← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
One Lincoln Plaza
20 WEST 64TH STREET · BIN 1027472
💬 Discuss this project
1970Year Built
42Stories
RMBuilding Class
C4-7Zoning
973,738 sfGross Floor Area
664Units
LL97 CoveredRent Stabilized0 Active Violations 9 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: One Lincoln Plaza Condominium · 59,822 sf lot · 16.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPipe scaffold installation2 filings
RoofCooling tower, air handlers, and piping replacement2p · 4 filings · 20 docs
BulkheadCooling tower, air handlers, and piping replacement2p · 1 filing · 10 docs
Floor 42Unit PH6
Floor 41
Floor 40
Floor 39
Floor 38Unit 38D, Unit 38F, Unit 38T4 filings · 20 docs
Floor 37Unit 37EFGUnder Construction1p · 5 filings · 20 docs
Floor 36Eureka Film Productions, Unit 36P1 filing · 11 docs
Floor 35
Floor 34
Floor 33Unit 33GH2 filings · 18 docs
Floor 32Unit 32F3 filings · 16 docs
Floor 31
Floor 30Unit 30A, Unit 30R2p · 3 filings · 20 docs
Floor 29
Floor 28Unit 28L1 filing · 4 docs
Floor 27
Floor 26
Floor 25
Floor 24Unit 25P1 filing · 10 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19Unit 20L10p · 1 filing · 18 docs
Floor 18Unit 18D1 filing · 3 docs
Floor 17
Floor 16Unit 16T1 filing · 10 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Unit 11E1 filing · 9 docs
Floor 10
Floor 9
Floor 8One Lincoln5p · 6 filings · 20 docs
Floor 7Industrious, One Lincoln, Unit 3M +1Under Construction30p · 13 filings · 20 docs
Floor 6Viam Robotics, One Lincoln +14p · 9 filings · 20 docs
Floor 5Lincoln Plaza Cellar condenser water piping installation1 filing · 10 docs
Floor 4Lincoln Plaza Cellar condenser water piping installation1 filing · 10 docs
Floor 3Lincoln Plaza Cellar condenser water piping installation1 filing · 10 docs
Floor 2Lincoln Plaza Cellar condenser water piping installation1 filing · 10 docs
Floor 1The Dinex Group, Boulud Restaurant +2Under Construction19p · 12 filings · 20 docs
MezzanineThe Dinex Group2p · 1 filing · 12 docs
CellarThe Dinex Group, Boulud Restaurant +1Under Construction26p · 9 filings · 20 docs
Sub-CellarThe Dinex Group, One LincolnUnder Construction5p · 5 filings · 20 docs
BasementOne Lincoln1p · 1 filing · 9 docs
Site & exteriorThe Dinex Group6 filings · 20 docs
Filed — no permit issuedOne Lincoln Plaza Condominium-ogden3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
20 West 64th Street Associates9703/21/2026
One Lincoln Plaza Concominiu8607/08/2026
20 West 64 St Associates903/21/2026
Ogden Capital Properties703/21/2026
1 Lincoln PL Condo703/21/2026
Milstein Properties603/21/2026
Ogden Cap Construction503/21/2026
NX211 Equity403/21/2026
Halcyon403/21/2026
Kamdia403/21/2026
Timfanel303/21/2026
Lincoln Plaza 23R203/21/2026
20 W 64th203/21/2026
Dinex Group203/21/2026
Mastic Associates NY LLC by Ogde203/21/2026
Odgen Cap Properties103/21/2026
One Lincon Plaza Associates103/21/2026
Chase Manhattan Bank103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC Expediting403/21/2026
Archetype Consultants1403/21/2026
Spring Scaffolding1203/21/2026
Clarke Construction Consultants1003/21/2026
Noel Building Consulting803/21/2026
Metropolis Group8403/21/2026
A+ Expediting203/21/2026
Hlzae203/21/2026
Ecdesign Studio603/21/2026
Premier Expediting Services103/21/2026
Shadow Architects203/21/2026
Reliable Expediting203/21/2026
J.A.M. Associates203/21/2026
NYC Department of Buildings103/21/2026
AE Design Solution203/21/2026
Arinnity NYC203/21/2026
Bazini Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1607/08/2026
Taconic BuildersGeneral Contractor1307/08/2026
Structure ToneGeneral Contractor1007/08/2026
Archstone BuildersGeneral Contractor1007/08/2026
Emcor Services NY/NJGeneral Contractor1007/08/2026
Donato PlumbingPlumbing807/08/2026
Lake ContractingGeneral Contractor707/08/2026
CPM BuildersGeneral Contractor707/08/2026
Tower Fire ProtectionFire Protection407/08/2026
Rael Automatic Sprinkler CoFire Protection407/08/2026
Vezandio ContractingGeneral Contractor407/08/2026
Macro ConstructionGeneral Contractor307/08/2026
