 2 switches and 2 receptacles for new foyer entry to apt 15CD |
| M01143505 | 14 SUTTON PLACE SOUTH MANHATTAN | New Job Filing | Job in process | 11/17/2024 | 11/18/2024 | — | Rewire of Apt 9A, existing feeders, new panel. provide temp lighting for scope |
| M01132973 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Job in process | 10/25/2024 | 11/01/2024 | — | Notify Utility Co to install meter |
| M01090359 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 08/02/2024 | 08/02/2024 | — | Install new (2) 400-amp panels with (1) set feeders from North MDB on load side of existing 400-amp fuses |
| M01032058 | 150 EAST 69TH STREET MANHATTAN | Subsequent Filing | Complete | 05/24/2024 | 05/24/2024 | — | New circuit-breaker panel, extend existing feeders, rewire apt 4E. provide temporary power & lighting for project. |
| Q01039282 | 51-18 48 STREET QUEENS | Subsequent Filing | Complete | 05/24/2024 | 05/24/2024 | — | Remove wiring for illegal partition wall in cellar, install 14 canless recessed ceiling fixtures and 3 switches and 2 GFCIs |
| M01049958 | 1250 3 AVENUE MANHATTAN | New Job Filing | Complete | 05/12/2024 | 05/12/2024 | — | Within Apt 7D, install new circuit breaker panel, extend existing feeders and rewire apt. Provide temp lighting and power for duration of pr… |
| Q00935002 | 45-14 50 STREET QUEENS | New Job Filing | Job in process | 09/16/2023 | 09/16/2023 | — | Install new service, panels and wiring for 2-family house with PLP meter, provide temp lighting and power for project |
| M00923962 | 50 EAST 79 STREET MANHATTAN | Subsequent Filing | Complete | 09/12/2023 | 09/12/2023 | — | New panel & branch wiring for Apt 6B only Provide temporary lighting and power. |
| M00901588 | 117 EAST 79 STREET MANHATTAN | New Job Filing | Complete | 07/10/2023 | 07/10/2023 | — | In Unit# TH, install 27 surface-mounted light fixtures on existing wiring on both levels. Install 58 Home Automation dimmers in existing swi… |
| M00892397 | 216 EAST 18 STREET MANHATTAN | New Job Filing | Job in process | 06/19/2023 | 06/19/2023 | — | Rewire of existing 2-family townhouse, with new service/meters panels and branch wiring. Install temp lighting and power for project. |
| M00891753 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Job in process | 06/16/2023 | 06/16/2023 | — | Rewire Apt 15T, install new panel and extend existing feeders, provide disconnects and temp lighting and power for project |
| M00831712 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 02/18/2023 | 02/18/2023 | — | Install new 400-amp panel and feeders in room adjacent to South Main Electrical Room |
| M00815156 | 1115 5 AVENUE MANHATTAN | New Job Filing | Job in process | 01/19/2023 | 01/19/2023 | — | Rewire Apt 9B, install temporary lighting and receptacles for construction. Existing feeders and NEW 2 panels, new branch wiring. |
| M00811594 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 01/11/2023 | 01/11/2023 | — | Install 400-amp, 3-phase 42-ckt panels in room adjacent to North Main Electrical Distribution Room |
| Q00789519 | 104-18 46 AVENUE QUEENS | New Job Filing | Job in process | 08/09/2022 | 08/09/2022 | — | Install new overhead service with exterior metering, exterior service switches and exterior PLP MB panel, connect existing interior feeders,… |
| Q00772353 | 25-80 48 STREET QUEENS | New Job Filing | Job in process | 07/11/2022 | 07/11/2022 | — | Filing for one 3/3 BX feeder from service panel to sub-panel in basement (missing from app#A369194) |
| M00724674 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 04/25/2022 | 04/25/2022 | — | Rewire Apt 24H, extend feeders, install temp lighting and temp receptacles |
| M00721159 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 04/19/2022 | 04/19/2022 | — | From basement, install new 3-phase 90-amp feeders and panel in Apt 12J, install new single-phase 60-amp feeders and panel in Apt 11K, no oth… |
| M00687474 | 520 EAST 86 STREET MANHATTAN | New Job Filing | Job in process | 02/25/2022 | 02/25/2022 | — | Within Apt 2A, install temp lighting, wire for new subpanel, PTAC units, split AC systems and partial renovation of kitchen & laundry area |
| M00673739 | 8 EAST 83 STREET MANHATTAN | New Job Filing | Complete | 02/03/2022 | 02/03/2022 | — | Rewire Apt 12C, new circuit-breaker panel, existing feeders |
| M00622130 | 1115 5 AVENUE MANHATTAN | New Job Filing | Complete | 10/30/2021 | 10/30/2021 | — | Rewire 1 bathroom and 1 room in Apt 3C |
| M00592762 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Job in process | 09/13/2021 | 09/13/2021 | — | Rewire Apt 12G, existing feeders |
| M00579434 | 515 EAST 79 STREET MANHATTAN | New Job Filing | Complete | 08/19/2021 | 08/19/2021 | — | Relocate 1 disconnect switch for RTU and relocate 2 RTUs with existing wiring on Roof of building |
