Condo, commercial tower (mixed-use) [derived]
162 Fifth Avenue Leasehold Condominium
162 5 AVENUE · BIN 1015534
💬 Discuss this project
1930Year Built
12Stories
RCBuilding Class
C6-4MZoning
114,503 sfGross Floor Area
13Units
LL97 Covered7 Open Violations ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 10,100 sf lot · 11.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof2p · 4 filings · 20 docs
Floor 121p · 2 filings · 9 docs
Floor 111p · 2 filings · 6 docs
Floor 106p · 4 filings · 20 docs
Floor 91 filing · 4 docs
Floor 81 filing · 4 docs
Floor 75p · 4 filings · 20 docs
Floor 61 filing · 4 docs
Floor 51 filing · 4 docs
Floor 42p · 2 filings · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 23p · 6 filings · 20 docs
Floor 120p · 5 filings · 20 docs
Cellar30p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABS PARTNERS REAL ESTATE, LLC10204/09/2026
PHOENIX SUTTON STR INC503/22/2026
L K PARTNERS403/22/2026
HELMSLEY SPEAR303/22/2026
JPMORGAN CHASE BANK NATIO103/22/2026
MURRAY HILL PROPERTIES303/22/2026
162 5TH AVE ASSOCIATES303/22/2026
FIFTH & 21 ST. COMPANY303/22/2026
5 & 21 C0103/22/2026
FIFTH 21ST COMPANY203/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&K PARTNERS, INCGeneral Contractor607/08/2026
MELICO CONTRACTING INCGeneral Contractor507/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor403/21/2026
HARBOR RESTORATION SERVICGeneral Contractor407/08/2026
PREMIER SANITATION LLCGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor307/08/2026
DNA CONTRACTING LLCGeneral Contractor304/09/2026
SOTIRIOS STATHOPOULOSElectrical303/21/2026
PALONE BROTHERS AIRGeneral Contractor203/21/2026
KMM TELECOMMUNICATIONSGeneral Contractor207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
URBAN INTELLIGENCE, INCGeneral Contractor107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
F&G MECHANICAL, INCPlumbing107/08/2026
G. C. PLBG & HTG INCPlumbing107/08/2026
A.S.K. ELECTRICAL CORPElectrical103/22/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
CHRISTOPHER JACCARINOElectrical103/21/2026
JACCARINO, CHRISTOPHERElectrical103/21/2026
KIRK, DANIELElectrical103/21/2026
MILLAR ELEVATOR IND., INCElectrical103/21/2026
PHILIP GOEHRINGElectrical103/21/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
BEDROCK MECHANICAL INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JEREMY K MCKEON, P.E.7263112/05/2024
DNA CONTROLLED INSPECTION554310/16/2024
MEP INSPECTIONS, INC1102309/20/2024
CTHREE ARCHITECTURE + DES1124509/20/2024
MICHAEL ZENREICH ARCHITEC1724509/17/2024
TSF ENGINEERING, PC1274101/08/2024
PROJECT TACTICAL SOLUTION5859208/01/2023
SKYLINE ENGINEERING, PLLC267404/17/2023
JASON M APTOWITZ CONSULTI5671104/10/2023
NEW AGE ENGINEERING PLLC7746109/09/2022
Building Lifecycle
All (300)Filed (54)Permit Issued (35)Signed Off (21)Facade (FISP) (15)Violation (53)Inspection (18)Objection (74)Special Inspection (30)
01/20/2026
Signed off — Alteration
M00838255-I1
06/24/2025
Signed off — Alteration
Filing for int. removal of non-load bearing partitions and finishes in commercial space. New stair opening, removal of vault and work at elevator pit. Removal of plumbing fixtures and structural filed subsequently. No change to use, egress or occupancy.
M00925010-S3
06/11/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F BLADE SIGN FOR ON RUNNING.
M01135892-I1
06/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Signed off — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-S3
05/27/2025
Signed off — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-S1
04/25/2025
Signed off — Alteration
Filing application for the removal of mechanical equipment, and installation of new split system AC units as per plans submitted.