Joseph RizzutiGeneral Contractor303/21/2026
Water Dynamic P & HPlumbing207/08/2026
CPM BuildersScaffold207/08/2026
Complex DevelopmentGeneral Contractor207/08/2026
Ariana ContractingFire Protection206/28/2026
CM PlumbingPlumbing207/08/2026
KJK ElectricElectrical203/22/2026
KG SprinklerFire Protection207/08/2026
Paul Quinn Plumbing & HeatingPlumbing207/08/2026
Hello ChapterGeneral Contractor107/08/2026
LXC ConstructionGeneral Contractor104/09/2026
Mea ConstructionGeneral Contractor107/08/2026
PLNGeneral Contractor107/08/2026
Samiro ServicesGeneral Contractor104/09/2026
SGC ContractingGeneral Contractor107/08/2026
Star Renovations NYGeneral Contractor107/08/2026
Tomak GroupGeneral Contractor104/09/2026
Active SignsSign hanger109/12/2026
Five Town Neon Sign CoSign hanger107/08/2026
Amm General ContractingPlumbing107/08/2026
A.M.NPlumbing107/08/2026
Authentic PlumbingPlumbing107/08/2026
Copper PlumbingPlumbing106/28/2026
Europa Electric of NYElectrical103/21/2026
Rite Way HeatingPlumbing107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
Superior Plumbing & HeatingPlumbing107/08/2026
Mike Catsimalis Plumbing & HeatingPlumbing107/08/2026
Edwards RolandElectrical103/21/2026
Electl Contg Solutions CoElectrical103/22/2026
Throop Electric CoElectrical103/21/2026
Concorde Electrical ServicesElectrical103/21/2026
Hamilton WayneElectrical103/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
Jurgen H. Wriedt ElectricElectrical103/22/2026
Marinelli VitoElectrical103/21/2026
Omd ElectricalElectrical103/21/2026
Quantum ElectricElectrical103/21/2026
Rockmor Electric EnterprisesElectrical103/22/2026
Kraft ElectricElectrical103/21/2026
Blue Ribbon Electrical ContractorsElectrical103/21/2026
RNW ElectricElectrical103/21/2026
C C Controlled CombustionGeneral Contractor107/08/2026
Clune Construction CoGeneral Contractor104/08/2026
Design Smart NYCGeneral Contractor107/08/2026
Diavel DesignsGeneral Contractor107/08/2026
Gurri InstallationGeneral Contractor107/08/2026
Happy House ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP Inspections11023809/01/2026
MG Engineering8546404/23/2026
Metric Consulting and Ins1803604/15/2026
Jock Deboer, AIA - Sia7008203/26/2026
Shahrish Shuvo Engineering85241003/20/2026
Fang Architect5513302/26/2026
Hudson Peaks Consulting8381108/29/2025
Konoski Engineering9111106/06/2025
Ase Engineering5785104/09/2025
Steven R. Savino Architects1216103/24/2025
Hudson Union Architecture9266211/13/2024
Shadow Architect7962209/26/2024
World Design Architecture9323109/16/2024
RLM Engineering6913404/26/2023
Buildtech Engineering6369102/16/2023
Ryan Special Engineering2018401/20/2023
Alan D Marcus, PE1761301/10/2023
Alan Margolin & Associates423811/09/2022
Madsen Engineering5423210/26/2022
Howard L Zimmerman Architects1712107/18/2022
Benazzi Engineering5603107/12/2022
Winton Group Architecture4343304/22/2022
Robert F. Germain Jr. PE5100206/07/2021
M/P/S Engineering1588112/09/2019
Building Lifecycle
All (300)Filed (71)Permit Issued (63)Signed Off (37)Violation (4)Inspection (49)Objection (46)Special Inspection (30)
10/16/2026
Signed off — Alteration
M01221861-I1
10/09/2026
Filed — Alteration
SIGN REPLACEMENT INSTALLATION
M01452113-I1
10/06/2026
Objection resolved — Addressed
10/05/2026
Objection resolved — Addressed
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection resolved — Addressed
10/01/2026
Filed — No Work
M01468435-I1
09/28/2026
Signed off — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-I1
09/10/2026
Permit issued — Sign
M01399150-I1-SG
09/08/2026
Objection resolved — Addressed
09/01/2026
Filed — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-P7
09/01/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
08/27/2026
Objection raised — Other
08/27/2026
Special inspection requirement — Final
James King III
08/26/2026
Filed — No Work
M01451135-I1
08/12/2026
Signed off — Alteration
Modification of existing sprinkler system as per plans. There is no change in occupancy, use, or egress
M01240399-I1
08/10/2026
Signed off — Alteration
STRUCTURAL FOUNDATION FOR A NEW ELEVATOR PIT.
