| Owner | Filings | Most Recent |
|---|---|---|
| HADDAD APPAREL GROUP | 53 | 09/25/2026 |
| JC CONSULTING MGMT | 4 | 09/13/2026 |
| PPF OFF TWO PARK AVENUE OWNER | 947 | 07/08/2026 |
| HADSON 2 PARK AVE LLC | 1 | 03/22/2026 |
| CLUME CONSTRUCTION CO LP | 2 | 03/22/2026 |
| PPFOFF 2 PARK AVE OWNER | 10 | 03/22/2026 |
| PPF TWO PARK AVENUE OWNER LL | 4 | 03/22/2026 |
| L L HOLDING COMPANY | 224 | 03/22/2026 |
| 2 PARK AVENUE | 6 | 03/22/2026 |
| EAGLE SCAFFOLDING SERVICE | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/27/2024 | $357.0M | — | — → — | $419/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| SOUTHERN CONSULTING ENGINEERING PC | 14 | 08/19/2026 |
| SEVERUD ASSOCIATES | 1 | 05/14/2026 |
| MOONSHINE STUDIO | 8 | 04/25/2026 |
| JAC ENGINEERING DPC | 1 | 04/22/2026 |
| ABS ENGINEERING, PLLC | 84 | 03/31/2026 |
| STUDIO HUJI | 2 | 03/31/2026 |
| ABC ENGINEERING PLLC | 5 | 02/27/2026 |
| SCOTT LASKY ARCHITECT | 2 | 02/13/2026 |
| DESIGN REPUBLIC | 29 | 12/11/2024 |
| - | 2 | 07/26/2024 |
| ROBERT DERECTOR ASSOCIATES | 3 | 07/23/2024 |
| TPG ARCHITECTURE, LLP | 2 | 07/17/2024 |
| JACOB FEINBERG KATZ & MICHAELI CONS | 3 | 06/26/2024 |
| GORDON H. SMITH CORPORATION | 1 | 06/24/2024 |
| WJE ENGINEERS & ARCHITECTS, P.C. | 13 | 05/29/2024 |
| WISS, JANNEY, ELSTNER ASSOCIATES | 7 | 05/22/2024 |
| MERRITT ENGINEERING CONSULTANTS, DPC | 3 | 04/15/2024 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 04/03/2024 |
| GENSLER | 6 | 02/01/2024 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 1 | 10/10/2023 |
| JOHN P. FOX, ARCHITECT, PC. | 1 | 10/06/2023 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 07/11/2023 |
| MG ENGINEERING D.P.C. | 5 | 04/13/2023 |
| ENTHINK ENGINEERS LLC | 3 | 01/20/2023 |
| CTHREE ARCHITECTURE + DESIGN, PC | 1 | 12/02/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| BURNHAM NATIONWIDE INC | 166 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 4 | 03/21/2026 |
| PROACTIVE BUILDING SOLUTIONS | 50 | 03/21/2026 |
| ABC ENGINEERING PLLC | 10 | 03/21/2026 |
| RIGGINING CONSULTANTS | 3 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 2 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CLUNE CONSTRUCTION CO LP | General Contractor | 105 | 07/08/2026 |
| JC CONSULTING & MANAGEMENT | General Contractor | 31 | 09/25/2026 |
| STRUCTURE TONE, LLC | General Contractor | 18 | 07/08/2026 |
| TALISEN CONSTRUCTION CORP | General Contractor | 15 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 14 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 10 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 9 | 07/08/2026 |
| PETRETTI & ASSOCIATES LLC | General Contractor | 8 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| GEMSTAR CONSTRUCTION CORP. | General Contractor | 7 | 07/08/2026 |
| BLACK BULL BULDERS LLC | General Contractor | 7 | 07/08/2026 |
| WHALEN CONSTRUCTION, INC | General Contractor | 7 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 5 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 5 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 4 | 03/21/2026 |
| DONATO PLUMBING, INC | Plumbing | 4 | 07/08/2026 |
| NATIONWIDE MECHANICAL INC | Plumbing | 4 | 07/08/2026 |
| CS BRIDGE CORP | General Contractor | 4 | 03/21/2026 |
| ANFIELD INTERIORS INC | General Contractor | 4 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 4 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 3 | 03/21/2026 |
| GO PRO FIRE PROTECTION C | Fire Protection | 3 | 07/08/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 3 | 07/08/2026 |
| GLOBAL FACILITY MANAGEMENT | General Contractor | 3 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 146 | 08/19/2026 |
