← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Trafalgar House
188 EAST 70TH STREET · BIN 1042610
💬 Discuss this project
1986Year Built
31Stories
RMBuilding Class
C1-9Zoning
124,816 sfGross Floor Area
106Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 188 East 70th St Condo · 7,531 sf lot · 16.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold installationUnder Construction3p · 3 filings · 17 docs
Floor 311 filing · 3 docs
Floor 30Unit 30B1p · 2 filings · 6 docs
Floor 29
Floor 28
Floor 27
Floor 26Corner repair3p · 1 filing · 5 docs
Floor 25Corner repair3p · 1 filing · 5 docs
Floor 24Corner repair3p · 1 filing · 5 docs
Floor 23Corner repair3p · 1 filing · 5 docs
Floor 22
Floor 21
Floor 20
Floor 19Unit 19C, Unit 19AB9p · 2 filings · 16 docs
Floor 18Unit 18A3p · 1 filing · 6 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9C7p · 3 filings · 15 docs
Floor 8
Floor 7Unit 7B4p · 2 filings · 7 docs
Floor 6Unit 6BCUnder Construction3p · 1 filing · 7 docs
Floor 5Unit 5C9p · 2 filings · 8 docs
Floor 4Unit 4B11p · 2 filings · 17 docs
Floor 3Unit 3D3p · 1 filing · 4 docs
Floor 2
Floor 1Moscot, Gloss Lab19p · 5 filings · 20 docs
Site & exteriorFedExOffice, MoscotUnder Construction14p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
188 East 70th Street Condo3303/22/2026
188 E 70 St Condo Association603/21/2026
Friedland Realty603/21/2026
Rumble Fitness507/08/2026
S&E Maintenance203/21/2026
Telyas Realty203/21/2026
188_East 70 Apt203/21/2026
Harrison103/22/2026
His NY2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services208/16/2026
Atelier New York Architecture208/14/2026
RMM Design Studio201/23/2026
GRM Consultants310/09/2025
Mohammad Ahead, PE402/20/2025
Tecc Solutions211/26/2024
Lloyd Fruchtman, RA111/21/2024
Zelta Design505/08/2023
Midtown Preservation103/31/2023
CO4ARCHITECTURE105/02/2022
John P. Fox, Architect203/03/2022
SSA+D412/14/2021
Jack Green Associates111/18/2021
Napach Design Group107/15/2021
FMC Engineering107/15/2021
Lab Architecture106/04/2021
F.p.villano Consulting Engineering102/19/2021
J.A.M. Associates202/11/2021
Joel Phagoo P.E109/11/2020
Hamann Engineering102/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Agouti Construction Consulting403/21/2026
Louis Striar1603/21/2026
Archetype Consultants603/21/2026
KC Expediting403/21/2026
Cornerstone Consulting203/21/2026
GC Expediting503/21/2026
Napach Design Group103/21/2026
Epac Building Consulting1003/21/2026
Big Orange Expediting203/21/2026
P.wolfe Consultants203/21/2026
A1 Expediting Service203/21/2026
Midtown Preservation Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
James Paul Joplin BuilderGeneral Contractor407/08/2026
City SignsSign hanger407/08/2026
EC FramingGeneral Contractor407/08/2026
HRBDX New YorkGeneral Contractor407/08/2026
All Pro Plumbing & HeatingPlumbing307/08/2026
DNP BuildersGeneral Contractor307/08/2026
Dynamic InstallationScaffold303/21/2026
Signstar NYCSign hanger307/08/2026
Beem NYCGeneral Contractor303/21/2026
Andamio ScaffoldingScaffold208/18/2026
Steinway Awning IIspecialty_contractor203/21/2026
Walter J.grande P & HPlumbing207/08/2026
DH Eagle Plumbing & HeatingPlumbing207/08/2026
Cam Energy Heating & MechanicalPlumbing107/08/2026
P.S.I. MechanicalPlumbing109/26/2026
Solution Mechanical ContngPlumbing107/08/2026
Argon ElectricalElectrical103/22/2026
ZFMPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
AL-Wes Electric ServicesElectrical103/21/2026
Power Surge ElectricElectrical103/21/2026
Norlin Electrical ContractorsElectrical103/21/2026
Centennial Elevator IndustriesElectrical103/21/2026
T. McCaffrey-T. McGovernElectrical103/22/2026
AM&G Waterproofingspecialty_contractor107/08/2026
Asa Building MaintenanceGeneral Contractor107/08/2026
D Casamento & SonGeneral Contractor108/21/2026
KC ExpeditingGeneral Contractor104/09/2026
