Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects679th Tenants Corp.Under Construction1 filing
FISP Repairs Program per plans submitted herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Roof69th Tenants Corp.Under Construction3p · 5 filings · 15 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Structural
MATERIAL HOIST
On file for this project
3 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
On file for this project
2 documents · 1 drawing sheet
Propose to install pergola dunnage structure for support of new pergola and miscellaneous landscaping all as per plans herewith filed. No change in use egress or occupancy filed under this application.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 29Unit 29L2 filings · 14 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
HEREWITH FILING PLUMBING WORK RELATED TO BATHROOM AND KITCHEN RENOVATIONS IN APARTMENT 29L. NO CHANGE IN USE EGRESS OROCCUPANCY.
On file for this project
9 documents
HEREWITH FILING MECHANICAL WORK RELATED TO RENOVATION OF APARTMENT 29L. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 28
Floor 27Unit 27K, Unit 27L4 filings · 15 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
27G: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
11 documents
Installation of HVAC system. No change of use, egress under this application
On file for this project
7 documents
Plumbing work related to renovation of Apartment 27K
On file for this project
19 documents
Latest 3 of 4 filings on this floor.
Floor 26Unit 26H, Unit 27J4p · 2 filings · 15 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Unit 27J- Plumbing in conjunction with i1 filing to replace and/or relocate existing fixtures, a new washing machine,
On file for this project
32 documents · 4 drawing sheets
PAA filed for revised plans to show as built conditions - no change to scope of work filed to renovate apartment 26H to include modification of the non bearing partitions with new finishes. no change to use, egress or occupancy under this filing
On file for this project
17 documents
Floor 25
Floor 24Unit 24H, Unit 24M3 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 24M LOCATED ON THE 24TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNIT 24H. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
5 documents
INTERIOR RENOVATION OF UNIT 24H IN EXISTING MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
8 documents
Floor 23Unit 23M1 filing · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 23M LOCATED ON THE 23RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
Floor 22Unit 22M1 filing · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 22M LOCATED ON THE 22ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
Floor 21
Floor 20Unit 20C, Unit 20F, Unit 20J +24 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 20J ON THE 20TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
10 documents
Plumbing work filed in conjunction with the general construction. No change in use, egress, or occupancy under this application
On file for this project
18 documents
THE WORK AS PER PLANS.
On file for this project
9 documents
Latest 3 of 4 filings on this floor.
Floor 19Unit 19P, Unit 19SUnder Construction1p · 4 filings · 14 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Project M01379215Permit Issued · 06/09/2026
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 19P ON THE 19TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 19P ON THE 19TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
PLUMBING WORK ON THE 19TH FLOOR IN APARTMENT 19S AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 18Unit 18A, Unit 18C, Unit 18F +2Under Construction8 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING DWELLING UNIT # 18F. NO CHANGE TO OCCUPANCY, USE, OR EGRESS PROPOSED.
On file for this project
9 documents
PLUMBING SCOPE FOR INITIAL GC JOB FILING. EXISTING BATHROOM AND KITCHEN FIXTURES TO BE REPLACED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents
Installation, removal, relocation, and replacement of plumbing and gas fixtures as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
Latest 3 of 8 filings on this floor.
Floor 17Unit 17A, Unit 17E, Unit 17F +32p · 10 filings · 15 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 17L ON THE 17TH FLOOR PER PLANS SUBMITTED HEREWITH. DIRECT REPLACEMENT OF BALCONY ENCLOSURE FILED UNDER NYC DOB JOB #123331242, APPROVED 9/01/17. EXISTING ORIGINAL BALCONY RAILING NOT TO BE DISTURBED.
On file for this project
4 documents
PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION. GENERAL CONSTRUCTION AND MECHANICAL ARE FILED UNDER SEPARATE APPLICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 17F LOCATED ON THE 17TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
Latest 3 of 10 filings on this floor.
Floor 16Unit 16K2 filings · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING APPLICATION FOR INTERIOR PLUMBING WORK IN APARTMENT 16K ON THE 16TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
HEREBY FILING FOR RENOVATION OF EXISTING APARTMENT 16K LOCATED ON THE 16TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
7 documents
Floor 15Unit 15C, Unit 15K, Unit 15L +5Under Construction1p · 11 filings · 15 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 15LM LOCATED ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 15C ON THE 15TH FLOOR AS PER PLANS SUBMITTED HEREWITH. REPLACE WINDOWS WITH NEW IN EXISTING LOCATIONS, PARTITION AND FINISH WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
HEREBY FILING APPLICATION FOR THE TERRACE ENCLOSURE IN EXISTING APARTMENT 15Q ON 15TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 11 filings on this floor.
Floor 14Unit 14N2 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES IN APARTMENT 14N LOCATED ON THE 14TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 14N LOCATED ON THE 14TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents
Floor 13
Floor 12Unit 12C, Unit 12D, Unit 12E +5Under Construction1p · 10 filings · 20 docs
ArchitectureElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF EXISTING FAN COIL UNITS at Apt 12E., CORRESPONDING TO ARCHITECTURAL RENOVATION UNDER SEPARATE FILING M00846786 and M00846815. No change in Use, Egress, or Occupancy is proposed.
On file for this project
5 documents
Proposed plumbing modification of unit 12E including removal and replacement of the kitchen, modification of 2 bathrooms, and modification of finishes throughout. No change in Use, Egress, or Occupancy is proposed in this application.
On file for this project
15 documents
Proposed non-structural modification of unit 12E including removal and replacement of the kitchen, modification of 2 bathrooms, and modification of finishes throughout. No change in Use, Egress, or Occupancy is proposed in this application.