| S&S CONCRETE & SOIL TESTI | 1008 | 18 | 05/14/2026 |
| ABC ENGINEERING PLLC | 1515 | 2 | 02/27/2026 |
| SOCOTEC ENGINEERING | 4983 | 1 | 07/12/2024 |
| BEASLEY CHIN & HUNDERMAN | 1238 | 1 | 05/22/2024 |
| ANDREW KATZ | 1030 | 1 | 05/10/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEMENT | 09/24/2026 |
| DOB NOW | Sprinklers | Signed-off | UNITED FIRE PROT CORP | 05/29/2026 |
| DOB NOW | Structural | Permit Issued | JC CONSULTING & MANAGEMENT | 05/20/2026 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEMENT | 04/22/2026 |
| DOB NOW | Plumbing | Signed-off | PIPEWORKS NYC INC | 04/02/2026 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 03/31/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JC CONSULTING & MANAGEME* | 03/06/2026 |
| DOB NOW | Construction Fence | Signed-off | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | Construction Fence | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 03/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JC CONSULTING & MANAGEME* | 02/18/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 02/09/2026 |
| DOB NOW | Plumbing | Signed-off | XH&RC PLBG AND HTG INC | 01/14/2026 |
| DOB NOW | General Construction | Signed-off | XH&RC PLUMBING HEATING | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 12/30/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 12/03/2025 |
| DOB NOW | Standpipe | Signed-off | MORA FIRE PROTECTION LLC | 12/03/2025 |
| DOB NOW | Construction Fence | Signed-off | JC CONSULTING & MANAGEME* | 09/24/2025 |
| DOB NOW | Construction Fence | Permit Issued | JC CONSULTING & MANAGEME* | 09/24/2025 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 08/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JC CONSULTING & MANAGEME* | 08/18/2025 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 08/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 08/18/2025 |
| DOB NOW | Structural | Signed-off | CLUNE CONSTRUCTION CO LP | 08/18/2025 |
| DOB NOW | Sprinklers | Signed-off | GO PRO FIRE PROTECTION C | 08/14/2025 |
| DOB NOW | Plumbing | Signed-off | MORA FIRE PROTECTION LLC | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JC CONSULTING & MANAGEME* | 08/13/2025 |
| DOB NOW | Plumbing | Signed-off | MORA FIRE PROTECTION LLC | 08/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JC CONSULTING & MANAGEME* | 07/22/2025 |
| DOB NOW | General Construction | Permit Issued | JC CONSULTING & MANAGEME* | 07/07/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 03/21/2025 |
| DOB NOW | Structural | Signed-off | CLUNE CONSTRUCTION CO LP | 03/20/2025 |
| DOB NOW | General Construction | Signed-off | JC CONSULTING & MANAGEME* | 03/07/2025 |
| DOB NOW | Sprinklers | Signed-off | ANTHONY DISABATO | 03/04/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/14/2026 | Permit Issued | JC CONSULTING & MANAGEME* | Others | Other Greenheck CSP-A510-VG 545 CFM · Exhaust Fan ×5 |
| 09/19/2025 | Signed-off | JC CONSULTING & MANAGEME* | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MSZ-GX24NL 22,794 BTU · Fan Coil Indoor ×4 MUZ-GX24NL 22,794 BTU · Condensing Unit ×4 PKFY-L24NKMU-A 20,636 BTU · Vrf Indoor ×4 MXZ-SM48NL 41,273 BTU · Condensing Unit ×2 |
| 04/02/2021 | Signed-off | JKT CONSTRUCTION INC | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2026 | Signed-off | PSI PARTNERS, LLC | Sprinkler System |
| 09/25/2020 | — | — | 1 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2026 | — | — | Water/Sanitary |
| 02/27/2026 | Signed-off | XH&RC PLBG AND HTG INC | Water/Sanitary |
| 01/02/2026 | — | — | Water/Sanitary |