M01275438-S1
08/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
07/17/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
07/16/2026
Filed — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-P6
07/14/2026
Signed off — Alteration
Installation of demising partition. There is no change in occupancy, use, or egress.
M01234756-I1
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/13/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
06/29/2026
Signed off — Alteration
INTERIOR RENOVATION OF SERVICE CORRIDOR. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
M01259050-I1
06/23/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Sprayed fire-resistant materials
Nicolas Crosetto
06/23/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Final
Nicolas Crosetto
06/23/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Crosetto
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
06/23/2026
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
06/18/2026
Filed — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-P5
06/12/2026
Filed — Alteration
Herewith filing for installation of 3 signs (Boulud) as indicated on plans. No change in use, occupancy or egress.
M01399150-I1
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Crosetto
06/12/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
06/03/2026
Filed — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-P4
05/27/2026
Permit issued — General Construction
M01180917-I1-GC
05/15/2026
Signed off — Alteration
New mechanical duct layout, new diffusers, A/C units and related piping as per plans. There is no change in occupancy, use, or egress
M00665535-I1
05/11/2026
Filed — Alteration
Removal and Installation of plumbing fixtures and related piping as per plans. There is no change in occupancy, use, or egress
M01238420-P3
05/08/2026
Objection resolved — Resolved
05/05/2026
Signed off — Alteration
M01290571-I1
05/05/2026
Objection raised — Inspections
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offActive Signs09/10/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone05/27/2026
DOB NOWStructuralPermit IssuedMedcon Services01/07/2026
DOB NOWMechanical SystemsSigned-offStructure Tone01/02/2026
DOB NOWSprinklersPermit IssuedH M Sprinkler12/26/2025
DOB NOWPlumbingSigned-offHydro Plumbing & Heating12/24/2025
DOB NOWPlumbingPermit IssuedDonato Plumbing12/23/2025
DOB NOWMechanical SystemsPermit IssuedTaconic Builders12/16/2025
DOB NOWGeneral ConstructionPermit IssuedStructure Tone11/19/2025
DOB NOWMechanical SystemsPermit IssuedStructure Tone11/19/2025
DOB NOWPlumbingSigned-offDonato Plumbing11/12/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co11/06/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co11/06/2025
DOB NOWMechanical SystemsSigned-offStructure Tone10/31/2025
DOB NOWMechanical SystemsSigned-offStructure Tone10/29/2025
DOB NOWGeneral ConstructionSigned-offLXC Construction10/17/2025
DOB NOWPlumbingSigned-offAmm General Contracting10/17/2025
DOB NOWGeneral ConstructionSigned-offClune Construction Co10/08/2025
DOB NOWFoundationSigned-offMedcon Services10/03/2025
DOB NOWGeneral ConstructionSigned-offMedcon Services10/01/2025
DOB NOWConstruction FenceSigned-offMedcon Services10/01/2025
DOB NOWMechanical SystemsSigned-offMedcon Services10/01/2025
DOB NOWPlumbingSigned-offCopper Mechanical08/28/2025
DOB NOWSprinklersSigned-offAriana Contracting08/28/2025
DOB NOWStandpipeSigned-offAriana Contracting08/28/2025
DOB NOWMechanical SystemsSigned-offMedcon Services08/28/2025
DOB NOWGeneral ConstructionSigned-offJoseph Rizzuti08/12/2025
DOB NOWSignSigned-offEnrico Passaro08/01/2025
DOB NOWSprinklersSigned-offH M Sprinkler07/30/2025
DOB NOWPlumbingSigned-offDonato Plumbing07/30/2025
DOB NOWMechanical SystemsPermit IssuedStructure Tone07/28/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone07/15/2025
DOB NOWConstruction FenceSigned-offMedcon Services07/14/2025
DOB NOWGeneral ConstructionSigned-offMedcon Services07/09/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone07/08/2025
DOB NOWMechanical SystemsSigned-offSamiro Services06/30/2025
DOB NOWPlumbingSigned-offHydro Plumbing & Heating06/06/2025
DOB NOWPlumbingSigned-offSuperior Plumbing & Heating05/28/2025
DOB NOWGeneral ConstructionPermit IssuedLake Contracting05/22/2025