On file for this project
8 documents
Latest 3 of 10 filings on this floor.
Floor 11Unit 11C, Unit 11D, Unit 11K +2Under Construction1p · 7 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 11L ON THE 11TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 11L ON THE 11TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
FILING APPLICATION FOR INTERIOR PLUMBING WORK IN APARTMENT 11C ON THE 11TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 10Unit 10L, Unit 10S4p · 4 filings · 15 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing work associated with GC application for unit 10S
On file for this project
13 documents · 4 drawing sheets
Replace bathroom plumbing fixtures. Relocate kitchen plumbing fixtures. Relocate gas range. Install new gas dryer.
On file for this project
10 documents
Interior renovation of apartment 10L. Minor removal and construction of partitions. Replace bathrooms and kitchen. No change to use egress or occupancy.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 9Unit 9B2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACEMENT OF BATHROOM AND KITCHEN FIXTURES IN APT9B
On file for this project
4 documents
INTERIOR RENOVATION OF APARTMENT 9B. RELATED PARTITIONS, REFLECTED CEILING, NEW WOOD FLOORING, CABINETRY, NEW KITCHEN AND BATH FIXTURES
On file for this project
3 documents
Floor 8Unit 8C1p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING APPLICATION FOR PLUMBING WORK IN APARTMENT 8C ON 8TH FLOOR.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 7Unit 7C, Unit 7G, Unit 7J +13p · 7 filings · 15 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing application related to interior renovation of apartment 7G. No change to use, egress or occupancy.
On file for this project
11 documents
FILING INTERIOR PLUMBING RENOVATION APPLICATION IN CONJUNCTION WITH THE GENERAL CONSTRUCTION WORK FOR APARTMENT 7C ON THE 7TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
FILING INTERIOR RENOVATION APPLICATION IN CONJUNCTION WITH PLUMBING WORK FOR APARTMENT 7C ON THE 7TH FLOOR. NO CHANGE IN USED, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Floor 6Unit 6J2 filings · 9 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Minor interior renovation of an existing apartment #6J that will include the removal of non-structural walls. As per plans filed herewith, no change to use, occupancy or egress.
On file for this project
6 documents
Installation, Replacement & Relocation of plumbing fixtures for Apartment #6J. As per plans filed herewith, no change to use, occupancy or egress
On file for this project
3 documents
Floor 5Unit 5C, Unit 5J, Unit 5N +1Under Construction1p · 6 filings · 15 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 5J ON THE 5TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 5N ON THE FIFTH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents
PARTIAL INTERIOR RENOVATION OF THE MASTER BATHROOM, GUEST BATH ROOM AND KITCHEN
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 4Unit 4E, Unit 4H3 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 4E LOCATED ON THE FOURTH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
Replace and relocate kitchen sink, dishwasher and gas range. Add clothes washing machine.
On file for this project
10 documents
Herewith file plans for the interior renovation of apartment 4H.
On file for this project
7 documents
Floor 3Unit 3E, Unit 3J, Unit 3K +4Under Construction8 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUNCTION WITH ALTERATION TO APARTMENT 3E
On file for this project
12 documents
NEW PLUMBING WORK AS INDICATED ON DRAWINGS. NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING THIS APPLICATION.
On file for this project
9 documents
HEREBY FILING FOR THE REMOVAL REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES IN APARTMENT 3R LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 2Unit 2C, Unit 2H, Unit 2P +1Under Construction1p · 5 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REMOVE , RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RENOVATION OF APARTMENT #2R , ON THE 2ND FLOOR. ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY..
On file for this project
10 documents
REMOVE 3 LAVS., 2 TOILETS, 1 SHOWER, 1 TUB. RELOCATE 1 DISHWASHER, 1 SINK, 1 GAS RANGE. INSTALL 1 NEW TUB, 1 SHOWER 2 TOILETS, 3 LAVS., 1 CLOTHES WASHER, 1 GAS DRYER.
On file for this project
12 documents · 1 drawing sheet
Remodeling of 1 Kitchen and 1 Bathroom. No change in egress,use or occupancy.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 169th Tenants Corp.Under Construction21p · 16 filings · 15 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
GENERAL CONSTRUCTION, COLUMN AND WALKWAY RESTORATION AS PER PLANS HEREWITH FILED.
On file for this project
9 documents · 4 drawing sheets
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AND HAND SINKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
5 documents · 1 drawing sheet
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AND HAND SINKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 5 drawing sheets
Latest 3 of 16 filings on this floor.
MezzanineNew subway station entrance construction1p · 1 filing · 13 docs
Architecture
Construction of new entrance for 68th Street Hunter College Subway Staion. New entrance includes (3) stairs, control area(s), a utility room and (1) storage room. Part of storefront to be rebuilt to match existing system.
On file for this project
13 documents · 1 drawing sheet
Cellar69th Tenants Corp.11p · 9 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Support of Excavation
Plumbing work to accommodate interior demolition of commercial space. No change to use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Interior demolition of commercial space. No change to use, egress or occupancy.
On file for this project
5 documents
Excavation for new subway entrance, Underpinning of exiting floor slab.
On file for this project
8 documents
Latest 3 of 9 filings on this floor.
Site & exterior69th Tenants Corp.Under Construction3 filings · 7 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Sidewalk Shed · Sign
INSTALLATION OF 300PSF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
3 documents · 4 drawing sheets
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
2 documents · 1 drawing sheet
Filed — no permit issued69 Street Tenants CORP1 filing · 3 docs
General
INSTALL CONSTRUCTION FENCE IN CONJUNCTION WITH STOREFRONT MODIFICATION.
On file for this project
3 documents · 1 drawing sheet