| M00578465 | 1115 5 AVENUE MANHATTAN | New Job Filing | Job in process | 08/18/2021 | 08/18/2021 | — | Rewire of Apt 4B, install temp lighting for project |
| M00538403 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 06/11/2021 | 06/11/2021 | — | New feeders from basement to Apt 5C, new circuit-breaker panel, NO branch wiring |
| M00491745 | 590 WEST END AVENUE MANHATTAN | New Job Filing | Job in process | 03/24/2021 | 03/24/2021 | — | Apt 5F, install new panel, extend existing feeders from old location to new location, rewire bedroom, bathroom, living room and den |
| M00463434 | 150 EAST 69TH STREET MANHATTAN | Subsequent Filing | Complete | 03/08/2021 | 03/08/2021 | — | Install new panel, rewire apt 8C |
| M00409671 | 1115 5 AVENUE MANHATTAN | New Job Filing | Complete | 10/07/2020 | 10/07/2020 | — | In Basement Electrical Room for Apt 4C Install new meter pan to replace old pan with pitted jaws and request new meter from Con Ed |
| M00388687 | 117 WEST 70 STREET MANHATTAN | New Job Filing | Job in process | 08/21/2020 | 08/21/2020 | — | install new wiring for new AC system on 1st Floor Kitchenette Acting Studio and Dance Studio with Heat Pumps on 1st Floor Roof |
| M00367178 | 170 EAST 88 STREET MANHATTAN | New Job Filing | Complete | 07/07/2020 | 07/07/2020 | — | Minor work to replace 8 receptacles and 1 ceiling fan on existing wiring |
| M00331431 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 03/12/2020 | 03/12/2020 | — | install temp power and lighting, install new panel, extend feeders and rewire Apt 11M |
| M00324638 | 235 EAST 40 STREET MANHATTAN | New Job Filing | Complete | 03/01/2020 | 03/02/2020 | — | Rewire Apt 20A, install new panel |
| M00268624 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Job in process | 11/20/2019 | 11/20/2019 | — | Rewire apt 7G |
| M00260718 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 11/07/2019 | 11/07/2019 | — | Install new 3-phase panel in Apt 24-O with new feeders from North Tower Electrical Room. No Branch wiring within Apt under this filing. |
| M00232703 | 1115 5 AVENUE MANHATTAN | New Job Filing | Job in process | 09/22/2019 | 09/23/2019 | — | Gut Rewire of Apt 11A including Temp lighting & Power. New 3-phase Riser from basement |
| M00204214 | 205 EAST 78 STREET MANHATTAN | New Job Filing | Complete | 08/04/2019 | 08/04/2019 | — | Rewire Apt 3K, Install new panel, use existing feeders |
| M00192520 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 07/12/2019 | 07/12/2019 | — | For Apt 30Q, install new feeders from 30th Flr Service elevator lobby to new 3-phase panel in apt. Install branch wiring to 3 AC outlets, 1 … |
| M00192548 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 07/12/2019 | 07/12/2019 | — | Install 3-phase 225-amp MB panel in North Tower Electrical Room |
| M00171900 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 05/24/2019 | 05/24/2019 | — | Rewire Apt 12J |
| Q00157867 | 105-07 66 ROAD QUEENS | New Job Filing | Job in process | 04/22/2019 | 04/23/2019 | — | Rewire Apt 3F, existing feeders. |
| M00155359 | 414 WEST BROADWAY MANHATTAN | New Job Filing | Complete | 04/16/2019 | 04/16/2019 | — | Gut Rehab of Apts 2N, 3N, 3S, 4N & 4S. New Stairwell and Lobby lighting/power |
| M00152984 | 401 EAST 89 STREET MANHATTAN | New Job Filing | Complete | 04/10/2019 | 04/10/2019 | — | Partial rewire of Apt 7M. Install new panel in kitchen. Bathrooms, partial bedrooms, partial living room and AC units excluded |
| M00138182 | 605 PARK AVENUE MANHATTAN | New Job Filing | Complete | 03/05/2019 | 03/05/2019 | — | Rewire Apt 10G |
| M00129505 | 726 GREENWICH STREET MANHATTAN | New Job Filing | Complete | 02/11/2019 | 02/11/2019 | — | rewire bedroom, bathroom and walk-in closet of Apt 10E |
| M00124014 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 01/28/2019 | 01/28/2019 | — | Rewire Apt 8B |
| M00093648 | 301 EAST 48 STREET MANHATTAN | New Job Filing | Complete | 10/29/2018 | 10/29/2018 | — | Install new circuit-breaker panel, existing feeders, rewire kitchen and bathroom only |
| M00074938 | 260 WEST BROADWAY MANHATTAN | New Job Filing | Complete | 08/29/2018 | 08/29/2018 | — | Rewire duplex Apt 5/6E |
| M00045231 | 25 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 05/17/2018 | 05/17/2018 | — | Install new panels in basement and on 16th Flr |
| M00023475 | 12 BEEKMAN PLACE MANHATTAN | New Job Filing | Job in process | 03/01/2018 | 03/01/2018 | — | Install new circuit-breaker panel and rewire apt 10E |
| M00019018 | 1115 5 AVENUE MANHATTAN | New Job Filing | Complete | 02/12/2018 | 02/13/2018 | — | Install new conduit and 4/0 THWN feeders from basement to 15C apt to replace existing without proper cable supports. Existing panel remains. |
| M00008639 | 150 EAST 69TH STREET MANHATTAN | New Job Filing | Complete | 01/10/2018 | 01/16/2018 | — | rewire apt 18P |