NYC Design & RenoGeneral Contractor107/08/2026
Tollocan Sheet Metalspecialty_contractor107/08/2026
Authentic PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atelier NY Architecture2438208/14/2026
Urban Integrations7993103/25/2026
World Design Architecture9323201/23/2026
Tecc Designs and Solution7184211/26/2024
AK Engineering678311/26/2024
Midtown Preservation Architects2634103/31/2023
O'Rourke Engineering5873103/03/2022
Saharat Surattanont Architects1779412/14/2021
Jack Green Associates422111/18/2021
Zelta Inspection7764109/28/2021
Napach Architectu2945107/15/2021
Lab Architecture3653106/04/2021
Hamann Engineering4949102/11/2020
Building Lifecycle
All (224)Filed (39)Permit Issued (39)Signed Off (26)Facade (FISP) (15)Violation (43)Inspection (14)Objection (18)Special Inspection (30)
10/09/2026
Cycle 10 facade report signed — SWARMP
10/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2026
Permit issued — Plumbing
M01445628-S1-PL
09/01/2026
Cycle 10 facade report submitted
08/25/2026
Cycle 10 facade inspection completed
08/20/2026
Permit issued — General Construction
M01445628-I1-GC
08/17/2026
Permit issued — Sidewalk Shed
M01443002-I1-SH
08/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01443002-I1
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01443001-I1
08/14/2026
Filed — Alteration
PLUMBING WORK IN APT 6BC AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01445628-I1
08/14/2026
Filed — Alteration
PLUMBING WORK IN APT 6BC AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01445628-S1
08/14/2026
Permit issued — Protection and Mechanical Methods
M01443001-I1-PMM
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kenneth Hudes
06/22/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00636415. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
M00636444-I1
05/05/2026
Signed off — Alteration
Plumbing work to retail space on part of the 1st floor (Moscot) as indicated on drawings.
M01110092-I1
04/20/2026
Signed off — Alteration
FILING FOR GENERAL CONSTRUCTION WORK AS PER PLANS AND ACCORDING TO TPPN03/97
M01334988-S1
04/20/2026
Signed off — Alteration
FILING FOR GENERAL CONSTRUCTION WORK AS PER PLANS AND ACCORDING TO TPPN03/97
M01334988-I1
04/06/2026
Permit issued — Suspended Scaffold
M01374230-I1-SC
03/25/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection as per plan submitted. No change to egress or occupancy.
M01374230-I1
03/12/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Permit issued — General Construction
M01334988-I1-GC
02/02/2026
Permit issued — Plumbing
M01334988-S1-PL
01/23/2026
Filed — Alteration
FILING FOR GENERAL CONSTRUCTION WORK AS PER PLANS AND ACCORDING TO TPPN03/97
M01334988-S1
01/23/2026
Filed — Alteration
FILING FOR GENERAL CONSTRUCTION WORK AS PER PLANS AND ACCORDING TO TPPN03/97
M01334988-I1
01/12/2026
Signed off — Alteration
M01293061-I1
01/12/2026
Signed off — Alteration
REPLACEMENT FACE OF EXISTING ILLUMINATED NON-ADVERTISING ACCESSORY SIGN CABINET - IN PROPERTY LINES - FEDEX OFFICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01293062-I1
01/12/2026
Signed off — Alteration
M01293063-I1
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/17/2025
Permit issued — Sign
M01293062-I1-SG
10/16/2025
Permit issued — Sign
M01293063-I1-SG
10/16/2025
Permit issued — Sign
M01293061-I1-SG
10/09/2025
Filed — Alteration
M01293061-I1
10/09/2025
Filed — Alteration
REPLACEMENT FACE OF EXISTING ILLUMINATED NON-ADVERTISING ACCESSORY SIGN CABINET - IN PROPERTY LINES - FEDEX OFFICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01293062-I1
10/09/2025
Filed — Alteration
M01293063-I1
10/09/2025
Special inspection requirement — Final
GHANENDRA MISHRA
07/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2025
Signed off — Alteration
Architectural work to retail space on part of the 1st floor (Moscot) as indicated on drawings.