M00925713-I1
04/02/2025
Permit issued — Sign
M01135892-I1-SG
04/01/2025
Permit issued — General Construction
M00875984-I1-GC
03/27/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F BLADE SIGN FOR ON RUNNING.
M01135892-I1
03/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/07/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00786556-I1
12/27/2024
Permit issued — Sidewalk Shed
M00786556-I1-SH
12/20/2024
Permit issued — Antenna
M01015692-I1-AN
12/05/2024
Filed — Alteration
M01015692-I1
11/20/2024
Permit issued — General Construction
M00875984-I1-GC
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
11/13/2024
Objection resolved — Addressed
10/31/2024
Special inspection requirement — Final
SALVATOR CARADONNA
10/25/2024
Signed off — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-I1
10/23/2024
Special inspection requirement — Final
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Subgrade Inspections
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Structural Steel - Details
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Sprayed fire-resistant materials
WILLIAM FITZJOHN
10/23/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM FITZJOHN
10/16/2024
Filed — Alteration
Filing for int. removal of non-load bearing partitions and finishes in commercial space. New stair opening, removal of vault and work at elevator pit. Removal of plumbing fixtures and structural filed subsequently. No change to use, egress or occupancy.
M00925010-P4
10/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Subgrade Inspections
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Structural Steel - Details
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Sprayed fire-resistant materials
WILLIAM FITZJOHN
10/15/2024
Special inspection requirement — Final
WILLIAM FITZJOHN
09/30/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/26/2024
Signed off — Alteration
Filing for int. removal of non-load bearing partitions and finishes in commercial space. New stair opening, removal of vault and work at elevator pit. Removal of plumbing fixtures and structural filed subsequently. No change to use, egress or occupancy.
M00925010-I1
09/26/2024
Signed off — Alteration
Filing for int. removal of non-load bearing partitions and finishes in commercial space. New stair opening, removal of vault and work at elevator pit. Removal of plumbing fixtures and structural filed subsequently. No change to use, egress or occupancy.
M00925010-S1
09/25/2024
Objection raised — Other
09/20/2024
Filed — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-P2
09/20/2024
Filed — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-P3
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew Ciarniello
09/20/2024
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
09/17/2024
Filed — Alteration CO
Filing application for change of use to retail on part of cellar and first floors. Work includes removal and installation of interior non-load bearing partitions and finish work. No change in bulk. No change to egress.
M00875984-P1
09/13/2024
Filed — Alteration
Filing for int. removal of non-load bearing partitions and finishes in commercial space. New stair opening, removal of vault and work at elevator pit. Removal of plumbing fixtures and structural filed subsequently. No change to use, egress or occupancy.
M00925010-P3
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
09/12/2024
Special inspection requirement — Final
Michael Zenreich
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
08/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/12/2024
Filed — Alteration
Filing subsequent sprinkler application for installation, removal, and relocation of SP heads in existing system, as per plans submitted - for retail space on cellar and first floor.
M01023164-P1
07/12/2024
Permit issued — Sprinklers
M01023164-S3-EW-SP
07/11/2024
Permit issued — Mechanical Systems
M01023164-S1-MS
07/10/2024
Signed off — Alteration
MODIFICATION OF AN EXISTING MECHANICAL SYSTEM ON THE 10TH FLOOR. NO CHANGE OF USE EGRESS OR OCCUPANCY. THE BUILDING IS LOCATED IN THE LADIES MILE HISTORIC DISTRICT AND IS EXEMPT FROM NYCECC.