| 09/25/2020 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/21/2026 | Permit Issued | HI-RITE ELECTRIC CORP | General Wiring |
| 02/21/2025 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 02/06/2025 | Permit Issued | LND ELECTRIC LLC | General Wiring |
| 08/28/2024 | Complete | EPIC ELECTRIC INC | General Wiring |
| 08/21/2024 | Complete | EPIC ELECTRIC INC | General Wiring |
| 07/26/2024 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 04/16/2024 | Complete | CONTROL ELEC'L CONT'G COR | General Wiring |
| 04/16/2024 | Permit Issued | CONTROL ELEC'L CONT'G COR | — |
| 04/07/2024 | Complete | EPIC ELECTRIC INC | General Wiring |
| 11/06/2023 | Complete | EMPIRE STATE ELEC MAINT & | — |
| 10/23/2023 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 08/01/2023 | Complete | ALL SYSTEMS ELECTRIC NY L | General Wiring |
| 06/21/2023 | Complete | ECO ELECTRICAL SERVCS LLC | General Wiring |
| 04/24/2023 | Complete | EMPIRE STATE ELEC MAINT & | — |
| 11/28/2022 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2026 | Permit Issued | JC CONSULTING & MANAGEME* | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2025 | Permit Issued | JC CONSULTING & MANAGEME* | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/11/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/12/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 03/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/06/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/06/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 12/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/30/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/04/2026 | Structural Steel - Details | GLEN LANGER | special |
| 05/04/2026 | Final | GLEN LANGER | progress |
| 04/28/2026 | Final | GLEN LANGER | progress |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | GLEN LANGER | special |
| 04/15/2026 | Sprinkler Systems | GLEN LANGER | special |
| 03/31/2026 | Mechanical Systems | GLEN LANGER | special |
| 03/31/2026 | Final | GLEN LANGER | progress |
| 03/31/2026 | Post-installed Anchors | GLEN LANGER | special |
| 03/18/2026 | Fire-Resistant Penetrations and Joints | HUI ZENG | special |
| 03/13/2026 | Final | John Giuseffi | progress |
| 03/13/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 03/13/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 03/11/2026 | Final | John Giuseffi | progress |
| 03/11/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 02/19/2026 | Final | Ryan Hung | progress |
| 02/19/2026 | Final | Ryan Hung | progress |
| 02/17/2026 | Final | GLEN LANGER | progress |
| 12/23/2025 | Luminous Exit Path Markings | Ari Kamo | special |
| 12/23/2025 | Lighting controls | Ari Kamo | energy_progress |
| 12/23/2025 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 12/23/2025 | Final | Ari Kamo | progress |
| 12/23/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 12/23/2025 | Interior lighting power | Ari Kamo | energy_progress |
| 12/23/2025 | Energy Code Compliance Inspections | Ari Kamo | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Talbots | Retail | Floor 2 | Project M01387797 |
| Oxford | Office | Floor 12 | Project M01359692 |
| Conductor | Unknown | — | Project M08011805 |
| Fitch Ratings | Office | Floors 23, 24 | Project M00732970 |
| Delta Galil Industries | Office | Floor 17 | Project M00621651 Project M00621660 Project M00621663 Project M00618089 Project M00518186 |
| LT Apparel Group | Office | Floors 19, 20 | Project M00614500 Project M00614506 Project M00614515 Project M00614534 |
| Haddad Brands | Office | Cellar | Project M00513772 |
| Chase | Office | Ground | Project M00479659 |