M01110062-I1
06/09/2025
Signed off — Alteration
M01110084-I1
04/10/2025
Signed off — Alteration
M01180116-I1
04/10/2025
Signed off — Alteration
REPLACEMENT FACE OF ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - (LOGO GLASSES). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180115-I1
04/10/2025
Signed off — Alteration
REPLACEMENT FACE OF ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180117-I1
04/10/2025
Signed off — Alteration
REPLACEMENT FACE OF NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180118-I1
03/13/2025
Permit issued — Sign
M01180118-I1-SG
03/05/2025
Permit issued — Sign
M01180116-I1-SG
03/05/2025
Permit issued — Sign
M01180115-I1-SG
03/05/2025
Permit issued — Sign
M01180117-I1-SG
03/03/2025
Permit issued — Plumbing
M01110092-I1-PL
02/20/2025
Filed — Alteration
M01180116-I1
02/20/2025
Filed — Alteration
REPLACEMENT FACE OF ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - (LOGO GLASSES). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180115-I1
02/20/2025
Filed — Alteration
REPLACEMENT FACE OF ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180117-I1
02/20/2025
Filed — Alteration
REPLACEMENT FACE OF NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING CABINET - IN PROPERTY LINES - MOSCOT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01180118-I1
02/20/2025
Special inspection requirement — Final
MOHAMMAD AHEAD
12/11/2024
Permit issued — Mechanical Systems
M01110084-I1-MS
12/10/2024
Permit issued — General Construction
M01110062-I1-GC
11/26/2024
Filed — Alteration
Plumbing work to retail space on part of the 1st floor (Moscot) as indicated on drawings.
M01110092-I1
11/26/2024
Filed — Alteration
M01110084-I1
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical09/25/2026
DOB NOWGeneral ConstructionPermit IssuedD Casamento & Son08/20/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding08/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAndamio Scaffolding08/14/2026
DOB NOWSuspended ScaffoldPermit IssuedAM&G Waterproofing04/06/2026
DOB NOWGeneral ConstructionSigned-offKC Expediting02/03/2026
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating02/02/2026
DOB NOWSignSigned-offSignstar NYC10/17/2025
DOB NOWSignSigned-offSignstar NYC10/16/2025
DOB NOWSignSigned-offSignstar NYC10/16/2025
DOB NOWSignSigned-offElmer Dawson03/13/2025
DOB NOWSignSigned-offElmer Dawson03/05/2025
DOB NOWSignSigned-offElmer Dawson03/05/2025
DOB NOWSignSigned-offElmer Dawson03/05/2025
DOB NOWPlumbingSigned-offSolution Mechanical Contng03/03/2025
DOB NOWMechanical SystemsSigned-offDNP Builders12/11/2024
DOB NOWGeneral ConstructionSigned-offDNP Builders12/10/2024
DOB NOWMechanical SystemsSigned-offHRBDX New York01/16/2024
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing06/15/2023
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating10/04/2022
DOB NOWPlumbingSigned-offZefi Mechanical04/08/2022
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance04/07/2022
DOB NOWGeneral ConstructionSigned-offJames Paul Joplin Builder03/11/2022
DOB NOWMechanical SystemsPermit IssuedTollocan Sheet Metal01/26/2022
DOB NOWPlumbingSigned-offAuthentic Plumbing01/25/2022
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno01/12/2022
DOB NOWPlumbingSigned-offL.spina Plumbing & Heating11/19/2021
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating09/16/2021
DOB NOWPlumbingPermit IssuedCam Energy Heating & Mechanical08/18/2021
DOB NOWGeneral ConstructionSigned-offHRBDX New York07/29/2021
DOB NOWGeneral ConstructionSigned-offSteinway Awning II07/27/2021
DOB NOWGeneral ConstructionSigned-offEC Framing07/22/2021
DOB NOWMechanical SystemsPermit IssuedEC Framing07/21/2021
DOB NOWGeneral ConstructionSigned-offBeem NYC07/19/2021
DOB NOWGeneral ConstructionSigned-offJames Paul Joplin Builder07/19/2021
DOB NOWPlumbingSigned-offWalter J.grande P & H01/29/2021
DOB NOWSidewalk ShedPermit IssuedDynamic Installation09/14/2020
DOB NOWPlumbingSigned-offL.spina Plumbing & Heating02/18/2020
DOB NOWPlumbingSigned-offWalter J.grande P & H02/14/2020
BISOTISSUEDElite Choice Construction02/18/2022
+ 49 more permits on file
2 projects · most recent 11/18/2021
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/18/2021Permit IssuedTollocan Sheet MetalAir Conditioning Systems
Cooling
Florida Heat Pump LV048 1,200 CFM · Wshp ×1
07/15/2021Permit IssuedEC FramingAir Conditioning Systems, Ventilation Systems
Cooling
Florida Heat Pump LV042-HZ 40,200 BTU · Wshp ×1