M00904336-I1
07/10/2024
Signed off — Alteration
M00904345-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC04/02/2025
DOB NOWGeneral ConstructionPermit IssuedMELICO CONTRACTING INC04/01/2025
DOB NOWSidewalk ShedSigned-offEXTERIOR WALL & BUILDING12/27/2024
DOB NOWAntennaPermit IssuedA CELL COMMUNICATIONS INC12/20/2024
DOB NOWGeneral ConstructionPermit IssuedMELICO CONTRACTING INC11/20/2024
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC07/12/2024
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO07/11/2024
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC07/10/2024
DOB NOWGeneral ConstructionPermit IssuedHARBOR RESTORATION SERVIC06/17/2024
DOB NOWStructuralSigned-offMELICO CONTRACTING INC05/09/2024
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO04/29/2024
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON04/22/2024
DOB NOWMechanical SystemsSigned-offPALONE BROTHERS AIR04/19/2024
DOB NOWPlumbingSigned-offG. C. PLBG & HTG INC04/19/2024
DOB NOWGeneral ConstructionPermit IssuedHARBOR RESTORATION SERVIC04/04/2024
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC02/06/2024
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC01/09/2024
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC01/04/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP09/11/2023
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP08/17/2023
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC08/10/2023
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC08/10/2023
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON04/13/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC02/20/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/14/2023
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS11/22/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP09/12/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/22/2022
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE07/27/2022
DOB NOWPlumbingSigned-offF&G MECHANICAL, INC07/07/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/19/2022
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC01/07/2022
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC01/05/2022
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS08/26/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/19/2019
BISOTISSUEDANDAMIO SCAFFOLDING LLC04/01/2024
BISOTISSUEDANDAMIO SCAFFOLDING LLC04/03/2023
BISOTISSUEDANDAMIO SCAFFOLDING LLC11/07/2022
BISOTISSUEDANDAMIO SCAFFOLDING LLC03/08/2022
BISOTISSUEDJRR CONTRACTING INC03/30/2020
+ 45 more permits on file
1 project · most recent 09/20/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/20/2024Signed-offSCHIMENTI CONSTRUCTION COAir Conditioning Systems
Cooling
Greenheck CSP-A390-VG 305 CFM · Exhaust Fan ×2
1 project · most recent 09/20/2024
FiledStatusContractorScope
09/20/2024Signed-offBEDROCK MECHANICAL INC120 heads
1 project · most recent 09/20/2024
Water/Sanitary
FiledStatusContractorScope
09/20/2024Permit IssuedBEDROCK PLBG. & HTG., INCWater/Sanitary
13 projects · most recent 05/20/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedE.N.E.L. ELECTRICAL CORPHVAC Wiring
05/01/2026Permit IssuedERNE VALLEY ELECTRICAL INGeneral Wiring
08/26/2025CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
08/01/2024Permit IssuedSALVATORE CAMPISI & SONSGeneral Wiring
05/13/2024Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
05/13/2024Permit IssuedP&H ELECT D/B/A MAGE ELEC—
05/01/2023CompleteJTE ELECTRICAL SERVICES—
09/12/2022Complete5 J'S ELECTL CONTS CORP—
03/09/2022CancelledBOROWIDE ELECT'L CONTR'S—
04/22/2020CompletePOLO ELECTRIC CORP. D/B/AGeneral Wiring
02/11/2020CompletePOLO ELECTRIC CORP. D/B/AGeneral Wiring
12/24/2019CompleteCAMPBELL & DAWES LTD ELECGeneral Wiring
03/22/2018CompletePOLO ELECTRIC CORP. D/B/AGeneral Wiring
1 project · most recent 02/06/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/06/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
06/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/30/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2023Fail-Final Shed WithdrawalFailView ↗
09/12/2023Fail-Final Shed WithdrawalFailView ↗
09/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
11/15/2024Fire-Resistant Penetrations and JointsMichael Zenreichspecial