DOB NOWGeneral ConstructionSigned-offTomak Group05/12/2025
+ 60 more permits on file
4 projects · most recent 03/20/2026
Air Conditioning Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
03/20/2026Permit IssuedStructure ToneAir Conditioning Systems
Cooling
Vertiv MMD20WDXR0720ABC 20,900 BTU · Crac Unit ×2
MMD20W 570 BTU · Crac Unit ×1
11/12/2025Permit IssuedStructure ToneAir Conditioning Systems
Cooling
Climatemaster SC-024 23,700 BTU · Wshp ×2
11/01/2024Permit IssuedEmcor Services NY/NJCooling Towers
Cooling Tower
Baltimore Aircoil S3E-8518-07P/V 2,733 tons · Cooling Tower ×6
04/05/2022Signed-offArchstone BuildersAir Conditioning Systems
Cooling
Aaon SB-014-3-AE70A-000,SB-014-3-AE70A-000,SB-014-3-AE70A-000,SB-014-3-AE70A-000 136,200 BTU · Rooftop Unit ×4
Above Air MCW024S7000001GECUF22X2 26,600 BTU · Crac Unit ×1
2 projects · most recent 04/23/2026
FiledStatusContractorScope
04/23/2026Signed-offAriana Contracting212 heads, 2 outlets
11/12/2025Permit IssuedKG Sprinkler93 heads
7 projects · most recent 09/01/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/01/2026Signed-offCopper PlumbingGas, Water/Sanitary
04/23/2026———
11/12/2025Permit IssuedDonato PlumbingWater/Sanitary
11/06/2025Signed-offDonato PlumbingWater/Sanitary
10/07/2024Permit IssuedDonato PlumbingGas, Water/Sanitary
11/02/2022Permit IssuedDonato PlumbingGas, Water/Sanitary
12/10/2021——Water/Sanitary
25 projects · most recent 09/28/2026
General Wiring Lighting
FiledStatusContractorScope
09/28/2026Permit IssuedWCK ElectricGeneral Wiring
06/15/2026Permit IssuedJurgen H. Wriedt ElectricGeneral Wiring, Lighting
04/02/2026CompleteKJK ElectricGeneral Wiring
03/10/2026Permit IssuedTuxedo Electrical Contracting—
02/16/2026Permit IssuedGreen Apple Electrical ServicesGeneral Wiring
01/09/2026Permit IssuedKJK ElectricGeneral Wiring
01/08/2026Permit IssuedFreedom Electric & DataGeneral Wiring
10/15/2025Permit IssuedThe Metro Group ElectricGeneral Wiring
08/12/2025Permit IssuedFreedom Electric & DataGeneral Wiring
06/29/2025CompleteSunbird Electrical ContractingGeneral Wiring
05/21/2025CompleteLuna NYC ElectricGeneral Wiring
03/26/2024CompleteE-J Electric Installation CoGeneral Wiring
02/05/2024CompleteSD Electl Division NYC CoGeneral Wiring
10/18/2023CompleteD.R.P. Electrical ContractingGeneral Wiring
07/10/2023CompleteLTC Electrical ContractingGeneral Wiring
4 projects · most recent 04/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/15/2026Permit IssuedCPM BuildersSteel, Concrete, Masonry
06/17/2025Signed-offStructure Tone1 scope_items
12/17/2024——Steel
01/31/2022Signed-offEmcor Services NY/NJ1 scope_items
3 projects · most recent 04/15/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/15/2026Permit IssuedCPM BuildersTenant Protection Plan 72 Hour
04/13/2026Signed-offCPM BuildersTenant Protection Plan 72 Hour
08/13/2025Signed-offClune Construction CoTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 62
DateTypeResultReport
08/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/27/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/12/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2025Pass-Final Sign Permit InspectionPassView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 62.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/01/2026Energy Code Compliance InspectionsNicolas Crosettoprogress
09/01/2026Post-installed AnchorsNicolas Crosettospecial
09/01/2026Tenant Protection Plan Compliance—special
09/01/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
08/27/2026FinalJames King IIIprogress
07/17/2026Post-installed AnchorsNicolas Crosettospecial
07/17/2026Energy Code Compliance InspectionsNicolas Crosettoprogress
07/17/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/17/2026Tenant Protection Plan Compliance—special
07/13/2026Energy Code Compliance InspectionsNicolas Crosettoprogress
07/13/2026Post-installed AnchorsNicolas Crosettospecial
07/13/2026Tenant Protection Plan Compliance—special
07/13/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/23/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
06/23/2026Post-installed AnchorsSAMI HAJJAR P.Especial
06/23/2026FinalNicolas Crosettoprogress
06/23/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/23/2026MasonrySAMI HAJJAR P.Especial