Ventilation
Greenheck CSP-A710-VG 600 CFM · Exhaust Fan ×1
3 projects · most recent 08/14/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/14/2026Permit IssuedP.S.I. MechanicalWater/Sanitary
12/14/2021Signed-offS.O.S. Plumbing & HeatingWater/Sanitary
06/23/2021Permit IssuedP.R. Plumbing & HeatingGas, Water/Sanitary
21 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedBorowide Elect'l Contractors—
06/11/2025CompleteYork Electrical ContractorsGeneral Wiring
06/05/2025CompleteDenmar ElectricGeneral Wiring
03/07/2025CompleteShelby Electrical—
02/04/2025Permit IssuedM&T ElectricalGeneral Wiring
09/11/2024CompleteOstrava Electric—
01/27/2023Permit IssuedPaul M. & Son's Electrical ConGeneral Wiring
01/19/2023CompleteArgon ElectricalGeneral Wiring
06/27/2022Permit IssuedAjf ElectricGeneral Wiring
09/10/2020Permit IssuedRichard Neu—
06/17/2020CompleteLens ElectricGeneral Wiring
02/17/2020CompleteEis Electric Corp DbaGeneral Wiring
02/12/2020CompleteY.S. ElectricGeneral Wiring
02/06/2020CompleteHI-Tech Wiring Electrical ServicesGeneral Wiring
11/14/2019Permit IssuedL&B Electrical International12 meters, 1 new_meters
2 projects · most recent 08/16/2026
Sidewalk Shed
FiledStatusContractorScope
08/16/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
09/11/2020Permit IssuedDynamic InstallationSidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
10/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/19/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/13/2026Tenant Protection Plan ComplianceKenneth Hudesspecial
12/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
10/09/2025FinalGHANENDRA MISHRAprogress
02/20/2025FinalMOHAMMAD AHEADprogress
09/18/2024Fire-Resistant Penetrations and JointsARTHUR NISONOVspecial
09/12/2024Tenant Protection Plan ComplianceAri Kamospecial
09/12/2024Tenant Protection Plan ComplianceAri Kamospecial
09/12/2024Tenant Protection Plan ComplianceAri Kamospecial
09/11/2024FinalLLOYD FRUCHTMANprogress
09/11/2024Mechanical SystemsARTHUR NISONOVspecial
09/11/2024FinalARTHUR NISONOVprogress
03/23/2023FinalMichael Sleimanprogress
03/23/2023Tenant Protection Plan ComplianceMichael Sleimanspecial
04/15/2022Final—progress
12/13/2021HVAC-R and service water piping design and insulationJACK GREENenergy_progress
12/13/2021Maintenance informationJACK GREENenergy_progress
12/13/2021HVAC-R and service water heating equipmentJACK GREENenergy_progress
12/13/2021HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/10/2021Mechanical SystemsJACK GREENspecial
11/10/2021FinalJACK GREENprogress
07/14/2021Lighting controlsJOEL NAPACHenergy_progress
07/14/2021Interior lighting powerJOEL NAPACHenergy_progress
07/14/2021Maintenance informationJOEL NAPACHenergy_progress
07/14/2021HVAC-R and service water piping design and insulationJOEL NAPACHenergy_progress
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FedExOfficeRetail—
Project M01293061 Alteration · LOC Issued · 10/09/2025
Project M01293062 Alteration · LOC Issued · 10/09/2025
Project M01293063 Alteration · LOC Issued · 10/09/2025
MoscotRetailFloor 1
Project M01180115 Alteration · LOC Issued · 02/20/2025
Project M01180116 Alteration · LOC Issued · 02/20/2025
Project M01180117 Alteration · LOC Issued · 02/20/2025
Project M01180118 Alteration · LOC Issued · 02/20/2025
Project M01110084 Alteration · LOC Issued · 11/26/2024
Project M01110092 Alteration · LOC Issued · 11/26/2024
Project M01110062 Alteration · LOC Issued · 11/21/2024
Gloss LabPersonal servicesFloor 1
Project M00557168 Alteration · LOC Issued · 07/15/2021
Project M00557506 Alteration · Permit Entire · 07/15/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 767 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch34
09/03/2026M00542978-I1Request digital key ↗
09/03/2026M00557506-I1Request digital key ↗
09/03/2026M00557168-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00310518-I1Request digital key ↗
09/04/2026M00279822-P1Request digital key ↗
09/04/2026M00279822-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00448200-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00395022-I1Request digital key ↗
▸Applications & Permits131
▸BISWORK PERMIT APPLICATION65
02/18/2022140996386Open ↗
08/17/2021123837303Open ↗
07/31/2020123870613Open ↗
Showing 3 of 65 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION65
07/29/2025123698187Open ↗
07/18/2025102970055Open ↗
07/09/2025102970055Open ↗