10/31/2024FinalSALVATOR CARADONNAprogress
10/23/2024FinalWILLIAM FITZJOHNprogress
10/23/2024Subgrade InspectionsWILLIAM FITZJOHNspecial
10/23/2024Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
10/23/2024Structural Steel - High Strength BoltingWILLIAM FITZJOHNspecial
10/23/2024Structural Steel - WeldingWILLIAM FITZJOHNspecial
10/23/2024Structural Steel - DetailsWILLIAM FITZJOHNspecial
10/23/2024Sprayed fire-resistant materialsWILLIAM FITZJOHNspecial
10/23/2024Concrete - Cast-In-PlaceWILLIAM FITZJOHNspecial
10/15/2024Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
10/15/2024Concrete - Cast-In-PlaceWILLIAM FITZJOHNspecial
10/15/2024Subgrade InspectionsWILLIAM FITZJOHNspecial
10/15/2024Structural Steel - WeldingWILLIAM FITZJOHNspecial
10/15/2024Structural Steel - High Strength BoltingWILLIAM FITZJOHNspecial
10/15/2024Structural Steel - DetailsWILLIAM FITZJOHNspecial
10/15/2024Sprayed fire-resistant materialsWILLIAM FITZJOHNspecial
10/15/2024FinalWILLIAM FITZJOHNprogress
09/20/2024Fire-Resistant Penetrations and JointsAndrew Ciarniellospecial
09/20/2024Sprinkler SystemsNicolas Crosettospecial
09/13/2024Fire-Resistant Penetrations and JointsMichael Zenreichspecial
09/12/2024FinalMichael Zenreichprogress
09/12/2024Fire-Resistant Penetrations and JointsMichael Zenreichspecial
07/10/2024Sprinkler SystemsNicolas Crosettospecial
07/10/2024Fire-Resistant Penetrations and JointsAndrew Ciarniellospecial
Latest 25 of 54.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Simons FoundationOfficeFloor 10
Project M00904336 Alteration · LOC Issued · 08/01/2023
Project M00904345 Alteration · LOC Issued · 08/01/2023
Flatiron InstituteOfficeFloors 2, 7, 11, 12
Project M00635475 Alteration · LOC Issued · 12/27/2021
Project M00635493 Alteration · LOC Issued · 12/27/2021
Project M00635513 Alteration · LOC Issued · 12/27/2021
Project M00265055 No Work · TA Certificate of Operation Issued · 11/15/2019
Project M00265156 No Work · TA Certificate of Operation Issued · 11/15/2019
Project M00203179 No Work · TA Certificate of Operation Issued · 08/01/2019
Project M00203199 No Work · TA Certificate of Operation Issued · 08/01/2019
Project M00161715 No Work · TA Certificate of Operation Issued · 05/16/2019
Project M00161706 No Work · TA Certificate of Operation Issued · 05/06/2019
Project M00126126 No Work · TA Certificate of Operation Issued · 02/04/2019
Project M00113048 No Work · TA Certificate of Operation Issued · 01/03/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,607 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch40
09/03/2026M00635513-P1Request digital key ↗
09/03/2026M00635513-I1Request digital key ↗
09/02/2026M00680973-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly11
09/05/2026M00126126-I1Request digital key ↗
09/05/2026M00161715-I1Request digital key ↗
09/05/2026M00203179-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026M00129530-P1Request digital key ↗
08/14/2026M00129530-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00156593-I1Request digital key ↗
▸Applications & Permits325
▸BISPLAN / WORK APPROVAL APPLICATION155
07/23/2024123199109Open ↗
06/18/2024123199109Open ↗
05/10/2024122794556Open ↗
Showing 3 of 155 on file for this type
▸BISWORK PERMIT APPLICATION138
03/08/2022141008022Open ↗
02/17/2021102564164Open ↗
03/27/2019123023101Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWLPC Approval/Permit27
08/29/2026M00925010-I1Open ↗
08/29/2026M00925010-S3Open ↗
08/29/2026M00925010-P2Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY4
10/19/2020123141199Open ↗
03/13/2020123141206Open ↗
Showing 2 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/23/2024123199109Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications398
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION214
10/15/2021122984896Open ↗
02/17/2021102564164Open ↗
02/17/2021102564164Open ↗
Showing 3 of 214 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/05/2026M00113056-I1Open ↗
09/05/2026M00126143-I1Open ↗
09/05/2026M00129530-I1Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT35
03/05/2022141008022Open ↗
Showing 1 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026M00875984-I1Open ↗
09/23/2026M00789000-I1Open ↗
09/23/2026M00789000-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00904336-I1Open ↗