06/23/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
06/23/2026Tenant Protection Plan ComplianceNicolas Crosettospecial
06/23/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
06/23/2026Structural Cold-Formed SteelSAMI HAJJAR P.Especial
06/23/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
06/23/2026Sprayed fire-resistant materialsNicolas Crosettospecial
06/23/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Dinex GroupRestaurant / Food ServiceSub-cellar, Cellar, Floor 1
Project M01399150 Alteration · Permit Entire · 06/12/2026
Project M01238337 No Work · Approved · 03/11/2026
Project M01275438 Alteration · Permit Entire · 08/29/2025
Project M01238307 Alteration · Permit Entire · 08/19/2025
Project M01238420 Alteration · LOC Issued · 08/19/2025
Project M01238302 Alteration · Permit Entire · 06/30/2025
IndustriousOfficeFloor 7
Project M01290568 Alteration · Permit Entire · 10/09/2025
Project M01240986 Alteration · Permit Entire · 07/11/2025
Project M01241015 Alteration · LOC Issued · 07/11/2025
Project M01241038 Alteration · LOC Issued · 07/10/2025
Boulud RestaurantRestaurant / Food ServiceCellar, Floors 1, 6, 7
Project M01240399 Alteration · LOC Issued · 08/19/2025
Project M00614361 Alteration · LOC Issued · 11/10/2021
Project M00610454 Alteration · LOC Issued · 11/09/2021
Cafe FiorelloRestaurant / Food ServiceFloor 1
Project M01221861 Alteration · LOC Issued · 06/06/2025
Eureka Film ProductionsResidentialFloor 36
Project M01060697 Alteration · LOC Issued · 07/29/2024
Viam RoboticsOfficeFloor 6
Project M00665535 Alteration · LOC Issued · 04/05/2022
Project M00657632 Alteration · LOC Issued · 03/03/2022
Project M00665515 Alteration · LOC Issued · 03/03/2022
Project M00665561 Alteration · LOC Issued · 03/03/2022
Project M00665616 Alteration · LOC Issued · 03/03/2022
One LincolnOfficeFloors 6–8
Project M00650146 Alteration · LOC Issued · 01/26/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,370 on file (BIS + DOB NOW)
▸Plans & Drawings123
▸DOB NOWPlans/Sketch111
09/03/2026M00495901-P1Request digital key ↗
09/03/2026M00512558-I1Request digital key ↗
09/03/2026M00495926-I1Request digital key ↗
Showing 3 of 111 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/04/2026M00459896-P1Request digital key ↗
09/04/2026M00459896-P3Request digital key ↗
09/04/2026M00459896-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00319793-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
10/04/2026M01468435-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00460321-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00263019-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00368829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits634
▸BISPLAN / WORK APPROVAL APPLICATION341
12/17/2025121927095Open ↗
11/19/2025104764499Open ↗
11/13/2025104764499Open ↗
Showing 3 of 341 on file for this type
▸BISWORK PERMIT APPLICATION277
01/20/2026121927095Open ↗
11/15/2021140603381Open ↗
02/16/2021140997713Open ↗
Showing 3 of 277 on file for this type
▸BISPLACE OF ASSEMBLY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
05/22/2020123911115Open ↗
05/22/2020123911115Open ↗
05/22/2020123911115Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications895
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION363
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 363 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature126
10/14/2026M01452113-I1Open ↗
10/04/2026M01468435-I1Open ↗
09/15/2026M01238420-P7Open ↗
Showing 3 of 126 on file for this type
▸DOB NOWProgress Inspector Seal & Signature113
10/14/2026M01452113-I1Open ↗
10/02/2026M01060697-P1Open ↗
10/02/2026M01060697-P1Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature107
10/02/2026M01060697-P1Open ↗
09/23/2026M01238420-P7Open ↗
09/23/2026M01240399-I1Open ↗
Showing 3 of 107 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST70
08/10/2020140687923Open ↗
03/02/2020123482917Open ↗
Showing 2 of 70 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM49
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 49 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT40
01/26/2021140997713Open ↗
Showing 1 of 40 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION14
01/26/2021140997713Open ↗