Showing 3 of 65 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications173
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
02/06/2020123791496Open ↗
02/06/2020123791496Open ↗
02/03/2020123870613Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/04/2026M00279822-P1Open ↗
09/04/2026M00279822-I1Open ↗
09/04/2026M00448200-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/06/2026M01110062-I1Open ↗
09/02/2026M00628577-I1Open ↗
09/02/2026M00628577-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
10/30/2019123698187Open ↗
Showing 1 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/06/2026M01110062-I1Open ↗
10/06/2026M01110062-I1Open ↗
09/02/2026M00628577-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/30/2019123698187Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/10/2021140996386Open ↗
04/10/2020140895654Open ↗
03/27/2019140837824Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/10/2021140996386Open ↗
▸Trade Schedules & Equipment51
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
02/13/2020123837303Open ↗
01/30/2020123837303Open ↗
06/19/2019122923827Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes9
02/06/2020123791496Open ↗
10/30/2019123698187Open ↗
07/16/2019123837303Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00279822-I1Open ↗
09/04/2026M00279822-P1Open ↗
08/13/2026M00310518-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/04/2026M00279822-I1Open ↗
09/04/2026M00279822-P1Open ↗
09/04/2026M00448200-I1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
04/10/2020140895654Open ↗
02/06/2020123791496Open ↗
10/30/2019123698187Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00531670-I1Open ↗
▸Energy Compliance74
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
02/06/2020123791496Open ↗
02/03/2020123870613Open ↗
11/29/2019123837303Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
04/28/2023140837824Open ↗
09/17/2020123588046Open ↗
07/31/2019122923827Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
04/28/2023140837824Open ↗
09/14/2021123837303Open ↗
07/29/2021140895654Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.7
09/03/2026M00557168-I1Open ↗
09/03/2026M00512206-I1Open ↗
09/03/2026M00590006-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
07/21/2025123698187Open ↗
09/14/2021123837303Open ↗
07/29/2021140895654Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/21/2025123698187Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/23/2021123791496Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/21/2025123698187Open ↗
▸BISLIGHTING CONTROLS1
07/21/2025123698187Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY25
07/29/2025102970055Open ↗
07/29/2025102970055Open ↗
04/28/2023140837824Open ↗
Showing 3 of 25 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/21/2025123698187Open ↗
08/09/2024120189205Open ↗
▸BISMECHANICAL SYSTEMS1
08/08/2024120189205Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPOST-INSTALLED ANCHORS1
06/23/2021123791496Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
07/30/2025102970055Open ↗
07/29/2025123698187Open ↗
08/12/2024120189205Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
07/21/2025123698187Open ↗
08/09/2024120189205Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01374230-I1Open ↗
▸Cost, Insurance & Ownership68
▸BISCOST AFFIDAVIT62
07/30/2025102970055Open ↗
07/29/2025102970055Open ↗
04/28/2023140837824Open ↗
Showing 3 of 62 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
07/21/2025123698187Open ↗
08/06/2024120189205Open ↗
09/14/2021123837303Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/20/2019123588046Open ↗
▸Filing & Intake Forms66
▸BISEFILING COVER SHEET28
02/06/2020123791496Open ↗
10/30/2019123698187Open ↗
06/17/2019123588046Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION21
07/29/2025123698187Open ↗
10/05/2021123870613Open ↗
02/04/2021123791496Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM13
02/13/2020123837303Open ↗
01/30/2020123837303Open ↗
12/10/2019123837303Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/10/2021140996386Open ↗
04/10/2020140895654Open ↗
Showing 2 of 4 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/18/2025102970055Open ↗
02/04/2021123791496Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPT. COMBO COMPLTD UNDER 121842177/120266247 IN CONJ. W/PL S/O 03/04/991
04/26/2024101465139Open ↗
▸DOB NOWCalculations1
08/13/2026M01374230-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01374230-I1Open ↗