09/01/2026M00925010-P4Open ↗
09/01/2026M01023164-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/05/2022141008022Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/05/2022141008022Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment129
▸BISSELF-CERT PLUMBING NOTICE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
02/17/2021102564164Open ↗
03/13/2019122794556Open ↗
03/12/2019122794556Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS13
02/17/2021102564164Open ↗
02/17/2021102564164Open ↗
Showing 2 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
01/16/2020122984896Open ↗
12/16/2019122797795Open ↗
11/20/2019122797919Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026M00875984-I1Open ↗
08/13/2026M00875984-P1Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos111
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/03/2026M00635461-I1Open ↗
09/03/2026M00635513-P1Open ↗
09/03/2026M00635513-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
02/17/2021102564164Open ↗
Showing 1 of 28 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
05/28/2019123178694Open ↗
Showing 1 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE4
06/28/2018122900450Open ↗
Showing 1 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)2
03/13/2020123141206Open ↗
03/13/2020123141206Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER11
01/16/2020122984896Open ↗
01/16/2020122984896Open ↗
01/16/2020122984896Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/05/2022141008022Open ↗
03/05/2022141008022Open ↗
Showing 2 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
10/19/2020123141199Open ↗
03/13/2020123141206Open ↗
▸Approvals, Objections & Sign-offs187
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST57
01/06/2025141008022Open ↗
05/13/2024122794556Open ↗
05/13/2024123242650Open ↗
Showing 3 of 57 on file for this type
▸BISLANDMARKS APPROVAL53
03/05/2022141008022Open ↗
02/17/2021102564164Open ↗
02/17/2021102564164Open ↗
Showing 3 of 53 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
10/19/2020123141199Open ↗
09/21/2020122984896Open ↗
01/16/2020122984896Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/03/2026M00635461-I1Open ↗
09/03/2026M00635513-I1Open ↗
09/03/2026M00635513-P1Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/08/2023122984896Open ↗
12/27/2019122984896Open ↗
Showing 2 of 5 on file for this type
▸BISLANDMARKS SIGNOFF5
05/07/2024122908498Open ↗
04/26/2024122843548Open ↗
04/24/2024123242650Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
01/04/2025141008022Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
12/12/2019122984896Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership134
▸BISCOST AFFIDAVIT116
03/28/2024122908498Open ↗
03/05/2022141008022Open ↗
10/04/2019121283850Open ↗
Showing 3 of 116 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW310
01/02/2025141008022Open ↗
08/29/2024122843557Open ↗
05/06/2024122908498Open ↗
Showing 3 of 10 on file for this type
▸BISDEPT OF FINANCE VERIFICATION5
02/25/2020122984896Open ↗
02/25/2020122984896Open ↗
Showing 2 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms132
▸BISEFILING COVER SHEET83
07/12/2018123475337Open ↗
Showing 1 of 83 on file for this type
▸BISADDITIONAL INFORMATION27
01/10/2020122984896Open ↗
11/29/2019140632199Open ↗
09/09/2019122984896Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM20
10/15/2021122984896Open ↗
03/12/2020122984896Open ↗
01/02/2020121224148Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/05/2022141008022Open ↗
Showing 1 of 2 on file for this type
▸Other Documents32
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
10/19/2020123141199Open ↗
10/19/2020123141199Open ↗
10/19/2020123141199Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProof of Historic Building9
08/29/2026M00925010-I1Open ↗
08/14/2026M00925010-P1Open ↗
08/13/2026M00875984-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPRELIMINARY2
07/05/2023122829109Open ↗
07/05/2023122829109Open ↗
▸DOB NOWCalculations2
08/13/2026M01000058-I1Open ↗
08/13/2026M01000989-I1Open ↗
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01000058-I1Open ↗
08/13/2026M01000989-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00156593-I1Open ↗