Showing 1 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY13
01/26/2021140997713Open ↗
Showing 1 of 13 on file for this type
▸Trade Schedules & Equipment282
▸BISSCHEDULE B - PLUMBING87
12/17/2025121927095Open ↗
Showing 1 of 87 on file for this type
▸BISSELF-CERT PLUMBING NOTICE85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE44
02/07/2020123277774Open ↗
02/06/2020123277774Open ↗
Showing 2 of 44 on file for this type
▸BISEQUIPMENT USE PERMITS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-859
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection38
▸BISTenant Protection Plan and Notes27
06/25/2021140331923Open ↗
Showing 1 of 27 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00368829-I1Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN 2008 CODE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos261
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'76
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 76 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report72
09/15/2026M01238420-P7Open ↗
09/03/2026M00495901-P1Open ↗
09/03/2026M00495926-I1Open ↗
Showing 3 of 72 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)63
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 63 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form25
09/04/2026M00368829-I1Open ↗
09/03/2026M00556870-I1Open ↗
09/02/2026M00665561-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM8
08/31/2022123068544Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)7
07/07/2021140923446Open ↗
Showing 1 of 7 on file for this type
▸Energy Compliance169
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS67
03/10/2020123482917Open ↗
Showing 1 of 67 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS34
08/26/2022123068544Open ↗
08/17/2020123482917Open ↗
Showing 2 of 34 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY18
02/20/2026121927095Open ↗
02/19/2026121927095Open ↗
11/29/2022123885830Open ↗
Showing 3 of 18 on file for this type
▸BISTR8: Energy Code Progress Inspections16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis7
09/02/2026M00665535-I1Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
09/23/2025121927095Open ↗
11/29/2022123885830Open ↗
07/07/2021140923446Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
09/02/2026M00665535-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY43
02/20/2026121927095Open ↗
02/19/2026121927095Open ↗
11/29/2022123885830Open ↗
Showing 3 of 43 on file for this type
▸Approvals, Objections & Sign-offs278
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST150
11/29/2022123885830Open ↗
09/02/2022140997713Open ↗
08/31/2022123068544Open ↗
Showing 3 of 150 on file for this type
▸BISADMINISTRATIVE OBJECTIONS82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION26
11/15/2021140603381Open ↗
11/15/2021140603381Open ↗
07/22/2020123068544Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
11/13/2025104764499Open ↗
11/05/2025104764499Open ↗
11/03/2025104764499Open ↗
Showing 3 of 10 on file for this type
▸BISSHED LETTER5
11/13/2020140603381Open ↗
11/13/2020140603381Open ↗
Showing 2 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/03/2026M00512558-I1Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership255
▸BISCOST AFFIDAVIT247
08/26/2022123068544Open ↗
11/04/2020123158698Open ↗
08/17/2020123482917Open ↗
Showing 3 of 247 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
10/21/2025121927095Open ↗
11/29/2022123885830Open ↗
03/04/2022121642124Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms316
▸BISEFILING COVER SHEET140
02/09/2022123914684Open ↗
09/08/2021123905239Open ↗
08/26/2021123905239Open ↗
Showing 3 of 140 on file for this type
▸BISADDITIONAL INFORMATION88
11/19/2025104764499Open ↗
10/29/2025104764499Open ↗
03/10/2022123914684Open ↗
Showing 3 of 88 on file for this type
▸BISBOROUGH INTAKE FORM64
01/20/2026121927095Open ↗
02/09/2022123914684Open ↗
11/15/2021140603381Open ↗
Showing 3 of 64 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET24
01/26/2021140997713Open ↗
Showing 1 of 24 on file for this type
▸Other Documents37
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION30
03/10/2022123914684Open ↗
03/10/2022123914684Open ↗
02/11/2022123914684Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type